Loading...
10-103853City of Federal Way Apolicant Community Development Services P.O. Box 9718 RAYMOND E DINGES Federal Way, WA 98063-9718 FILE Ph: (253) 835-2607 Fax: (253) 835-2609 33919 9TH AVE S SUITE 105 Project Name: DINGES Project Address: 1406 S 348TH ST Project Description: Demolition of (1) residential structure Demolition Permit #: 10 -103853 -00 -DE Inspection Request Line: (253) 835-3050 Parcel Number: 202104 9021 Owner Apolicant Contractor RAYMOND E DINGES COURT PIXTON RUSS LLOYD CLEARING & DEMO DINGES ENTERPRISES LLC 33919 9TH AVE S SUITE 105 RLCLEEI097N2 (4/15/12) 600 131 ST AVE N FEDERAL WAY WA 98003 1741 S 356TH ST BELLEVUE, WA 98005-3345 FEDERAL WAY WA 98003 Demolition Valuation.............................................5200 PERMIT EXPIRES Sunday, September 9, 2012 Permit Issued on Friday, September 10, 2010 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and of Federal Way. Owner or agent: Dater ? THIS CARD IS TO REMAIN ON-SITE CITY OF THIS Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 10 -103853 -00 -DE Address: 1406 S 348TH ST Owner: RAYMOND E DINGES FEDERAL WAY, WA 98003-6855 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. ❑ Yinal - Buildu Approved By Date Rough Electrical Approved Final Electrical Approved Right of Way Approved By Date By Date By Date C•Yi UY ': el COMMHNITY DEVELOPMENT SERVICES 253-835-2607• FAX 253-835-2609 r ru:r. iq,S;;ed^rale r_ �: ccm PERMIT APPLICATION - 4 _(),=�3 2553 SI&F CO ME PLO EN FP SITE ADDRESS SUITE/UNIT o Y-" S/-. , PROJECT VALUATION ZONING ASSESSOR'R'S� TAX/PARCEL # % TYPE OF PERMIT ❑ BUILDING [IPLUMBING ❑ MECHANICAL MOLITION ❑ ENGINEERING ❑ FIRE PREVENTION NAME OF PROJECT (Tenant Name/Homeowner Last Name) PROJECT DESCRIPTION ../ ii� Detailed description of work to be included on this permit only 10 HM NAME - RI PHONE �� O .N L6M PROPERTY OWNER ILI� !' ZA49L> /�� MANG DRE 121_!/'.STAT E-MAIL CITY ZIP NAME ' 1. r, ea w PHONE MAILING ADDRESS E-MAIL CONTRACTOR Q CITYTE 1T D Q 3 FAX Z 340 6G % WA STATE CONTRACTOR'S LICENSE # 5ifl PIRATION DATE JEX FEDERAL WAY BUSINESS LICENSE # zo . - a N riv, PHONE A 53 yJQ ADDRESSZT 33E Z-7 9�` S. le s— E-MAIL APPLICANTMAt;rNG C a,Lli,.t STATE ZIP 4 FAX C.&A S__j12)6 PROJECT CONTACT (The individual to receive and respond to all correspondence NAME PHONE MAILING ADDRESS E-MAIL concerning this application) CITY STATE ZIP FAX ALTERNATE CONTACT NAME-. PHONE E-MAIL PROJECT FINANCING NAME OWNER -FINANCED Required value of $5, 000 or more MAILING ADDRESS, CITY, STATE, ZIP PHONE (RCW 19.27.095) I certify under penalty of perjury that I am the property owner or authorized agent of the property owner. I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct. I certify that I will comply with ail applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in the investigation and defense of such claim), which may be made by any person, including the undersigned, and filed against the city, but only where such claim ses out o e r lance of the city, including its officers and employees, upon the accuracy of the information supplied tot a ci asap fofthis pplication. SIGNATURE: DATE PRINT NAME: x Bulletin #100 —April 14, 2010 Page 1 of 3 k:\lIandouts\Perinit Application / " K8 � ^ TOTAL FOR OFFICE USE X. WoRic $ (a copy of bid or estimate must be provided) FIRST FLOOR (or Mobile Home) Indicate how many of each type offixture to be installed or relocated as part of this project. Do not include existing JIxtures to remain. AIR HANDLING UNITS FANS GAS PIPE OUTLETS OTHER (Describe) AIR COND TI ER FIREPLACE INSERTS HOODS pom=rcisly BOILERS FURNACES HOT WATER TANKS COMPRESSORS GAS LOG SETS REFRIGERATION SYST DUCTING GAZ PIPING WOODSTOVES X. Indicate how many of eac��P_ e ofjlxture to be installed or relocated as part of this project. Do notinclude existing fixtures to remain. BATHTUBS (or Tub/Sh—c— LAVS (H�d Sinks) TOILETS WATER PIPING DISHWASHERS RAINWATER SYSTEMS URINALS OTHER (Describe) DRAINS SHOWERS VACUUM BRiA. RS DRINKING FOUNTAINS �_ SINKS oua=" n°�' __—�' |HOSE BIBBS SUMPS WASHING CHINES CRITICAL AREAS ON PROPERTY� WATER PURVEYOR SEWERPURVEYOR VALUE OF EXISTING IMPROVEMENTS EXISTING/PREVIOUS USE LOT SIZE (In Sq� t) EXISTING FIRE SPRINKLER SYSTEM? PROPOSED FIRE SUPPRESSION SYSTEM? AREA DESCRIPTION (in square