16-104296 Building - Commercial
City of Federal Way Permit #: 16-104296-00-CO
Community&Econ.Dev.Services - +
7
33325 8th Ave S ;,
Federal Way,WA 98003 „ "'" ,a Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax:(253)835-2609y t3 JEHJ -3
Project Name: VELLESYS,LLC
Project Address: 33516 9TH AVE S Bldg 8 r Parcel Number: 926925 0080
Project Description: TI-Construction of cabinetry and installation of air compressor and hand sink for dental
lab.
Owner Applicant Contractor Lender
VELLESYS LLC ELITE INSTALLERS NW ELITE INSTALLERS NW
PO BOX 2641 10605 SE 240TH ST SUITE 404 ELITEIN873D9(4/8/17)
EAGLE,ID 83616 KENT WA 98031-4903 10605 SE 240TH ST SUITE 404
KENT WA 98031-4903
Census Category: 437-Commercial alt/add/conversion
Includes: #1 #2 #3 #4
Occupancy Class:
Construction Type:
Occupancy Load:
Floor Area(sq.ft.) 0 0 0 0
Additional Permit information
Mechanical to be Included? Yes Plumbing Work Valuation .500
Mechanical Work Valuation? 750 Number of Stories 1
Permit for Building Shell Only? No Plumbing to be Included? Yes
Proposed Structure Valuation 2000 New/Additional Sq.Feet-Total 0
Mechanical Fixtures
Compressors/Heat Pumps 1
Plumbing Fixtures
Lavatories 1
PERMIT EXPIRES Monday, February 27, 2017
Permit Issued on Wednesday, August 31, 2016
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the a will be in ac rdance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: Date:
THIS CARD IS TO REMAIN ON-SITE ' • -
CITY OF le& ' Construction Inspection Record
Federal Way INSPECTION REQUESTS: (253)835-3050
PERMIT#: 16-104296-00-CO Address: 33516 9TH AVE S Bldg 8
Project: VELLESYS LLC FEDERAL WAY, WA 98003-6322
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD, Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
O Initial Erosion Control(4365) -0 Footings/Setback(4110) 0 Re-steel(4215)
To be done prior to breaking ground Approved to place concrete Approved to place concrete or grout
By Date By Date By Date
O Plumbing Groundwork(4190) El Slab/Concrete Floor(4255) 0 Underfloor Framing(4285)
Approved to cover Approved to place concrete Approved to sheath floor
By Date By Date By Date
O Floor Sheathing(4105) 0 Rough Plumbing(4230) 0 Mechanical Rough-in(4165)
Approved to install flooring Approved Approved
By Date By / J Date 9(14, I( ( (, By Date
Gas Piping(4125) 0 Fire/Draft Stops(40951 ) El Interim Erosion Control(4370)
Approved to release test Approved Approved
By Date By Date By Date
Framing(4120) 13 Insulation(4150)
Prior to scheduling a Framing inspection; Approved to insulate Approved to install wallboard
Electrical,Plumbing&Mechanical Rough-in and
Fire/Draft Stop inspections must be signed-off and
approved. IBC 109.3.4 By Date By Date
0 Gypsum Wallboard Nailing(4130)* 0 Suspended Ceiling Grid(4265) 0 Final-SKF&R(4060)
Approved to install mud&tape Approved to drop tile Approved
By Date By Date By Date
.
