Loading...
17-102371 Mechanical City of Federal Community Development . FIL Permit #:17-102371-00-ME 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 Project Project AddName: CRUZress: 1228 SW 330TH PI, Parcel Number:926495 0010 Project Description: Add new gas line from meter to emergency standby generator Owner Applicant Contractor FRANCISCO CRUZ DALE BAXMANN D B PLUMBING 1228 SW 330TH PL 26908 164TH AVE SE DBPLUP*924JJ(4/11/18) FEDERAL WAY WA COVINGTON WA 98042 98023 26908 164TH AVE SE COVINGTON WA 98042 Additional Permit Information Mechanical Work Valuation' 500 Is this an Online or O.T.C.application? Yes Gas Piping 1 PERMIT EXPIRES Wednesday, 15 November,2017 Permit Issued on Friday,May 19,2017 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: x THIS CARD IS TO REMAIN ON-SITE s CITY Federal Way Construction Inspection Record INSPECTION REQUESTS:(253)835-3050 PERMIT#: 17 102371 00 Address: 1228 SW 330TH PL Project: PIA CRUZ FEDERAL WAY WA 98023-5326 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. El Mechanical Rough-in(4165) ® Gas Piping(4125) ElFinal-Mechanical(4065) Approved Approved to release test Approved By Date A By 0 � Date "s.0.41_11 „By a.�--� Date Ct—t St-% 1 • 0 Rough Electrical 0 Final Electrical 0 Right of Way Approved Approved Approved By Date By Date By Date