feet) EXISTINq PROPOSED TOTAL FOR OFFICE USE X. FIRST FLOOR (or Mobile Home) COVEREUENTRY GARAGE 0 CARPORT 0 AREA DESCRIPT± Area Occupancy Group(s) Construction # of Additional Information in Square Keet Type Stories TENANT AREA ONLY Bulletin #100—April ]4,zO0 k:\Handouts\PernIit Application ` Approved Transaction • 0 Page 1 of 1 psdear a r.org Faget Sound Gran Air Agency Single -Family Notification Case #: 201002456 This page must be printed. A printout of the notification, all amendments to the notification, and the asbestos survey shall be available for inspection at all times at the asbestos project or demolition site (Reg III, 4.03(a)(6)). Fee Amount Paid $75.00 Credit Card Transaction # VQEF5E85FE4A Transaction Date 09/09/10 owner's Name Dinges Enterprises LLC Phone (253) 838 4100 Project Street Address 1406 South 348th St City Federal Way Zip 98003 Contact Person Court Pixton Phone (253) 838 4100 Mailing Address 600 131st Ave Bellevue, WA 98005 This project includes a demolition. Demolition Start Date 09/10/10 Completion Date 09/10/10 Demolition will be completed by a demolition contractor This is an emergency project. The emergency reason: There was a sudden, unexpected event that resulted in a public health or safety hazard. I certify that: (1) This is a single-family residence project. The structure is used by one family who owns the property as their domicile. (2) The information I have provided is to the best of my knowledge accurate and complete. (3) I understand the fee for this Notification is nonrefundable. Create Another Notification If you have questions, contact us at asbestos@pscleanair.org or 206.689.4058. https://secure.pscleanair.org/Asbestos/Approved.aspx 9/9/2010 • DEPARTMENOCommuNITY DEVELOPMENT SERVICES 33325 8`h Avenue South d VED PO Box 9718 CITY O Federal Way WA 98063-9718 'EP 77 253-835-2607; Fax 253-835-2609 Federal Way LI 1 0 2c,,,ea,iw.c ;of[-dera:"avcom Wq k DEMOLITION PtKMIT REQUIREMENTS A demolition permit is required to remove any structure or structures on a subject property. Check with the City's Planning Division to see if the proposal exceeds thresholds that trigger an environmental review. An environmental review and submittal of an environmental checklist may be required, which will extend the time period before a demolition permit can be issued. ❑ Prior to submitting a demolition permit, the following items (as applicable) must be signed by the respective agency (see attached Demolition Permit Contact List). NOTE ToAPPLiCANT. Utilities shall be disconnected and services performed, if applicable, prior to issuance of the demolition permit. All applicable items below are to be sined and dated by the respective agency representatives. 1. ASBESTOS ABATEMENT (Copy of approval form and asbestos survey from Puget Sound Clean Air Agency provided) 44 f Federal Way Building Official) 2. GAS SUPPLY (Gas to be shut off, e r e ved and final bill paid) / / (Pucjet Sound Energy) 3. SEPTIC SYSTEM (Tank to be removed or tank to be drained and filled) 51fe oo d k S! �c. i [ (King 9bunty Environmental Services) 4. SANITARY SEWER (C ck applicable box) o Sewer line capped at o�llne o Existing sewer line toe d be used by proposed new structure (Lalpr?/iavEn Utility District) 5. GARBAGE // j, gdi (All household garbagsgb Aoff and final bill paid) er ❑ Completed Construction Permit Application form ❑ Provide the following fees: 1. Demolition Permit Fee 2. Automation Fee 3. WA State Surcharge 6. ELECTRICITY (EI ctricity to be shut off an m �r removed) (P get Sound Energy) 7. FUEL STORAGE TANKS (Above or below grade fuel tanks, have been pumped or removed under Fire Department e ft Aior to any dismantle/excavation) TSO u in Fire and Rescue) 8. WATER- Public Source (Check applicable box) o Meter to be removed and final utility bill paid Meter to remain and be protected (Water Supplier) ` ****** OR ****** 9. WATER- Private Well (Check applicable box) o Private well filled and cappe ❑ Private well to be used r o urposes (Ki Con vironmental Services) ME Based on valuation. See table on pg 4 of the construction permit application. $6.00 $4.50 Bulletin #122 — January 26, 2010 Page 1 of 1 k:\Handouts\Demolition Permit Requirements k 0 CITY OF V"'—'"0P Federal Way DEPARTMENT OF AMUNITY DEVELOPMENT SERVICES 333258 1h Avenue South PO Box 9718 Federal Way WA 98063-9718 253-835-2607; Fax 253-835-2609 www.cityoffederalwa DEMOLITION PERMIT CONTACT LIST This list of agencies may assist you in expediting the demolition permit process. Refer to the demolition permit requirements for signature blocks. All applicable signatures are required prior to permit approval. 