O Final Erosion Control(4375) ❑ Final-Mechanical(4065) 13 Final-Plumbing(4075)
Approved Approved Approved
By Date By Date By Date
Final-Building(4050)
Approved
By Qilpii,_ Date 1 L`4% —1 Io
O Rough ElectricalEl Final Electrical El Right of Way
Approved Approved Approved
By Date By Date By Date
RECOVED
e CITY OF ERMI'� APPLICATION
Federal Way AUG 31 2016 PERMIT CENTER+33325 8th Avenue South + Federal Way,WA 98003-6325
253-835-2607 + FAX 253-835-2609 +pertnitcenter@cityoffederalway.com
CITY OF FEDERAL WA
f _ ,r
CDS
Mawr NUMBER / /.. / �A I _ -� n l
/ tttYYY !!! l Lep TARGET DATE
SITE ADDRESS SUITE/UNIT#
3 9/4,74
PROJECT VALUATION ZONING ASSESSOR'STAR/PARCEL#
qcc ' -I - oo c
TYPE OF PERMIT 0 BUILDING 0 PLUMBING 0 MECHANICAL 0 DEMOLITION 0 ENGINEERING 0 FIRE PREVENTION
NAME OF PROJECT 9 .'vietN f .rirn pito
Lie/44,644
h 4 vr4�1
' "/
PROJECTDESCRIPTION
Detailed description of work to ..L-VI lt' L e k f`.e ct I 44./ III 07 pt!g" 1/
be included on this permit only
�e jam, yr�+l l 69� e9. I
re# I
'n1t-?`b7L "71fr f ,-y� /r e,dia t /n(0.'4
NAME / PRIMARY PHOT E
PROPERTY OWNER /y✓ ij
MAILING ADD S 7 E-MAIL
CITY STATE ZIP
NAME PHONE
�/ 17 r r14,= /L 763 /3F-Z?-)7
MAILINGDRESS AIL
CONTRACTOR /®40.5 EM� § Da ii (e
CITYf1 T
qz
FA? / -,-7
WA r6.OR'8 LIC DERPIRAT ON DATEFEDERAL, l 715
-
to
NAME `jam•" PRIMARY PHONE
APPLICANT MAILING ADDRESS E-MAIL
CITY STATE ZIP FAX
NAME PRIMARY PHONE
PROJECT CONTACT G{ i oi" 115
(The individual to receive and MAILING ADDRESS E-MAIL
respond to all correspondence
concerning this application) CITY STATE ZIP FAX
PROJECT FINANCING NAME
ig OWNER-FINANCED
When value is$5,000 or more MAI i;G ADDRESS,CITY,/ STATE,ZIP _ /p��.9 �vjP PHONE
(RCW 19.27.095) 56$1 / f/ �4 44 /`kP �L�f
I certify under penalty of perjury that I am the property owner or authorized agent of the property owner.I certify that to the best
of my knowledge, the information submitted in support of this permit application is true and correct.I certify that I will comply with
all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit.I understand that the
issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating
construction or environmental laws.
I further agree to hold harmless the City of Federal Way as to any claim(including costs,expenses,and attorneys'fees incurred in
the investigation and defense of such claim), which may be made by any person,including the undersigned,and filed against the city,
but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the
information supplied to city as a of this application. /'
SIGNATURE: �"7"1"#" DATE ef� / G-'
PRINT NAME: 14
Bulletin#100—January 29,2016 Page 1 of 2 161-1andouts\Permit Application
•
VALUE OF MECHANICAL WORK
' MECHANICAL PERMIT $ i S
Indicate how many of each type of fixture to be installed or relocated as part of this project.Do not include existing fixtures to remain.
AIR HANDLING UNITS FANS GAS PIPE OUTLETS OTHER(Describe)
AIR CONDITIONER FIREPLACE INSERTS HOODS(commercial)
BOILERS FURNACES HOT WATER TANKS(Gas)
COMPRESSORS GAS LOG SETS REFRIGERATION SYST
DUCTING GAS PIPING WOODSTOVES
VALUE OF PLUMBING WORK
PLUMBING PERMIT $ J Ca 0
Indicate how many of each type of fixture to be installed or relocated as part of this project.Do not include existing fixtures to remain.
BATHTUBS(or Tub/shower combo) LAVS(HardSthbs) TOILETS WATER PIPING
DISHWASHERS RAINWATER SYSTEMS URINALS OTHER(Describe)
DRAINS SHOWERS VACUUM BREAKERS
DRINKING FOUNTAINS SINKS(Kitchen/Utility) WATER HEATERS(Electric)
HOSE BIBBS SUMPS WASHING MACHINES TOTAL FIXTURES
GENERAL INFORMATION
CRITICAL AREAS ON PROPERTY? WATER PURVEYOR SEWER PURVEYOR VALUE OF EXISTING IMPROVEMENTS
EXISTING/PREVIOUS USE LOT SIZE(In Square Feet) EXISTING FIRE SPRINKLER SYSTEM? PROPOSED FIRE SUPPRESSION SYSTEM?
Yes No No ❑Yes ❑ No
RESIDENTIAL - NEW OR ADDITION
AREA DESCRIPTION(in square feet) EXISTING PROPOSED TOTAL FOR OFFICE USE
BASEMENT
FIRST FLOOR(or Mobile Home)
SECOND FLOOR
COVERED ENTRY
DECK
GARAGE ❑ CARPORT ❑
OTHER(describe)
Area 101faW EXISTING PROPOSED TOTAL
**NEW HOMES ONLY** ::
ESTIMATED SELLING PRICE$ #OF BEDROOMS
COMMERCIAL-NEW/ADDITION
Area in Construction #of
AREA DESCRIPTION Occupancy Group(s) Additional Information
Square Feet Type Stories
NEW BUILDING
ADDITION
COMMERCIAL-REMODEL/TENANT IMPROVEMENTS
AREA DESCRIPTION Area m Occupancy Group(s) Construction #of Additional Information
Square Feet Type Stories
TOTAL BUILDING
TENANT AREA ONLY
PROJECT AREA ONLY
Bulletin#100—February 22,2016 Page 2 of 2 k:\Handouts\Permit Application
rtoI Way
m
way
IOU_ North Lake
Fishing Access
I�
50� I I
ui
V
W�
Q;•
nn VICINITY
,� ppMAP
140 .'T A.
