Loading...
17-101427 1 r a Building - Multi Family City of Federal Way Permit #:17-101427-00-MF Community Development Dept. 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 Project Name: MADERA WEST CONDOS, BLDG B Project Address: 31500 33RD PL SW Parcel Number:500790 0000 Project Description: REP-Repairs to existing condominium building,including replacement of cladding,windows, doors,and SGD's;repairs to decks and elevated entry walkways,including new rails.No plumbing or mechanical. • Owner Applicant Contractor Lender JENNIFER HANSENGFK JORDAN BLAKESOLTNER C D K CONSTRUCTION MANAGEMENT INC GROUP ARCHITECTS SERVICES INC 100 W HARRISON ST SUITE N-53( 1333 N NORTHLAKE WAY SUITE t PO BOX 1767 SEATTLE WA 98119 SEATTLE WA 98103 DUVALL WA 98019-1767 USA USA Census Category: 434-Residential alt/add- no change in number of units Includes: #1 #2 #3 #4 Occupancy Class: Construction Type: Occupancy Load: Floor Area(sq.ft.) Additional Permit Information Mechanical to be Included? No Number of Stories 2 Is this an Online or O.T.C.application? No Permit for Building Shell Only? No Plumbing to be Included? No Comprehensive Plan Designation SF-High-Density Residential Zoning Designation RS 7.2 Total Valuation:204,500.00 EEE •,.^�,l�lrE »:sr�,�• y` ° tr �, PERMIT EXPIRES Saturday,28 October,2017 Permit Issued on Monday,May 1,2017 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: FILE L Date: D.- TE INSPECTOR ARE AND TYPE: Or INSPECTION 7 (tc(ti, wv& slncst„ - t4in41 } Sou.A-4 Ohn a ks4-. 1 I 1.-i`c/ wrs _ vi . THIS CARD IS TO REMAIN ON-SITE, `m OF Construction Inspection Record + Federal Way INSPECTION REQUESTS:(253)835-3050 PERMIT#: 17 101427 00 Address: 31500 33RD PL SW Bldg B Project: JENNIFER HANSEN FEDERAL WAY WA 98023 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. . •r 0 Footings/Setback(4110) 0 Foundation Wall(4115) "El Drainage/Downspout(4040) ., Approved to place concrete Approved to place concrete Approved to backfill By Date By Date By Date •0® Re-steel(4215) '•El Slab/Concrete Floor(4255) „® Underfloor Framing(4285) ' Approved to place concrete or grout Approved to place concrete Approved to sheath floor By Date By Date By Date '0 Floor Sheathing(4105) ® Shear Walls(4245) ® Roof Sheathing(4220) Approved to install flooring Approved to install siding Approved to install roofmg By Date By i Date 41 V1 11') By Date El Fire/Draft Stops(4095) Prior to scheduling a Framing inspection; 11 Framing(4120) Approved Electrical,Plumbing&Mechanical Rough-in and Fire/Draft Stop inspections must be signed- Approved to insulate By Date off and approved. IBC 109.3.4 By Date El Insulation(4150) El Gypsum Wallboard Nailing(4130) El Suspended Ceiling Grid(4265) Approved to install wallboard Approved to install mud&tape Approved to drop tile By Date By Date By Date •' El Final-SKF&R(4060) El Final-Planning 17 Final-Building(4050) Approved Approved Approved By Date By Date By C✓y Date 1 b. t 1— )1 , Rough Electrical D Final Electrical Right of Way Approved Approved Approved By Date By Date By Date r � SUBSTANTIAL DEI COMPLETION DIBBLE ENGINEERS INC October 5, 2017 Madera West Condominium HOA Care of GFK Condominium Management 100 W. Harrison Street, Suite N530 Seattle,WA 98119 Attention:Jennifer Hanson Re: Madera West Condominium Repair, Building B Project#15-186 Dear Ms. Hanson: Dibble Engineers, Inc. (DEI) has been involved with repairs to Building B at the Madera West Condominium. Madera West is located at 31500 33rd Place Southwest in Federal Way, Washington, and includes 20 multifamily buildings. DEI was involved in a series of detailing and design elements to provide new metal guardrail connections and structural framing repairs, as needed,to structural elements exposed during the course of architectural building envelope work. DEI coordinated and reviewed the structural scope of work