Loading...
16-100754 Building - Commercial City of FeWay Permit #: 16-100754-00-CO Community&Econ.Dev.Services 33325 8th Ave S Federal Way,WA 98003 Ph:(253)835-2607 Fax:(253)835-2609 Inspection Request Line: (253) 835-3050 Project Name: WILD WAVES ACTIVITY POOL Project Address: 36201 ENCHANTED PKWY S Parcel Number: 282104 9026 Project Description: Wood framed building to house existing filtration system& equipment. **Mechanical only.No plumbing.** Owner Applicant Contractor Lender CNL INCOME ENCHANTED TODD SUCHAN ALLEN BRADBURY CONST LLC OWNER IS LENDER VILLAGE LLC 36201 ENCHANTED PKWY S ALLENC*857MS(7/10/17) 36201 ENCHANTED PKWY S FEDERAL WAY WA 98003 901 ALGONA BLVD N SUITE A FEDERAL WAY WA 98003 ALGONA WA 98001 Census Category: 437 - Commercial alt/ add/conversion Includes: #1 #2 #3 #4 Occupancy Class: Construction Type: Occupancy Load: Floor Area(sq. ft.) 0 0 0 0 Additional Permit Information Mechanical to be Included9 Yes Plumbing Work Valuation9 0 Mechanical Work Valuation? 18200 Number of Stories. 1 Permit for Building Shell Only? No Plumbing to be Included? No Proposed Structure Valuation 95000 New/Additional Sq.Feet-Total 0 Mechanical Fixtures Fans I PERMIT EXPIRES Saturday, August 20, 2016 Permit Issued on Monday, February 22, 2016 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: �� l(6 ?tot/16 Tin,,,A.Ifet,...tal b( 9,411 DA`4 1 INSPECTOR AREA AND TYPE OF INSPECTION '`" 3Nlle 6v3 __111/2 1n-TAK -ct oofi- te,44-ei fisrK ConnCG-'4or• GK bvc -to b(oci. 7 C.oUtr Gtie&!5 1 THIS CARD IS TO REMAIN ON-SITE � c, °F ~` " Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT#: 16-100754-00-CO Address: 36201 ENCHANTED PKWY S Project: CNL INCOME ENCHANTED VILLA( FEDERAL WAY, WA 98003 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS£_A.RD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must nut be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. LBy0' Initial Erosion Control(4365) '0Footings/Setback(4110) ®By Foundation Wall(4115) To be done prior to breaking ground Approved to place concrete Approved to place concrete Date By Date Date ® Drainage/Downspout(4040) Re-steel(4215) >t ® Slab/Concrete Floor(4255) Approved to backfill Approved to place concrete or grout Approved to place concrete By LDate By Date By Date rAppr0 Underfloor Framing(4285) ❑ Floor Sheathing(4105) 0 Shear Walls(4245) Approved to sheath floor oved to install flooring Approved to install siding By Date By Date By Date r " Roof Sheathing(4220) 0 Mechanical Rough-in (4165) Gas Piping(4125) 1— ' Approved to install roofing Approved Approved to release test LB.yW_-..4/47J Date 3 ) t) I l By Date By Date —Fire/DraftFri Stops(4095) 0 Interim Erosion Control(4370) 6 Prior to scheduling a Fr a.n;ng inspection: "A Approved Approved Electrical,Plumbing&Mechanical Rough-in and I FirelDraft Stop inspections must be signed-off and By Date By Date approved. IBC 109.3.4 s 1�. -.._...--.