10-101953 Building - Multi Farilily
City of Federal Way
Community Development Services • .,,r^ r Permit #: 10-101953-00-MF
P.O.Box 9718 ,� i ;r.
Federal Way,WA 98063-9718 ) ski Inspection Request Line:
Ph:(253)835-2607 Fax (253)835-2609 ' p q (253)835-3050
Project Name: WESTBORO APTS UNIT A,B,C,&D
Project Address: 121 S 330TH ST Bldg)1(26, Parcel Number: 172104 9130
Project Description: REP- 1st and 2nd floor deck repair.Tear off decking and replace.waterproof/flashing
when needed.Possible post replacement if/when needed.
Owner Applicant Contractor Lender
WINTER HOLLY LTD PARTNERS 0 J CONSTRUCTION 0 J CONSTRUCTION WINTER HOLLY LTD PARTNERS
PO BOX 688 21103 75TH ST E OJCON**094M5(10/24/10) PO BOX 688
MERCER ISLAND,WA 98040-0688 BONNEY LAKE WA 98168 21103 75TH ST E MERCER ISLAND,WA 98040-0688
BONNEY LAKE WA 98168
Census Category: 437- Commercial alt/add/conversion
Includes: #1 #2 #3 #4
Occupancy Class:
Construction Type:
Occupancy Load:
Floor Area(sq. ft.) 0 0 0 0
,',"''Sr'''',.
Mechanical to be Included?` No Number of Stories..... . 2
Permit for Building Shell Only' No Plumbing to be Included? No
-,,-,t'''<
,t;
c a e+ �r,,-k *AIs4 ''' '.,11.i ,4,$ ✓q y��• .✓yr z r 4 �7 0 ' y �Iy ' k f'3 ' v ';
PERMIT EXPIRES Monday, November 8, 2010
Permit Issued on Wednesday, May 12, 2010
I hereby certify that the above information is correct and that the construction on the above described propertyand
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of.Federal Way.
Owner or agent: �,� '% _,/ . Date: 3 — /2 - 7.—d /0
twAttz ? f4//O
,
THIS CARD IS TO AIN ON-SITE
cr<,ror • Construction In ction Record
Federal Way INSPECTION REQU TS: (253)835-3050
PERMIT#: 10-101953-00-MF Address: 121 S 330TH ST Bldg X.Z69
Owner: WINTER HOLLY LTD PARTNERS FEDERAL WAY, WA 98003-6304
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
o SWM Precon Site Mtg(4400) ❑ Initial Erosion Control(4365) Footings/Setback(4110)
Approved To be done prior to breaking ground Approved to place concrete
By Date By Date By Date
. .
El Foundation Wall(4115) El Drainage/Downspout(4040) ❑ Re-steel(4215)
Approved to place concrete Approved to backfill Approved to place concrete or grout
By Date By Date By Date
'
El Slab/Concrete Floor(4255) 0 Underfloor Framing(4285) ❑ Floor Sheathing(4105)
Approved to place concrete Approved to sheath floor Approved to install flooring
By Date By Date By Date
El Shear Walls (4245) ❑ Roof Sheathing(4220) El Fire/Draft Stops(4095)
Approved to install siding Approved to install roofing Approved
By Date By Date By Date
Interim Erosion Control(4370) Prior to scheduling a Framing inspection; El
Framing(4120)
Approved Approved to insulate
Electrical,Plumbing&Mechanical Rough-in and
Fire/Draft Stop inspections must be signed-off and
By Date approved. IBC 109.3.4 By Date
El Insulation (4150) 0
Gypsum Wallboard Nailing(4130) ❑ Suspended Ceiling Grid (4265)
Approved to install wallboard Approved to install mud&tape Approved to drop tile
By Date By Date By Date
O Final-Fire Department(4060) 0 Final Erosion Control (4375) Final-Building(4050)
Approved Approved �j Approved
By Date By Date By /E Csl" Date 8' ‘)
❑ Rough Electrical Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date
0 - 10 I 66.3
R
eraWay
,....,.. .A.. . PERMIT
4 ECEIbc° ME PL IDE EN FP
Way Ekl
(TAM A ITY LIE VELOPVIENT SERVICES APPLICATION
25I-83.',2007.F.AX 253-835-2609
2E2RCAL WAY
,,,,).,,,,,,
1 iii3(0' '"'"•`t',:1,,,,
CITY OF MAFY E1 D
14 SITE ADDRESS UI sem#/4,,i3_,‘ -0
CDR. ...