through occasional site visits and vial email and phone communications with the architects, Soltner Group Architects,and the contractor, CDK Construction. Specific work observed included: Repairs to exterior deck framing Improvements to deck framing to provide adequate support for guardrail forces Repairs to exterior structural wall framing The structural scope of engineering work at the Madera West Building B, as observed through site visits and through provided photo documentation,appears to be in general conformance with the intent of our structural design,as communicated through permitted structural drawings,and sketches and memos subsequently provided during the construction phase of the project. Dibble Engineers review is limited to the areas accessible and readily visible. Dibble Engineers did not conduct a building analysis for either vertical or lateral loads other than described above. Our review and discussion summary does not provide warranty either expressed or implied to the existing conditions or work completed subsequent our visit. Dibble Engineers appreciates your business.We invite you to please contact us with any questions or for clarifications to our work, and we will be happy to assist. O$$ A. DIBeasgfB Sincerely, of DIBBLE ENGINEERS, INC. A gkii- ,, Melissa K.White, PE 37445 Senior Project Manager €Tlelissa�s,dmbleengir ee s.c;o� ONAL 10/05/2017 DIBBLE ENGINEERS INC ' 1029 Market Street, Kirkland WA 98033 1425,828.4200 I dibbleengineers.com , I I September 29, 201798 SOLTNETo: City of Federal Way Permit Center architect GROW al"C r11tC�Ct� Re: Madera West Condominium - Permit#: 17 101427 00 MF, Building "B" 13 Z 0 m To Whom It May Concern: r\ c 6 This letter is provided as requested and required by Washington State 0 RCW 64.55.060. R a As recognized Building Envelope Enclosure experts this firm has performed periodic fp reviews of work in progress and completed work as required to verify that za a rehabilitative construction on the subject project structure noted above has been al (13 performed in substantial compliance with the building enclosure design documents 0 prepared by this firm and approved for permit. u c, 2 L C 4049 - r .44*ED A GI ,,, . CT < 1 TATE OF WASHINGTON m CI a CC a a U 0 a CD C 6 c n 0 3 RECEIVED C1TY OF MAR 31 2017 PERMIT APPLICATION Federal Way CITY OF FEDERAL WAY PERMIT CENTFR 0 33325 8 Avenue Soath ti Fadcra Way,WA 98003-6325 G! j!j/ y 25;.a:t,-xrn'II 1-A7(153-835 2604 Q ,t__ ,tri '.rt_.,,_t't:i.•r.rre..,; :,•r COMMUNfTY DEVELOPMENT PGRA1lT NUMBER 1 _ I Q 1 4 CCC-�� _ L_[_l TARGET DATE 51.1 ADDRESS SOtT rt'tl'a 31500 33rd Place SW, Federal Way, Wa. 98023 Building B PROJ ECT VALUAFION IONINr; ASSEYIOR'S TAXI PARCli;.N $204,500.00 RS7.2 5 0 0 7 9 0 _ 0 0 0 0 TYPE OF PERMIT $ Ett.ILo1N0 0 PI,IMIIING 0 Mor•fAN1::AL 0 DEVRIL1nON n FNttI`LFRGiC FIRE PRrVI.'t-WN NAME OF PROJ Eur Madera West Condominiums PROJ ECT DESCRIPTIONRepairs to existing condominium building. including replacement of cladding, Detailed description of work to windnws, doors and SGD1s; repairs to decks and elevated entry walkways, be included on this permit only jnrliidinrg new rails- ` NAME P,1,MARY PIIONI. Madera West Homeowners Association.Contact Jennifer Hansen 206-285-1645 PROPERTY OWNER Iv'At LINO ADJR Ess ; 100 W Harrison ST.Suite N530 Jennifer@GFKmanagement.com CITE SfAId ZIP 206-285-1645 Seattle WA 98119 NAME PHONE CDK Construction Services Inc. 425-788-8441 MAILING ADDRESS E•otstt, CONTRACTOR PO Box 1767 A"!TY Sl MME, ZIP FAX FAX Duvall WA 425-844-2025 WA STATE CONTRACTOR'S LICENSE Y ENPIRA I[o..RIA h WAY PI'Sr\FaS LACE\S;:.d CDKCOSI066MA 10/ 19 /17 20—(7—its tc f08 NAME PRIMARY PHONE Jordan Blake-Soltner Group Architects 206-547-7288 APPLICANT MAILING ADDRESS L,MA.L 1333 N Northlake Way Suite A Jordan@soltnergroup.com City STATE ZIP rax Seattle WA 98103 NSMf; _ PRIMARY PI-IMF PROJ ECT CONTACT Jordan Blake-Soltner Group Architects 206-547-7288 (The individual to receive and I IN°Ar't>xrs:; E:-E.lAlt. respond to all correspondence 1333 N Northlake Way Suite A Jordan@soltnergroup.com concerning this application) CII'! 