-... Framing(4120) .w._ Ef Insulation (4150) Gypsum Wallboard Nailing (4130) v r roti c d to insulate A-'v Date 5///1 l6 By Approved to install wallboard V Approved to install mud&tape L— B Date By Date __. ______I D Suspended Ceiling Grid (4265) ❑ Final-S K F&R(4060) 0 ' Final-Planning Approved to drop tile Approved Approved By Date By `r- Date By w Date n final-Public Works(4080) 0 Final Erosion Control(4375) ❑ Final-Mechanical(4065) Approved Approved Approved By Date By Date By Vii Date to(21 Val(6 Final-Building(4050) Approved 1.12.L.. ..�5 Date b (b Rough Electrical El Final Electrical:I. El Right of Way Approved Approved Approved By Date By Date By Date • Kennedy/Jenks Consultants Engineers&Scientists ' 32001 32nd Avenue South, Suite 100 Federal Way, Washington 98001 253-835-6400 FAX: 253-952-3435 2 June 2016 Rob Vreugdenhil Owner I Manager Allen-Bradbury Construction 901 Algona Blvd. North, Suite "A" Algona, WA 98001 Subject: RE: Final Close out letter for Wild Waves Theme Park Filter Buildings Permit#: 16-100753-00 (Wave Pool Building) Permit#: 16-100754-00 (Activity Pool Filter Building) Dear Rob, • The following addresses the questions posed by the City of Federal Way's building inspector, received 20 April 2016. 1. With regard to the request to shim or shave studs as described in your email, no exception taken to proposed revision so long as minimum embedment into the stud is provided for all screws per the hold down manufacturer's data. If minimum is not achieved, contractor shall stitch the filler strip to the stud with additional screws. 2. No exceptions taken to proposed revisions to detail 8 on sheet S10. 3. With regard to framing clips shown on S10, no exceptions taken to providing an A35F joining the members shown joined previously by the A35. 4. With regard to the alignment of studs and roof joints, Studs do not need to align with roof joists, or be doubled; the top plate will spread the joist load to the studs. Very truly yours, F .4'.'1 KENNEDY/JENKS CONSULTANTS "-,,z,,„ ' Ar� z ' ' / Peter Symonds a ��f:' Engineer .�;�,, � 4,:1 444s; �,� "'3r `' N 4'AL µ • - er;,-, cAosersbetersymomisidesktoMgdeetre;:Jac 2. „,. RECEIVED • FEB 10 2016 PERM.' APPLICATION Federal Way CITY OF FEDERAL WAY CDS PERMIT NUMBER ( Ls _ ' b 0 7 V - _ C 0 _ _ TARGET DATE 1 SITE ADDRESS SUITE/UNIT# 3( 2 01 N C-1AN TEp PAO•Kw 'i 5 . F C059.p\t WAY g 0003 PROJECT VALUATION ZONING ASSESSOR'S TAX/PARCEL S $ 95, 000 2_ 55 ? 1 0 1 - q 2-- TYPE OF PERMIT 1/� /,K BUILDINGT ❑ PLUMBING ❑ MECHANICAL 0 DEMOLITION 0 ENGINEERING 0 FIRE PREVENTION V NAME OF PROJECT Ali 'L ) ^ r,/Pl JF .Ac- I v 1 I^\l POOL- A LT E R ( -D G7 PROJECT DESCRIPTION w0 o CJ F RA'n,.A> Bu l 1.D t'J G TO 1-}E-(/1Sz_ E)615`t 1 k,U Detailed description of work to Flt,Tekrloki S YSTe en 4 eq.v.19revE.iv-r be included on this permit only NAME PRIMARY PHONE Gu1., INCOME EI-1 C44,AINIVFX.J,u e-XE. , I.LG 253.221-319(, PROPERTY OWNER MAILING ADDRESS E-MAIL 36201 Etvilkp%NTEP PACZK-wAy 5• tsuchanewild waves.co n CITY STATE ZIP 3 -� Fc.--.0 vs�ay WA 95003 NAME PHONE . AEN 8wkoeu(24 CgJST( LTIoc•I 253-2,8 - 22$$ MAILING ADDRESS E-MAIL robveallien CONTRACTOR 90 AI.GoNA B1.v0 N, SU, ITE PF bt`adbu.rj co(ssztCuc,i;aCV.cowl CITY STATE ZIP FAX 0 ( , ALCpoNA W4 9$0 WA 253-?Pe.7292 03 WA STATE CONTRACTOR'S LICENSES EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE# AU...S Nc ie$5'1 MS Z / I�.