16-105906z
r L
City of Federal Way
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: GRAVITY COFFEE
Project Address: 33510 PACIFIC HWY S
t
Building CommereWl
Permit #:16 -105906 -00 -CO
Inspection Request Line: (253) 835-3050
Parcel Number: 797820 0050
Project Description: NEW - Construction of a new 500 square foot coffee kiosk building with associated site work.
Mechanical and plumbing by separate permit.
Owner
Applicant
Contractor
Lender
JEFF PARKERCADENCE CAPITAL
TRAVIS CHESHIREPACLAND
INCA CONSTRUCTION
OWNER IS LENDER
INVESTMENTS
1505 WESTLAKE AVE N SUITE 30`
835 S ROCHESTER ST
3580 KLAHANIE DR SE SUITE 402
SEATLLE WA 98109
TACOMA WA 98465
ISSAQUAH WA 98029
Census Category: 327 - New Store and Customer Service Building
Includes:
#1 #2 #3 #4
Occupancy Class:
B
Construction T
Type V- B
Occupancy Load:
5.00
Floor Area (sq. ft.) 1
480.00
Additional Permit Information
New / Additional Sq. Feet - 1st Floor ..................... 480 New / Additional Sq. Feet - 2nd Floor.................... 0
New / Additional Sq. Feet - 3rd Floor ..................... 0 Occupancy #1- Area (Sq. Feet).............................. 480
New / Additional Sq. Feet - Basement .................... 0 Occupancy #I - Construction Type ......................... Type V - B
New / Additional Sq. Feet - Deck ........................... 0 New / Additional Sq. Feet - Garage........................ 0
Mechanical to be Included? ..................................... No Plumbing Work Valuation?..................................... 0
Mechanical Work Valuation? .................................. 0 Number of Stories................................................... I
New / Additional Sq. Feet - Other ........................... 0 Is this an Online or O.T.C. application?.................. No
Permit for Building Shell Only? .............................. No Plumbing to be Included? ........................................ No
New / Additional Sq. Feet - Total ........................... 480 Will Certtii/ficate of Occupancy be Issued?............... Yes
Occupancy #1 -Use ................................................ Restaurant CPlan Designation........................... Community Business
Zoning Designation ................................................. BC
it
Total Valuation: 59,505.601�
` c i Plc• KC�e _SeP1.
7-A*((7
PERMIT EXPIRES Wednesday, 11 October, 2017
Permit Issued on Friday, April 14, 2017
I hereby certify th mation is correct and that the construction on the above described property
and the oc pan d the se be in accordance with the laws, rules and regulations of the State of
Was ington and the City of Federal Way.
Owner or agen Date: / L
City of Federal Way
Certificate of Occupancy
.,mill
t ,
This Certificate issued pursuant to the requirements of Section 111 of the International Building Code or Section
11110 of the International Residential Code is certifying that at the time of issuance, this structure was in
compliance with the various ordinances of the City regulating building construction or use. This certificate is valid
ONLY when endorsed by City staff.
Tenant Name: GRAVITY COFFEE Permit # 16 -105906 -00 -CO
Address: 33510 PACIFIC HWY S
Includes: #1 #2 #3 #4
Occupancy Class: B
Construction Type: Type V - B
Occupancy Load: 5.00
Floor Area (sq. ft.) 480.00
Owner Name: JEFF PARKERCADENCE CAPITAL D
Owner Address: 4580 KLAHANIE DR SE SUITE 402
ISSAQUAH WA 98029
r
Building Official Date
The priority focus in the review and inspection made by the City prior to issuance of this Certificate was on those matters which
experience has shown most severely affect the health and safety of the general public. Although the City has made as complete
a review and inspection as is reasonably possible (within budgetary time and personnel limitations), the City neither guarantees
nor warrants to the owner/occupant or to any other person that this Certificate evidences strict compliance with each and every
ordinance or regulation of the City or the State of Washington affecting the construction or use of said structure or the land upon
which it is situated. Such compliance is the responsibility of the owner and / or occupant of the premises.
