Loading...
17-102679 City of Federal Way Mechanical Permit #:17-102679-00-ME Community Development Dept 8 . LE 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 Project Name: HUPPE Project Address: 1112 SW 338TH ST Parcel Number:957850 0830 Project Description: Install 4-ton a/c unit Owner Applicant Contractor RAYMOND HUPPE JAIMIE HOWBRENNAN HEATING&A/C BRENNAN HEATING&A/C LLC 1112 SW 338TH ST 4601 S 134TH PL (GENERAL 01) FEDERAL WAY WA 98023 SEATTLE WA 98168 BRENNHA971R9(12/29/17) USA 4601 S 134TH PL TUKWILA WA 98168 Additional Permit Information Mechanical Work Valuation? 3800 Is this an Online or O.T.C.application? Yes ass' as �' �`��` ,H sl^,'�� � • Air Conditioners-Stand Alon( 1 PERMIT EXPIRES Monday,4 December,2017 Permit Issued on Wednesday,June 7,2017 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Wash.(' n• tr.C.ir if F Way. Owner or agent: w " x Date: THIS CARD IS TO REMAIN ON-SITE CITY OF Construction Inspection Record Federal Way INSPECTION REQUESTS:(253)835-3050 PERMIT#: 17 10267900 Address: 1112 SW 338TH ST Project: RAYMOND HUPPE FEDERAL WAY WA 98023 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. a .41 0 ❑ 3 Mechanical Rough-in(4165) Ei Gas Piping(4125) Final-Mechanical(4065) Approved Approved to release test Approved By Date By Date By _41. Date ez,.Ta- 9'7 ❑ Rough Electrical ❑ Final Electrical ❑ Right of Way Approved Approved Approved By Date By Date By Date