� / i 1 NAME ��, I 1 4 PRIMARY PHONE 0 ADDRESS - E-MAIL APPLICANT aI) ( E/`I /i ` Pixt 1-4-Y S 1Vl""0 to i I t{") STATE ZIP PFAX AME _ PRIMARY PHONE PROJECT CONTACT ` 2-53 --1-1-1-`611 b (The individual to receive and MARINO ADDRESS E-MAIL respond to all correspondence 3 Co--o( i NC J�I,G' ptki,4 A y c c ew i L�lui. , . concerning this application) CI ce„ STATE ZIP FAX AC-1 i 14,.,11 4- 'i Pt PROJECT FINANCING NAME C.1JL, I N1t"0M % OWNER-FINANCED When value is$5,000 or more MAILING ADDRESS,CITY,STATE,ZIP PHONE (RCW 19.27.095) I certify under penalty of perjury that I am the property owner or authorized agent of the property owner.I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct.I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim(including costs, expenses, and attorneys'fees incurred in the investigation and defense of such claim), which may be made by any person, including the undersigned, and filed against the city, but only where such claim arises out of the r fiance of the city, including its officers and employees, upon the accuracy of the information supplied to the as a part of •pli ion. lit i SIGNATURE: DATE 219/Z0I6, PRINT NAME:_ i 0 D:70 .' J��..j A Bulletin#100—December 29,2015 Page 1 of 3 k:\Handouts\Permit Application f • 0 VALUE OF MECHANICAL WORK MECHANICAL PERMIT $ I%Zoo Indicate how many of each type of fixture to be installed or relocated as part of this project.Do not include existing fixtures to remain. AIR HANDLING UNITS I FANS GAS PIPE OUTLETS OTHER(Describe) AIR CONDITIONER FIREPLACE INSERTS HOODS(Commercial) BOILERS FURNACES HOT WATER TANKS(Gas) COMPRESSORS GAS LOG SETS REFRIGERATION SYST DUCTING GAS PIPING WOODSTOVES � VALUE OF PLUMBING WORK PLUMBING PERMIT A $ Indicate how many of each type offixture to be installed or relocated as part of this project.Do not include existing fixtures to remain. BATHTUBS(or Tub/shower combo) LAVS(Hand sinks) TOILETS WATER PIPING DISHWASHERS RAINWATER SYSTEMS URINALS OTHER(Describe) DRAINS SHOWERS VACUUM BREAKERS DRINKING FOUNTAINS SINKS(kitchen/Utility) WATER HEATERS(Electric) HOSE BIBBS SUMPS WASHING MACHINES TOTAL FIXTURES GENERAL INFORMATION CRITICAL AREAS ON PROPERTY? WATER PURVEYOR SEWER PURVEYOR VALUE OF EXISTING IMPROVEMENTS $ EXISTING/PREVIOUS USE LOT SIZE(In Square Feet) EXISTING FIRE SPRINKLER SYSTEM? PROPOSED FIRE SUPPRESSION SYSTEM? ❑ Yes X No ❑ Yes l No RESIDENTIAL - NEW OR ADDITION AREA DESCRIPTION(in square feet) EXISTING PROPOSED TOTAL FOR OFFICE USE BASEMENT FIRST FLOOR(or Mobile Home) SECOND FLOOR COVERED ENTRY DECK GARAGE ❑ CARPORT ❑ OTHER(describe) EXISTING PROPOSED TOTAL Area Totals **NEW HOMES ONLY** ESTIMATED SELLING PRICE$ # OF BEDROOMS COMMERCIAL-NEW/ADDITION AREA DESCRIPTION Area in Occupancy Group(s) Construction # of Additional Information Square Feet Type Stories NEW BUILDING ADDITION COMMERCIAL-REMODEL/TENANT IMPROVEMENTS AREA DESCRIPTION Area in Construction # of Occupancy Group(s) Additional Information Square Feet Type Stories TOTAL BUILDING 4" I TENANT AREA ONLY PROJECT AREA ONLY Bulletin#100—December 29,2015 Page 2 of 3 k:\Handouts\Permit Application