Loading...
17-102773 FIE E ectrical CityCommunityofFederalWayDevelopmentDept. Permit #:17-102773-00-EL 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax(253)835-2609 Project Name: BALKO Project Address: 1814 SW 347TH PL Parcel Number:742800 0310 Project Description: Rewire: Kitchen,Living/Entry,Bedrooms,Basement,Attic.Circuits:(2)washer& dryer,(6) 15amp General lighting,and(1)20amp freezer. Owner Applicant Contractor BART BALKO LORISSA PHILLIPSSEATOWN ELECTRIC SEATOWN ELECTRIC CORP 1814 SW 347TH PL CORP SEATOEC86ORB(12/2/18) FEDERAL WAY WA 98023 7304 10TH ST SE UNIT C101 PO BOX 75538 LAKE STEVENS WA 98258 SEATTLE WA 98125 Additional Permit Information Is this an Online or O.T.C.application9 Yes Circuits-Residential 2 Circuits-Residential 7 PERMIT EXPIRES Saturday,9 June,2018 Permit Issued on Friday,June 9,2017 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: ONL. INJE Date: milullijit THIS CARD IS TO REMAIN ON-SITE CITY OF 'Construction Inspection Record Federal Way INSPECTION REQUESTS:(253)835-3050 PERMIT#: 17 102773 00 Address: 1814 SW 347TH PL Project: ERICA C BALKO FEDERAL WAY WA 98023-7005 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. ® UFER Ground(4295) 0 Ditch cover(4030) 0 Slab/Concrete Floor(4255) Approved Approved Approved to place concrete By Date A By Date By Date • •. .4, . 0 Pool Bonding(4195) 0 Temporary Power(4275) El Service(4235) Approved Approved Approved •By Date By Date By Date 7❑ Feeders/Sub-panels(4045) 1 0 Rough Electrical(4225) 0 Ceiling Cover(4020) Approved Approved Approved By Date By Date By Date , El Final-Electrical(4055) Approved By< Dat ..... 7 0 Rough Electrical E Final Electrical El Right of Way Approved Approved Approved By Date By Date By Date