4/ ire A-pir, 42/ 5 ...?:i0).-'- iCe-kr...,,,/ itio4 cf.,- geoa_5- ..,._. ..w. /g'
PROJECT VALUATION ZONING ASSESSOR'S TAX/PARCEL#•
$
/ i 7 Z.. •-•-• -
TYPE OF PERMIT OeBUILDING 0 PLUMBING 0 MECHANICAL
0 DEMOLITION 0 ENGINEERING 0 FIRE PREVENTION
NAME OF PROJECT
(Tenant Name/Homeowner Last Name)
PROJECT DESCRIPTION *Thel i•N• et efC, k r‘l—i I We'rprZl•eA
Detailed description of work to
be included on this permit only
7 ....„ , PRIMARY PHONE
PROPERTY OWNER 206-'I Yr- Yiee f2A4* JO?
MAILING ADDRESS E-MAIL
/ Ve2 Vie, 7)1,iev''.- 4,-...,Ave-Ci 5-24.Zi
CITY STATE ZIP
774 (14,.;' k ix/e. 9 e 8,/b2r
N ilk r ,,,, PHONE
't .,...J, C,,,hrif-1,24100-, ‘22S:3-67/- P9Yo
MAILING ADDRESS PAWL,
CONTRACTOR (?7)ii›..? ?Sir'"'S7' Er t kit ir' o,,..Pg"-e.eriff,/e'er,. •Ce,•""'`'.,
,%.„TY STATE ZIP. FAX
klentlel L .it,- la Vg7-19.—/
WA STATE CONTRACTOR'S LICENSE# EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE#
0..laiti-9‘.%e.39 wil 3.— ii, V /Ie
NAME, p, PHONE
0 ia * ---./0 4,4s-0.---- 0239 -61"1- 9,/0
APPLICANT MAILING ADDRESS ,, E-MAIL
ii O 7 7$' 57* f ife-t,k0--1Z4G-'1143,12 4e0geev,...
CITY STATE ZW...... FAX
Pend", Laie- tc4,
PROJECT CONTACT N v l/ PHONE
s J,) h‘i„e0 -,- 4,,12s-,Y--69/.-?9 Yo
(The individual to receive and
MAILING ADDRESS ,,
respond to all correspondence
concerning this application) 2 1/A 2,s-7°- ST .ir 're oricioodez,"...
g4E-MAI,41.*jczgo,„
CITY STAT zig..„ _ FAX
et.'oey :4‘zie tiVec Y Fik /
ALTERNATE ciaNTAcT NAME: PHONE E-MAIL
PROJECT FINANCING NAME
gel OWNER-FINANCED
Required value of$5,000 or more
(RCW 19 27 095) MAILING ADDRESS,CITY,STATE,ZIP PHONE
I certify under penalty of perjury that I am the property owner or authorized agent of the property owner.I certify that to the best
of my knowledge, the information submitted in support of this permit application is true and correct.I certify that I will comply with
all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the
issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating
construction or environmental laws.
I further agree to hold harmless the City of Federal Way as to any claim(including costs, expenses, and attorneys'fees incurred in
the investigation and defense of such claim), which may be made by any person, including the undersigned, and filed against the city,
but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the
information supplied to the city as a part of this application.
SIGNATURE: (4)6e, la.-- DATE 4.5.7://'– 00/0
.01 zt
PRINT NAME: (. 4-e. • g' %/4"53 4^1--r4:44--
Bulletin#100-April 14,2010 Page 1 of 3 k:\Handouts\Permit Application