Loading...
16-104590 Electrical City of FederalWay Community&Econ. Dev.Services FILE Permit #: 16-104590-00-EL 33325 8thth Ave S Federal Way,WA 98003 I Ph:(253)835-2607 Fax:(253)835-2609 Inspection Request Line: (253)835-3050 03N2DYN Parcel Number: 215465 0010 Project Description: Relocate 2 zone sensors Owner Applicant Contractor STERLING REALTY ORG DARLA DOLL MACDONALD MILLER FAC SOL INC 600 106TH AVE NE SUITE 200 MACDONALD MILLER FAC SOL INC (ELECTRICAL) BELLEVUE WA 98004 (ELECTRICAL) MACDOMF972BF(1/6/17) 7717 DETROIT AVE SW 7717 DETROIT AVE SW SEATTLE WA 98198 SEATTLE WA 98106 Additional Permit Information Electrical Work Valuation? 800 Is this an Online or O.T.C.application? Yes Is Use Educational or Institutional? No Service greater than 999 Amps? No Electrical Fixtures Low Voltage-Other(Commercial 1 Thermostat. 2 PERMIT EXPIRES Thursday, September 14, 2017 Permit Issued on Wednesday, September 14, 2016 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Fe Way. Owner or agent: ONL1N Date: FINAL Eta , .A. , TIS CARD IS TO REMAIN ON-SITE CITY OF Construction Inspection Record ' - .. Federal Way INSPECTION REQUESTS: (253)835-3050 PERMIT#: 16-104590-00-EL Address: 32001 32ND AVE S Unit 310 Project: STERLING REALTY ORG FEDERAL WAY, WA 98001 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom).Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. ❑ LIFER Ground (4295) 0 Ditch cover(4030) ❑ Slab/Concrete Floor(4255) Approved Approved Approved to place concrete By Date By Date By Date El Pool Bonding(4195) 0 Temporary Power(4275) 0 Service(4235) Approved Approved Approved By Date By Date By Date 0 Feeders/Sub-panels(4045) 0 Rough Electrical(4225) ElCeiling Cover(4020) Approved Approved Approved By Date By Date By Date . •❑ Final-Electrical(4055) Approved E Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date .