Loading...
17-100733 1 Mechanical City of Federal Way FILE Permit #:17-100733-00-ME Community Development Dept. 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 Project Name: GARNER Project Address: 248 S 300TH ST Parcel Number:692860 0190 Project Description: Run gas line,frame in for built in gas fireplace****REVISED 2/17/17 TO REMOVE FRAME- IN FOR GAS FIREPLACE,PERMIT FOR GAS PIPING AND INSTALLATION OF FIREPLACE ONLY*** Owner Applicant Contractor YOLANDA GARNER ED BANKERALL AMERICAN CHIMNEY ALL AMERICAN CHIMNEY SERVICE& 248 S 300TH ST SERVICE&REPAIR INC REPAIR INC FEDERAL WAY WA 29222 112TH AVE SE ALLAMCSO44NK(11/15/18) 98003-3631 AUBURN WA 98092 29222 112TH AVE SE AUBURN WA 98092 Additional Permit Information Mechanical Work Valuation? 1700.00 Is this an Online or O.T.C.application? Yes Fireplace Inserts 1 Gas Piping 1 CONDITIONS: Separate Building Permit Required for wall framing of gas fireplace PERMIT EXPIRES Sunday, 13 August,2017 Permit Issued on Tuesday,February 14,2017 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: ONLINE LDate: PR.l Nr To v Fes' PI OJ lam- [frt o Y1 I • t , . THIS CARD IS TO REMAIN ON-SITE � °� Construction Inspection Record Federal vvay INSPECTION REQUESTS:(253)835-3050 PERMIT#: 17 100733 00 Address: 248 S 300TH ST Project: KEITH 0 GARNER FEDERAL WAY WA 98003-3631 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. /❑ Mechanical Rough-in(4165) ,• 2 Gas Piping(4125) .4,4/ . Final Mechanical 4065 , I �- ❑ 3 ( ) Approved Approved to release test Approved 1 �By Date I* •••Date ��By Date 2/2 )i7 0 Rough Electrical 0 Final Electrical . ❑ Right of Way Approved Approved Approved By Date By Date By Date