1
Cf'V OF
Federal Way
PERMIT #: 16105906 00
THIS CARD IS TO REMAIN ON-SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
Address: 33510 PACIFIC HWY S
Project: JEFF PARKER FEDERAL WAY WA 98003-6890
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
® Footings/Setback (4110)
0 Foundation Wall (4115)
Drainage/Downspout (4040)
Approved to place concrete
Approved to place concrete
Approved to backfill
By Date 7)
By Date `r
By Date 5l LI
®
Re -steel (4215)
®
Slab/Concrete Floor (4255)
®
Underfloor Framing (4285)
By Date
Approved to place concrete or grout
By $� Date S
Approved to place concrete
Approved to sheath floor
By
Date
By
Date
By
Date
® Floor Sheathing (4105)
® Shear Walls (4245) Pe
® Roof Sheathing (4220)
Approved to install flooring
Approved to install siding
Approved to install roofing
By Date
ByDate
By $� Date S
10 Fire/Draft Stops (4095) Priorto scheduling a Framing inspection;91 Framing (4120)
Approved Electrical, Plumbing & Mechanical Rough -in
and Fire/Draft Stop inspections must be signed- Approved to insulate
oand a
By Date f;G : � off approved. IBC 109.3.4 By Date
92
Insulation (4150)
13
Gypsum Wallboard Nailing (4130)
14
Suspended Ceiling Grid (4265)
El
Approved to install wallboard
Approved to install mud & tape
Approved to drop tile
By
0 Date lot • q — % n
By
Date 6 La
By
Date
15
Final - S K F & R (4060)
76
Final - Planning
®
Final - Public Works (4080)
El
Approved
Approved
Approved
By
Date
By
Date
By
Date
1ti Final - Building (4050)
Approved
By h* Date kPIZ4111
❑
Rough Electrical
Final Electrical
El
Right of Way
Approved
Approved
Approved
By
Date
By
Date
By
Date
V
RECEIVED
D E 4 2,'] 163
Clay CW PERMIT APPLICATION
CITY OF rFE11ER,6,1"'WAYPz1=T CENTER + 33325 81, Avenue South + Federal Way, WA 98003-6325
Federal Way C D 11 � 253-835-2607 + FAX 253-835-2609 +&ralv— mm
"4: Uil 121
�ADDRZU waltzluffr #
33370 PACIFIC HIGHWAYS
ASSEWOR'S TAX/P"CZL #
P`R(>JZCT V"VATION
$ $125,000
TYPE OF PERMIT 410"B*VILDING 13 PLUMBINO 11 MECHANICAL 11 DEMOLITION RANGINEEPING 0 RRE PREVENTION
NAAM OF PROJECT Gravity Coffee
grgv - R". — - - --- - - ------------- - — - - --------
PROJECT DESCRIPTION
Detatled descnptwn of work to AC lot north of the Advance Auto Parts retail store, Parking, drive aisles, landscaping, and
. . ........ ..... - - I
be included on this permit only I supporting utilities will be constructed/installed as part of the AAP project,
- ------ ----
NAM "maRy PHORZ
BTS PAC HWY FW AA LLC C/O Jeff Parker (425) 270-9782
WAZUM ADORM"
4580 Klahanie Drive SE #402
FX fflno�,�
FXAX9 PFOLUM PWNX
L -Cadence Capital Investments C/O Jeff Parker
270-9782
] Y-IdAa II
80 Klahanie Drive SE #402 jparkeracadencecap.com
crrit STAM I UP
Issaquah LWA J 98029
PRIMA" PROXIc
PROJECT CONTACT 7ACLAND Seattle PC C/O Travis Cheshire .��6 U2-9510
rrhe indiuidual to reoeive and ADDRS88
MUM
respond to all correspondence 1505 Westlake Ave N Suite 305 tcheshire@pacland,com
I eonoerrung this applicahon) zlP
__..,1
98109
PROJECT MANCING
Whell Ihl-- is $5,000
(RCW 19,27.095;
I oert(& under penalty ofperjury that I am the prop" owner or auLh*rtx*d agent *f the property owner. I corto that to the best
of my knowledge, the Wormation submitted in support Of this Permit 4"Itcation is true and correct I cert(& that I will comply with
all applicable CUM of Pederul Way regulations pertaining to the work authorized hy the issuance of a peradt. I understand that the
issuance of this permit does not remove the owimes responsibility J4r compliance With focal, state, or federal laws regulating
construction or environmental taws.
IjUrther agree to hold harmiess the City ofJ*deral Wag "s to &my claim (including costs� expenses� and attorneyalfiess incurred in
the investigation and defensw of such ohidn* which may be made AW any pers0n, including the underOgned, andflZed against the city,
but only where such claim arts" out qf the reliance of the city, including its offloors and employees� upon the accuracy of the
Wormation supplied to the city as a
partAtt this application.
SIGNATURE:-YiiYr..DATE
PPINT NAME:
4
V ,e
VALUE OF MECHANICAL WORK
MECHANICAL PEP-Ntyr DEFERRED SUBMITTAL $
Indicate how many of each type qf[Lxture to be =tatted or relomted as o ties ro' > i. I3o not inchede exist' to remain.
AIR HANDLING UNITS FANS GAS PIPE OUTLETS OTHER fI)escribe)
AIR CONDITIONER FIREPLACE INSERTS HOODS
BOILERS FURNACES HOT WATER TANKS ,G-
COMPRESSORS GAS LOG SETS REFRIGERATION SY3T
DUCTING 04NS PIPING WOODSTOVFS
GENERAL INFORMATION
CRITIC" AXZ" ON PROPZWM WAM PVRVZYO]t axwm PvTr#mR_ VAUM Or CUOMO UIPROMMM
,U= m",
N/A Lakehaven Lakehaven
NW,
Bulletin #100 — Januat�v 29, 2016 Page 2 oft kftflandoutsTermit Application
VALUE 0T,'PLUM8flYG WORK
PLUMBING PERMIT
DEFERRED SUBMITTAL
1
$
Indicate how mace a each e o
tore to be installed or relocatett as
art o this 2roject Do not include existtures to remain,
BATHTUBS rye %blah— comb"
LAVS, {H__i s.:..j
TOILETS
WATER PIPING
DISHWASHERS
RAINWATER SYSTEMS
URINALS
— OTHER (Describe]
DRAINS
SHOWERS
VACUUM BREAKERS
DRINKING FOUNTAINS
SINKS
WATER HEATERS lie '.rel
HOSE BIBBS
SUMPS
WASHING MACHINES
— TOTAL FDETURZS
GENERAL INFORMATION
CRITIC" AXZ" ON PROPZWM WAM PVRVZYO]t axwm PvTr#mR_ VAUM Or CUOMO UIPROMMM
,U= m",
N/A Lakehaven Lakehaven
NW,
Bulletin #100 — Januat�v 29, 2016 Page 2 oft kftflandoutsTermit Application