17-104204 •
•
• Mechanical
City of Federal way Permit #:17-104204-00-ME
Community Development Dept.
33325 8th Ave S
Federal Way,WA 98003 Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax:(253)835-2609 FILE
Project Name: PEASE
Project Address: 2800 S 299TH PL Parcel Number:660250 0050
Project Description: Install gas furnace
Owner Applicant Contractor
LEONA PEASE SUSAN DUNHAMBLACK HILLS INC BLACK HILLS INC(GENERAL)
2800 S 299TH PL 1003 85TH AVE SE UNIT A BLACKHI066JL(7/19/19)
FEDERAL WAY WA OLYMPIA WA 98501
98003-4266 1003 85TH AVE SE UNIT A
OLYMPIA WA 98501-5706
Additional Permit Information
Mechanical Work Valuation? 5175 Is this an Online or O.T.C.applications Yes
Furnaces 1
PERMIT EXPIRES Tuesday,27 February,2018
Permit Issued on Thursday,August 31,2017
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: 1...I I1J E Date:
.. .
THIS CARD IS TO REMAIN ON-SITE `
�m� Construction Inspection Record
Federal Way INSPECTION REQUESTS:(253)835-3050
PERMIT#: 17 104204 00 Address: 2800 S 299TH PL
Project: LEONA F PEASE FEDERAL WAY WA 98003-4266
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
•
0 Mechanical Rough-in(4165) ® Gas Piping(4125) ® Final-Mechanical(4065)
Approved Approved to release test Approved
By Date ‘By Date By lW3 Date 4312-9, 1'1
•
E Rough Electrical n Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date