Loading...
17-103665 Electrical City of Federal Way Permit 14:17-103665-00-EL Community Development Dept. - 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 Project Name: MOON Project Address: 29010 8TH AVE S Parcel Number:515292 0260 Project Description: 1 circuit for A/C install Owner Applicant Contractor MICHAEL MOON VANESSA STEPHENSONWASHINGTON WASHINGTON ENERGY SERVICES CO 29010 8TH AVE S ENERGY SERVICES CO (ELECTRICAL 01) FEDERAL WAY WA 98003 3909 196TH ST SW WASHIES854NG(9/7/17) LYNNWOOD WA 98036 3909 196TH ST SW LYNNWOOD WA 98036 • Additional Permit Information Is this an Online or O.T.C.application? Yes o Circuits-Residential 1 PERMIT EXPIRES Thursday,2 August,2018 Permit Issued on Wednesday,August 2,2017 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the Ci of Federal Way. Owner or agent: Date: r j THIS CARD IS TO REMAIN ON-SITE CITY Of Construction Inspection Record Federal Way INSPECTION REQUESTS:(253)835-3050 PERMIT#: 17 103665 00 Address: 29010 8TH AVE S Project: CHIAWEN MOON FEDERAL WAY WA 98003-3702 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. El UFER Ground(4295) ® Ditch cover(4030) El Slab/Concrete Floor(4255) Approved Approved Approved to place concrete By Date By Date '�By Date • ® Pool Bonding(4195) 0 Temporary Power(4275) ® Service(4235) Approved Approved Approved By Date By Date By Date ,® Feeders/Sub-panels(4045) `• Rough Electrical(4225) •' CeilingCover 4020 ' P ° ❑ g ❑ ( ) Approved Approved Approved By Date By Date ��By Date 11 Final-Electrical(4055) Approved By tj. Date Cat I 11 ❑ Rough Electrical ❑ Final Electrical ❑ Right of Way Approved Approved Approved *By Date By Date , By Date .