1. Asbestos Removal: Puget Sound Clean Air Agency 9. Fire Department: South King Fire & Rescue 33325 80' Avenue South / PO Box 9718 Federal Way, WA 98063 253-946-7248 Bulletin #109 — March 1, 2007 Page 1 of I k:\Handouts\Demolition Permit Contact List 110 Union Street, Suite 500 Seattle, WA 98101-2038 206-343-8800 —OR— 800-552-3565 www.pscleanair.org 2. Electricity: Puget Sound Energy Tacoma Public Utilities Attn: Construction Coordinator Customer Service 22828 68`x' Avenue South, Suite 9102 —OR— 747 Market Street Kent, WA 98032 Tacoma, WA 98402 888-225-5773 253-383-9600 or 253-383-2471 3. Gas: Puget Sound Energy 805 156a' Avenue NE Bellevue,,WA 9$00,4, . . 888-225-5773 4. Telephone: Qwest Communications 801-962-2475 (phone) / 801-237-6491 (fax) 5. Water: Lakehaven Utility District Tacoma Public Utilities Technical Service Division Customer Service ` 31623 First Avenue South —OR— 747 Market Street Federal Way, WA 98003 Tacoma, WA 98402 253-941-2288 253-383-9600 or 253-383-2471 6. Garbage: Waste Management 655 Second NW Auburli; WA 98071 s 253-833-3333 (residential) — OR — 253-939-9792 (commercial) 7. Sewer: Lakehaven Utility District Technical Services Division 31623 First Avenue South Federal Way, WA 98003 253-941-2288 8. Septic: King County Environmental Services 14350 SE Eastgate Way , Bellevue, WA 98007 206-296-4932 9. Fire Department: South King Fire & Rescue 33325 80' Avenue South / PO Box 9718 Federal Way, WA 98063 253-946-7248 Bulletin #109 — March 1, 2007 Page 1 of I k:\Handouts\Demolition Permit Contact List 30G&N Septic Tank Service ; r- 1 Military Rd. S Auburn, Washington 980 0. (253) 838-1028 (253) 927-2860 (425) 255-9111 Fax: (253) 838-7971 www.gnseptic.com Date: X'`%`` Name:�r8 , IS&N Address:'�� (11 4� '32Y'0 i City:'` "? 11 Septic Tank Service Phone: ESTABLISHED IN 1950 Mailing Address: Description of Services: Amount Depth of Scum 1S'Compartment VIVA i„.. in. Depth of Scum 2nd Compartment in. Depth of Sludge 2nd Compartment (in.) General Tank Condition CITY OF WAN Inlet Baffle Condition �t Outlet Baffle -Condition Tax %%: :°.. Total: Sewage Tank Data (check/circle all that apply): Type of Sewage Tank: Septic Tank Pump Tank Holding Tank her Number of Compartments Pumped:_ Number of Gallons Pumped: Checklist Item: Measurement Satisfactory Unsatisfactory N/A Action Taken: Depth of Scum 1S'Compartment (in.) Depth of Sludge 1St Compartment in. Depth of Scum 2nd Compartment in. Depth of Sludge 2nd Compartment (in.) General Tank Condition Riser(s) at Grade Inlet Baffle Condition �t Outlet Baffle -Condition Effluent Baffle Screen Condition Description of Other Service Performed and/or Recommendations: Tank Location/Septic System Sketch: Technician Signature:,.° Customer Signature: If this account is not paid as agreed, 1 agree to pay in addition to the foregoing, a reasonable attorney's fee, and if this account is placed in the hands of a collection agency, 1 agree to pay any and all collection charges and fees not to exceed 50% fifty percent of the amount unpaid. $25 returned check fee. Licensed in King & Pierce County -- Bonded & Insured Contractor Registration #: GNSEPNS940BD G Ni'v 00 .1 f Job #10164 1406 South 348th St. Federal Way,, WA 98003 For Puget Sound Commercial 33919 9th Ave South # 105 Federal Way, WA 98003 GS. Services, Inc. 4 57th Avenue East Suite A Ilup, WA 98375 1e: 253-548-1011 Fax: 253-536-8488 F.B.�'GB. SERVICES GS. L INTERIOR DEMOLITION 'IiecelvxjzD C17 -Y SEP 10 2010 Or �SFRAL WAY Prepared by: (,6arfic'706e HFA,7 (Bui -f ing Inspector " -d 0 • -------------------------------- TYPE FACILITY: ' Single Family Residence ' ADDRESS: 1406 South 348th St. ' Federal Way, WA 98003 I -------------------------------J INTENT OF SURVEY. The intent was to identify immediate or potential asbestos health hazards for building renovation or demolition. Sampling was done on all accessible suspect building materials. DATE OF GOOD FAITH ASBESTOS SURVEY. 