Loading...
17-100392 • . Mechanical City of Federal Way Permit #:17-100392-00—ME Community Development Dept. 33325 8th Ave S L Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 Project Name: DASH POINT STATE PARK BLDG 4 Project Address: 5700 SW DASH POINT RD Parcel Number: 102103 9002 Project Description: Install ductless heat pump at residential building 4 Owner Applicant Contractor WASHINGTON STATE PARKS TAYLER MILLERADVANCED FILTER& ADVANCED FILTER&MECHANICAL PO BOX 42668 AVE SE MECHANICAL INC(GENERAL) OLYMPIA WA 98504 418 NW VALLEY AVE ADVANFM044RD(12/29/18) PUYALLUP WA 98371 910 VALLEY AVE NW SUITE 104 PUYALLUP WA 98371 • Additional Permit Information Mechanical Work Valuation? 5188.09 . Is this an Online or O.T.C.application? Yes '.�„ a�,..-- �?��",r/...,;:����/✓��v.H✓�'...,�,��re���� ...,�,��t,�i °4,u'�;�i3��A%l w�,>.�ai P3, vi>� n„�*��1,,, m �:�yr,,,; z�vs.Y'/',w.,,.,�,,,E.a �„s,�5,h,€�E<EEt Compressors/Heat Pumps 1 PERMIT EXPIRES Tuesday,25 July,2017 Permit Issued on Thursday,January 26,2017 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City ofFederal Way. Owner or agent: oNILINE Date: i - , ,. TILS CARD IS TO REMAIN ON-SITE �rr� Construction Inspection Record . : Federal Wad/ INSPECTION REQUESTS:(253)835-3050 PERMIT#: 17 100392 00 Address: 5700 SW DASH POINT RD Project: WASHINGTON STATE PARKS FEDERAL WAY WA 98023-2045 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. El Mechanical Rough-in(4165) El Gas Piping(4125) 0 Final-Mechanical(4065) Approved Approved to release test Approved •By Date By Date ByCAN! Date 2... 21... I 1 • 0 Rough Electrical 0 Final Electrical El Right of Way Approved Approved Approved By Date By Date By Date