Loading...
17-103690 Electrical City Fede t FILE Permit #:17-103690-00-EL Communi Develo Dep 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 Project Name: NEVILLE Project Address: 1003 S 299TH PL Parcel Number:515160 0020 Project Description: WIRE 2.5 TON A/C Owner Applicant Contractor LARRY NEVILLE RACHEL MASONMERIDIAN CENTER MERIDIAN CENTER ELECTRIC INC(01) 1003 S 299TH PL ELECTRIC INC MERIDCE318SG(2/28/19) FEDERAL WAY WA 98003 11109 66TH AVE E 11109 66TH AVE E USA PUYALLUP WA 98373 PUYALLUP WA 98373 Additional Permit Information Is this an Online or O.T.C.application9 Yes N; Circuits-Residential 1 PERMIT EXPIRES Friday,3 August,2018 Permit Issued on Thursday,August 3,2017 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: ONLINE Date: F Pkirr ,. - THIS CARD IS TO REMAIN ON-SITE CITY Of Construction Inspection Record Federal Way INSPECTION REQUESTS:(253)835-3050 PERMIT#: 17 103690 00 Address: 1003 S 299TH PL Project: ANN PENBERT FEDERAL WAY WA 98003-3776 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. III UFER Ground(4295) 2❑ Ditch cover(4030) El Slab/Concrete Floor(4255) Approved Approved Approved to place concrete By Date By Date By Date • ® Pool Bonding(4195) I:I Temporary Power(4275) ® Service(4235) Approved Approved Approved By Date By Date By Date •E Feeders/Sub-panels(4045) ® Rough Electrical(4225) ® Ceiling Cover(4020) Approved Approved Approved By Date By Date • By Date El Final-Electrical(4055) Approved By V104 Date $l l I t 1 0 Rough Electrical 0 Final Electrical 0 Right of Way Approved Approved Approved By Date By Date By Date