Loading...
17-103083 Electrical City of Federal Way E Permit #:17-103083-00-EL Community Development Dept. F ' 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax (253)835-2609 Project Name: PINTER Project Address: 30245 21ST AVE S Parcel Number:798290 0130 Project Description: Replace meter set,extend new wire into service panel,upgrade service panel Owner Applicant Contractor JEFFREY PINTER JEFF PINTER OWNER IS CONTRACTOR 24432 224TH AVE SE 24432 224TH AVE SE MAPLE VALLEY WA 98038 MAPLE VALLEY WA 98038 USA Additional Permit Information Is this an Online or O.T.C.application? Yes Alt. Serv./Feeder:0 to 200 ami 1 PERMIT EXPIRES Thursday,28 June,2018 Permit Issued on Wednesday,June 28,2017 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: 0 r\I 1 E Date: Vk Sl. -'2 7 Pkvtal sLled;G,1t A% ,.(5c Sril LE, , , Lz) s 1rvci-cv ("ccs i • I • , THIS CARD IS TO REMAIN ON-SITE CITY Construction Inspection Record Federal Way INSPECTION REQUESTS:(253)835-3050 PERMIT#: 17 103083 00 Address: 30245 21ST AVE S Project: JEFFREY PINTER FEDERAL WAY WA 98003 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. UFER Ground(4295) ® Ditch cover(4030) 3❑ Slab/Concrete Floor(4255) Approved Approved Approved to place concrete By Date By Date , By Date ® Pool Bonding(4195) El Temporary Power(4275) ® Service(4235) Approved Approved Approved .By Date ..By Date ..By P� ,� Date ri..„.X .4) • 0 Feeders/Sub-panels(4045) ® Rough Electrical(4225) ' ® Ceiling Cover(4020) Approved Approved Approved .By Date By Date By Date I=1 Final-Electrical(4055) Approved By " Date 7(21111 / 0 Rough Electrical 0Final Electrical 0 Right of Way Approved Approved . - Approved By Date By Date By Date