Loading...
14-102902 r p. Electrical City of Federal Way Community&Econ.Dev.Services L E Permit #: 14-102902-00-EL 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax (253)835-2609 p Q Project Name: DECATUR SENIOR HIGH SCHOOL Project Address: 2800 SW 320TH ST Parcel Number: 122103 9034 Project Description: Replace damaged Primary underground cable to 750 kva transformer with UL listed 1/015 kv cable. Owner Applicant Contractor FEDERAL WAY PUBLIC SCHOOLS JASON NELSON POTELCO INC 33330 8TH AVE S FEDERAL WAY PUBLIC SCHOOL POTELI*34404(5/31/15) FEDERAL WAY WA 98003-5433 1211 S 332 ST 14103 8TH ST E FEDERAL WAY WA 98003 SUMNER WA 98390 Additional Permit Information Is this an Online or O.T.C.application? Yes Is Use Educational or Institutional Yes Service greater than 999 Amps? Yes Electrical Fixtures Low Voltage-Other(Commercial 1 PERMIT EXPIRES Monday, December 15, 2014 Permit Issued on Wednesday, June 18, 2014 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington andthe C f Fe al Way. Owner or agent: L Date: FINALED 0 S' THIS CARD IS TO MAIN ON-SITE CITY OF Construction In ection Record Federal Way INSPECTION REQ TS: (253)835-3050 PERMIT#: 14-102902-00-EL Address: 2800 SW 320TH ST Project: FEDERAL WAY PUBLIC SCHOOLS FEDERAL WAY, WA 98023-2207 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. ❑ UFER Ground(4295) ❑ Ditch cover(4030) ❑ Slab/Concrete Floor(4255) Approved Approved Approved to place concrete By Date By Date By Date * , ❑ Pool Bonding(4195) Ei Temporary Power(4275) Service(4235) Approved Approved Approved By Date By Date By Date ❑ Feeders/Sub-panels(4045) El Rough Electrical(4225) ❑ Ceiling Cover(4020) Approved Approved Approved By Date By Date By Date o Final-Electrical(4055) Approved By V"YS Date (0()-0111‘..) E Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date