Loading...
17-104607 Y r Mechanical City or Federal Way Permit #:17-104607-00-ME community Development Dept. 33325 8th Ave S Federal Way,WA 98003 � ' � E Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 Project Name: DODSON Project Address: 906 SW 313TH CT Parcel Number:555990 0050 Project Description: replacement of furnace Owner Applicant Contractor MICHAEL DODSON DAVID KALLANDERRANGER HEATING RANGER HEATING&COOLING LLC 906 SW 313TH CT &COOLING (GENERAL) FEDERAL WAY WA 98023 5013 PACIFIC HWY E SUITE 11 RANGEHC905OM(9/20/18) TACOMA WA 98424 2010 48TH AVENUE CT E FIFE WA 98424 Additional Permit Information Mechanical Work Valuation 2000 Is this an Online or O.T.C.application? Yes ,- ,!_..h.,�'��.d„v.z � ,��� . ...,... ..€E ; ;."�+�.,`°✓_. ..:✓.'.//.r�,.. .. . .�,r�"y%r�', :�1 ...r*�,,.�:..., r_,,,.,,.. „ter ., ._.....,.ys...,.,._,;?,,,.,r,,,,, ,,,..:M� _ wga�s Furnaces 1 PERMIT EXPIRES Monday,26 March,2018 Permit Issued on Wednesday,September 27,2017 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: ° NIL.] Date: f , /R THIS CARD IS TO REMAIN ON-SITE �` Construction Inspection Record Feet WayINSPECTION REQUESTS:(253)835-3050 PERMIT#: 17 104607 00 Address: 906 SW 313TH CT Project: BETHANY A DODSON FEDERAL WAY WA 98023-4562 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. El Mechanical Rough-in(4165) , 0 Gas Piping(4125) 0 Final-Mechanical(4065) Approved Approved to release test Approved By Date By Date ; By ,.r) Date i:' 131 ii 0 Rough Electrical Final Electrical 0 Right of Way Approved Approved Approved By Date By Date By Date