17-104120 Mechanical
City F8Way � ' •
co, ,�a�ty Development Dept E
3 . Permit #.17-1041 -00-ME
333232 5 8thth AveAvS
Federal Way,WA 98003 LInspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax:(253)835-2609
Project Name: PEARSON
Project Address: 657 SW 299TH ST Parcel Number:233680 0170
Project Description: Replacing gas furnace and adding A/C.
Owner Applicant Contractor
MARK S PEARSON VANESSA STEPHENSONWASHINGTON WASHINGTON ENERGY SERVICES CO
657 SW 299TH ST ENERGY SERVICES CO (GENERAL 01)
FEDERAL WAY WA 98023 3909 196TH ST SW WASHIES851NS(9/7/19)
LYNNWOOD WA 98036 3909 196TH ST SW
LYNNWOOD WA 98036
•
Additional Permit Information
Mechanical Work Valuation? 11500 Is this an Online or O.T.C.application? Yes
Air Conditioners-Stand Alont 1 Furnaces 1
PERMIT EXPIRES Saturday,24 February,2018
Permit Issued on Monday,August 28,2017
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: NJ 1...I Date:
THIS CARD IS TO REMAIN ON-SITE
Fed11111111 eral Way Construction Inspection Record
INSPECTION REQUESTS: (253)835-3050
PERMIT#: 17 104120 00 Address: 657 SW 299TH ST
Project: MARK S PEARSON FEDERAL WAY WA 98023-3557
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
® Mechanical Rough-in(4165) 0 Gas Piping(4125) ® Final-Mechanical(4065)
Approved Approved to release test Approved
By Date ..By Date , By r, A. Date 12=fT
0 Rough Electrical 0 Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date