Loading...
17-101939 } la f Electrical City ot'Federal Way Permit #:17-101939-00-EL Community Development Dept. 33325 8th Ave SFILE Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 Project Name: BENNETT Project Address: 37610 17TH PL S Parcel Number:721265 0750 Project Description: Electrical for Furnace&Heat Pump Owner Applicant Contractor PHILLIP J BENNETT CYNDAL MILLHOLLINNORTHWEST PACIFIC AIR SYSTEMS(ELECTRICAL 37610 17TH PL S PERMIT/WESCO 02) FEDERAL WAY WA 98003-7572 1345 W GULF RD PACIFAS853LB(6/2/17) POINT ROBERTS WA 98281 I2811 PACIFIC HWY S LAKEWOOD WA 98023 R Additional Permit Information Is this an Online or O.T.C.application Yes { r moi. �✓.,,� 5,%h�` 1,� ,. Circuits-Residential 2 PERMIT EXPIRES Saturday,28 April,2018 Permit Issued on Friday,April 28,2017 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws,rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: 01\,11.1 E Date: Pitt/ �4D t THIS CARD IS TO REMAIN ON-SITE °� Construction Inspection Record Federal Way INSPECTION REQUESTS:(253)835-3050 PERMIT#: 17 101939 00 Address: 3761017TH PL S Project: PHILLIP J BENNETT FEDERAL WAY WA 98003-7572 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. , ,• „ , 0 UFER Ground(4295) ; � Ditch cover(4030) 12 Slab/Concrete Floor(4255) Approved Approved Approved to place concrete By Date By Date By Date ® Pool Bonding(4195) ® Temporary Power(4275) ® Service(4235) Approved Approved Approved By Date By Date By Date P Sp ® Feeders/Sub-panels(4045) 0 Rough Electrical(4225) ® Ceiling Cover(4020) Approved Approved Approved By Date By Date By Date 10 Final-Electrical(4055) Approved ifirr`:j9 Date `4 —(� 0 Rough Electrical 0 Final Electrical Right of Way Approved Approved Approved By Date By Date By Date