17-100425 City of Federal WaFILE Mechanical
Community Development Dept. Permit #:17-100425-00-ME
33325 8th Ave S
Federal Way,WA 98003 Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax:(253)835-2609
Project Name: BAE
Project Address: 841 SW 354TH ST Parcel Number:066231 0660
Project Description: Replace gas furnace and install 4-ton a/c
Owner Applicant Contractor
AUGUSTINE BAE JAIMIE HOWBRENNAN HEATING&A/C BRENNAN HEATING&A/C LLC
841 SW 354TH ST 4601 S 134TH PL (GENERAL 01)
FEDERAL WAY WA 98023-8124 SEATTLE WA 98168 BRENNHA971R9(12/29/17)
4601 S 134TH PL
TUKWILA WA 98168
Additional Permit Information
Mechanical Work Valuation? 8100 Is this an Online or O.T.C.application? Yes
Air Conditioners-Stand Alom 1 Furnaces 1
PERMIT EXPIRES Saturday,29 July,2017
Permit Issued on Monday,January 30,2017
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: F'J
L I I J E Date:
fa2
•
., ,z4 THIS CARD IS TO REMAIN ON-SITE
Federal Way Construction Inspection Record
INSPECTION REQUESTS:(253)835-3050
PERMIT#: 17 100425 00 Address: 841 SW 354TH ST
Project: AUGUSTINE C BAE FEDERAL WAY WA 98023-8124
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
•
El Mechanical Rough-in(4165) El Gas Piping(4125) C Final-Mechanical(4065)
Approved Approved to release test Approved
,By Date •4By Date By Q ___ Date 2-a__1`-
•
0 Rough Electrical 0 Final ElectricalElRight of Way
Approved Approved Approved
By Date By Date By Date