Loading...
16-104369 Electrical City of Federal Way (� Community&Econ.Dev.Services FINALEDpermit #: 16-104369-00-EL 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: Ph:(253)835-2607 Fax:(253)835-2609 p q (253)835-3050 Project Name: EVERGREEN COURT APARTMENTS BUILDING C Project Address: 33015 19111 LN S Bldg C Parcel Number: 797880 0460 Project Description: Installation of ERV&controls in units 7,8,9,& 10. Owner Applicant Contractor KING COUNTY HOUSING AUTHORITY RIVERTON ELECTRICAL SERVICES RIVERTON ELECTRICAL SERVICES 600 ANDOVER PARK W 4116 S 131ST ST RIVERES851LA(6/1/17) TUKWILA WA 98188-3326 TUKWILA WA 98168 4116 S 131ST ST TUKWILA WA 98168 Additional Permit Information Electrical Work Valuation? 2000 Is this an Online or O.T.C.application Yes Is Use Educational or Institutional No Service greater than 999 Amps? No Electrical Fixtures Circuits-Multi-family 4 PERMIT EXPIRES Saturday, September 2, 2017 Permit Issued on Friday, September 2, 2016 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: FILE 440& THIS CARD IS TO REMAIN ON-SITE CITY 011. s Construction Inspection Record I . Federal Way INSPECTION REQUTS: (253)835-3050 PERMIT#: 16-104369-00-EL Address: 33015 19TH LN S Bldg C Project: KING COUNTY HOUSING AUTHOR FEDERAL WAY, WA Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD, Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. UFER Ground (4295) ❑ Ditch cover(4030) 0 Slab/Concrete Floor(4255) Approved Approved Approved to place concrete By Date By Date By Date • 0 Pool Bonding(4195) ❑ Temporary Power(4275) Ei Service(4235) Approved Approved Approved By Date By Date By Date ' 0 Feeders/Sub-panels(4045) 0 Rough Electrical(4225) Ceiling Cover(4020) Approved Approved Approved By Date By Date By Date / Final-Electrical(4055) Approved Bylir. „ Date et—' T (/„ ❑ Rough Electrical El Final Electrical Right of Way Approved Approved ElApproved By Date By Date By Date RECEIVED .`i".1." 0 '2 Zd16 „�� CrOF FEDERAL ELECTRICAL Federal Way CDS PERMIT APPLICATION 123016 /'(0 — Lb 3 - �_ SUITE/UNIT/SPACE i SITE ADDREP° 39th Lane S Building C Federal Way Units 7,8,9,10 PROJECT VALUATION ASSESSOR'S TAY/PARCEL i CURRENT/PROPOSED USE 2000.00 7 9 7 8 8 0 - 0 4 6 0 — PROJECT NAME — — (Tenant or Homeowner Last Name) Evergreen Court Apartments Install ERV and fan switch PROJECT DESCRIPTION Detailed description of work to be included on this permit only NAME PRIMARY PRONE PROPERTY OWNER King County Housing Authority ( 206)612 - 0062 RAI.QO ADDRESS E-MAIL Andover Park W STE 0 dana@kcha.com CITY STATE WF FAX Tukwila WA 98188 ( ) - NAME PRIMARY PHONE Riverton Electrical Services ( 206) 280. 0371 MAILING ADDRESS E-MAIL ELECTRICAL 4116 s 131st st will@rivertonelectrical.com CONTRACTOR Tukwila WA 98168 FAX ( ) • WA STATE CONTRACTOR'S LICENSE I EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE A RIVERES851 LA 6 01 2017 20"16"104159-00-bI NANCE PRIMARY PRONE APPLICANT Riverton Electrical Services (206 ) 280 - 0371 MAHiR)ADDRESS EMAIL 4116 s 131st st will@rivertonelectrical.com CITY STATE ZIP FAX tukwila WA 98168 ( ) - NAME PRIMARY PRONE PROJECT CONTACT Will Gillispie (206 ) 280 -0371 I osrttfy ander penalty ofperfary that I em the property owner or authorised agent of the property owner.I certify that to the best of my knowledge,the information submitted in support of this permit application is true and correct.I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorised by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim(including costs,expenses,and attorneys'fees incurred in the investigation and defense of such claim),which may be made by any person,including the undersigned,and filed against the city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information suppliedlto the city as(apart of this application. SIGNATURE: O.tC Ila, bernd, DATE 8/31/2016 PRINT NAME: Alay Boggs �0 D0 PERMIT CENTER+33325 8th Avenue South+Federal Way,WA 98003-6325 253-835-2607+FAX 253-835-2609+permitcenter@cityoffederalway.com Bulletin#160—April 14,2016 Page 1 of 1 k:\i-Iandouts\Electrical Permit Application