4'b ZIP FOE SeattleWA 98103 PROJ ECT FINANCING Jennifer Hansen-GFK Management,Inc. 0 OWNER FINANCED When value is$5,000 or more Lp1;',RNC ACDR.Sz_C S1 A.1., tRCW 19 27 095) 100 W Harrison St.Suite N530 206-285-1645 t ner:ify I.oder pena Iv at perjury ,hat I ant the propur'y owner or authorized agent of the property owner 1 ca-lift tits' to the bckt of my knowledge,toe infor•na:tan cahmirted in support of this permit application is true and correct. I certify that I w IL corn p'y awn all applicatile City of Federe' Way regulartonn pertaining to the work ntithorited by I'IC 'sshance at a pe•tn.t. I ander-stand that the rsinsnee of this permit does •tot remove the owner's responsibility tar compliance with Inca I. state. or federal laws reguiat'ng oonstr uclion cr environmental ,aws f further agree to hold hs rrnie+s We City of Federal Way Al to any claim (including Co,t>,expe:r+rs,and attorneys.fees incurred to the investigation and d;:fcnee of such claim',witch may be made ey any pet son,including.he jndersigned and tiled agarirst the city, but only where ct.ch C191111 arisen out of the rzlia Den of the city, inOtu,irug us oittoers ar.d Ctnployeea, 11,1Qn .he a Oreracy of the :rtforutat.on supplied to the city as a part of this apptlLairon SIGNA'r•.LRE. ,dam _ DATE 3/29/17 PRINT NAMEJ�ftn Blake mm^ Bulletin 11;01)—January 29,2016 Page 1 of 2 l iFHandouls\Perr[tt Ap l,cation V v_,_?OF NIL.'11 2\IC'\:.\S ORK MECHANICAL PERMIT S N/A /lid icate how many of each type of fixture to be installed or relocated as part of this project.Do not include existing fixtures to remain AIR,' DUNG UNITS FANS 'GAS PIPE,OC-I E"S i t KI.I(IIP+crtt•e3 �,_ GON CRIER FIREPLACE INSI RTS !{:;< OS t : ,,.,, n .t E FL RNA ES H.)T WalER I•\'y(' ,:•,-, I .OMPItE.MFRS GAS LOG SKIS Kl;f•,21(F K\ilti'V'0,SI r DUO I G ..., GAS PIPING WUIWSIOYES VALUE OF PLUMBING WORK PLUMBING PERMIT $ N/A Indicate how many of each type of fixture to be installed or relocated as part of this project.Do not include existing fixtures to remain. &AtHMRS wr-,,shun„r•„on,•, IAVSWald Smk>: TOILETS WAlER PIPING DISHWASHERS RAINWATER SYSTEMS UIENALS OTHER(Describe) DRAINS SHOWERS VACUUM BREAKERS DRINKING FOUNTAINS SINKS,K000. l,.u)) WATER HEAIFRS 1r•l«,.,c, HOSE BINES SIIMIPS WASHING MACHINES TOTAL FIXTURES GENERAL INFORMATION esu IIr„i.A'i,AS CN -KOPbK IV” _Wirt is P,,K yC'I{)N SI WI,K,'4P`f•'✓O2 'v,2lVi.OF 4,.IS r"\C 0.1 P>:U VCa;LNIS Adjacent Greenbelt Water District Public Erosion Hazard $ — I:x's'ri,iC'PRE210':5 11SE LUl KIK.tin 2i411�10 F.✓i: 1,os's o.c::-11k:;SPKUNKI-, SYS—0.i” i r ,'c:SCr)FSRE S,I'''R'55 00,SYSrtM, Group R-2(Residential) 1,247,519 l Yes K No I7 Yes F( No RESIDENTIAL - NEW OR ADDITION AREA DESCRIPTION(in square feet) EXISTING PROPOSED TOTAL FOR OFFICE USE BASEMENT N/A N/A N/A mm FIRST FLOOR(or Mobile Home) 3558 0 3558 SECOND FLOOR 3558 0 3558 . COVERED ENTRY 343 03 - "'w- _.... .w..,.,....» .... �_„». _„,_, _ „ ,,. DECK 258 0 258 , , _�_ �..... ..�.�, _______.- GARAGE 0 CARPORT 11 N/A N/A N/A _,,,•^ m_. ._. OTHER(describe) N/A N/A N/A 11f Or,51 11 1(11 21 Area Tota Is 7717 0 7717 "NEW HOMES ONLY*' ESTIMATED SELLING PRICE$ N OF BEDROOMS , COMMERCIAL—NEW/ADDITION AREA DESCRIPTION Area in Occupancy Group(sl Construction N.of Additional Information Sgcare Feet Type Stories NEW BUILDING ADDITION COMMERCIAL—REMODEL/TENANT IMPROVEMENTS AREA DESCRIPTION Area In Occupancy Groups) Construction N of Additional Information Square Feet [•ype Stories TOTAL BUILDING I_r.V,.'2I A.'.I.>Of'L: PROJECT AREA ONLY Bulletin N100—January 29,20(6 Page 2 of 2 k:'.l landouts\Permit Application