Addition for
Andriyan & Cristina Balika
402 S 329fh ST.,
Federal Way, WA 98001
PARCEL No.:
08141-n430
�21 .'i SI
V
N
The Lodge at
Peasley Canyon
n -
s n
`� n 'N
0
S 3a13rh 5T -a
ROJEC1` s
SITE : r7�
w 7 ;
> : J'
i
c�7 -
N
S ?3Bfi tir
SHEET INDEX APPROVED
A-1 VICINITY MAP, PLOT PLAN, SHEET INDEX By P4 L
A-2o PROJECT INFO, ABBREVIATIONS, SITE PLAN
A-2b GENERAL NOTES
A-2c NAILING SCHEDULE
A-2d NAILING SCHEDULE CONTINUED
A-2e NAILING SCHEDULE CONTINUED
A-2f NAILING SCHEDULE CONTINUED
A-3 EXISTING MAIN FLOOR * DEMO PLAN
A-4 EXISTING UPPER FLOOR f DEMO PLAN
A-5o FOUNDATION PLAN, ENLARGED FOUNDATION PLAN * FLOOR FRAMING
A-5b FOUNDATION DETAILS
A-6o FLOOR PLAN ENLARGED FLOOR PLAN, RAILING ELEVATION
A-6b SMOKE d C0 DETECTION NOTES
A-7 ROOF PLAN, ATTIC VENTILATION CALC5
A-8 ROOF FRAMING PLAN
A-9 EXTERIOR ELEVATIONS
A-10 BUILDING SECTIONS, QF,TAILS
- -IR'r nETAIL5
WALL PANELS NOTES
0
I cd
Uj
IQ
2015 W 111119.�t Approval Required
Work Shall not he Clone bevond the point indicated in each
yn�•e .•rr ir.ctsection u ttlwui tI LOWWiire [he anwplal el'the _
Vuii_0irig official. •The building official aualk notification %hall
make the re uested Inspections and shall either indicate (lie S. 328TH ST
— . /— • — ' J _ rliCtiu cg7f1 fl�C�il:'a�— -- � — ,—
/ Shull autlry the permit holder or an agent ofthe permit holder
/ r - • s re' s s t cam 1 vith this code. A2 ortions ,�
�t#tat du no corn I shall be carre tcd and such ra ion shall not �1 q' — — —
�-he c. veredlor concealed until aut orixed by The building
official.
�Lr) Z
! O I O I
Im 1
110.0'Ib _-_�-- 100.0 I I I I R7.0
r
I�-
7_5.0'75.0'75.0'75.093.g7'
300.0' NBg' 08' 55'W
I � /
(3 96.33
I - - - - - - - -- --1w PROJECT � � /
SITE TRACT 8 430.0 ,
PA # - - --- M STORM DRAINAGE _0_
+ 102.051
-C,181410430 pia 5' ROAD I�
! I I A'L+� ADD1P OED
N `9t
EAaElr1ENT i,
_I — -- - 237.gl' _12..72' fn
�q'r
` �. -5o:0r- 5C�0-' 50.0'UTILITY ACCESSpp�EAa1=MENT IPSDE `v,_a.78''
rill °OJ ,�� g5.46 .�� t
1-R �
420°� I ? 424'
,
S. 329TH ST 30,4' ' �3 23
�r
N8q' 08' 55"W R=100`
426
426' 51.63' 66.03 0.
co
113.0
Ln
Alert --Ll
Prior to final buildina inspection
Final Erosion and Sedimentation
Control inspection is required
PLOT PLAN
2 gJ'tale t�
RESUBMI QED
APR IN 201?
��y
Ci1-Y 'IF FEI]EI& WAY
CDMMUNI7Ynli �f�h'. •m
O
0
00
o _
zQ
6
o m a�
CO
0
a
<Z�Q�
z
2 Q ¢ r`
0
o �-
Z_ Log
Z H-,
a 0Lf)
N
O
O
�Zo
�(L
a
Z p w
U —i 2
>atn
WE: 18 Apr 2017
JOB NO, 17-01
SCALE' NOTED
SHEET NUMBER
A-0