17-103907 .. •
Electrical
Communi
City ty ofDevelopFederal Wment ayDept. F I I Permit #:17-103907-00—EL
33325 8th Ave S
Federal Way,WA 98003 Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax:(253)835-2609
Project Name: SUMMERS
Project Address: 32521 6TH AVE SW Parcel Number:926490 2210
Project Description: Install electrical for gas water heater and furnace
Owner Applicant Contractor
HERMAN SUMMERS GAVIN LUMSDENCOPPER CREEK COPPER CREEK ELECTRIC INC
32521 6TH AVE SW ELECTRIC INC COPPECE984KP(5/18/18)
FEDERAL WAY WA 98023 PO BOX 1773 PO BOX 1773
ORTING WA 98360
ORTING WA 98360
Additional Permit Information
Is this an Online or O.T.C.application Yes
{
Circuits-Residential 2
PERMIT EXPIRES Thursday, 16 August,2018
Permit Issued on Wednesday,August 16,2017
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: Ot\ILII\IE Date:
A a
THIS CARD IS TO REMAIN ON-SITE
CITY OF Construction Inspection Record
Federal Way INSPECTION REQUESTS:(253)835-3050
PERMIT#: 17 103907 00 Address: 32521 6TH AVE SW
Project: HERMAN W SUMMERS FEDERAL WAY WA 98023-5622
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
`® UFER Ground(4295) ...CI Ditch cover(4030) ® Slab/Concrete Floor(4255)
Approved Approved Approved to place concrete
By Date By Date By Date
® Pool Bonding(4195) El Temporary Power(4275) ® Service(4235)
Approved Approved Approved
By Date By Date By Date
® Feeders/Sub-panels(4045) ® Rough Electrical(4225) El Ceiling Cover(4020)
Approved Approved Approved
By Date )„By Date By Date
QCs Final-Electrical(4055)
Approved
By•t•-a'; Date ---z Z— (
at
El Rough Electrical 0 Final ElectricalEl Right of Way
Approved Approved Approved
By Date By Date By Date