9-7-2010 AHERA INSPECTOR: Charlie Jobe (Certificate # 1066812 Expires: 5/19/2011). LABORATORY CREDENTIALS: All suspect materials were analyzed by Schnieder Laboratories, Inc. in accordance with 40 Code of Federal Register Chapter 1, Part 763, Subpart F. A1HA Bulk Asbestos Analytical Testing Program (101 150-0). DESCRIPTION OF BUILDING: Vacant, single family residence. ✓ INTERIOR — The interior has sheet vinyl and floor tile on a wood sub strait. The walls and ceilings are clad with gypsum wall board with an orange peel texture. There is fiberglass insulation in the attic. ✓ EXTERIOR — The exterior consists of a combination of wood lap and T-111 siding with a grey and black 3 -tab roof. A Puget Sound Clean Air Agency permit is required to obtain a demolition permit. Prior to any demolition or renovation, all friable and non -friable asbestos containing materials (ACM) are to be removed and disposed of in accordance with applicable Federal, State and Local regulations. If there are any asbestos containing materials left on site that will not be disturbed during the renovation or demolition process, we recommend an Asbestos Operational and Maintenance Program (OM) be developed and implemented to monitor the remaining ACM. 0 • ASBESTOS SUMMARY The AHERA regulation, 40 Code of Federal Regulations (CRF) 763, is the primary governing regulation when performing asbestos surveys. This regulation was originally enacted for school buildings, but has since been applied to public and commercial buildings. Puget Sound Clean Air Agency (PSCAA) Regulation 111, Article 4.02(a) requires an Asbestos survey before the renovation or demolition of any structure over 120 square feet. AHERA Protocol determines the number of samples of each material to be collected, depending on its category and amount of material present. AHERA regulations segregate suspect materials into three categories: ❖ Surfacing Materials : A sprayed or troweled on texture applied to walls, ceilings, wall cavities and structural members for acoustical, decorative or fireproofing purposes. AHERA requires collection of a minimum of 3 to 7 samples per homogenous material depending on the quantity of material. ❖ Thermal System Insulation: Insulation used to inhibit heat transfer or prevent condensation on pipes, boilers, tanks, ducting, furnaces and other components of hot and cold water systems and heating, ventilation, and air conditioning systems. AHERA requires collection of at least 3 samples of each homogenous material. ❖ Miscellaneous Materials: Other, largely non -friable products and materials such as floor coverings, ceiling tile, roofing, outdoor siding, concrete pipe, silver coatings and many others building materials. AHERA requires the collection of at least one sample per homogenous material. After identifying the suspect materials, bulk samples were collected and taken to an independent accredited laboratory to be analyzed for the amount and type of asbestos, if any. The bulk samples were analyzed using Polarized Light Microscopy (PLM) stain dispersion staining techniques in accordance with the EPA Method 600/R-93/166, which has a reliable limit of quantification of one percent asbestos by volume. Survey Findings at 1406 South 348th St. There were a total of 8 (eight) suspect building materials (bulk samples) removed from this structure during this survey. Based on the lab analysis, 0 of the 8 samples tested positive for asbestos. The following materials were found to contain 1 % or more asbestos fibers. Asbestos containing materials None of the samples taken tested positive for asbestos. F.S. & GS Services does not guarantee approximations of quantities of ACM, which may be listed with this report. It is therefore recommended that professional abatement price be obtained by an on site visit to verify quantities. EPA AND LABOR & INDUSTRY EXTRACTS Current federal regulations (NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS, NESHAPS, CFR 40, PART; 61, SUBPART M [REVISED SUBPART B]) require that no renovation or demolition activity release asbestos fibers to the environment. Therefore, all affected asbestos containing materials must be removed by a certified asbestos contractor prior to remodel or demolition. WAC 296-62-07707, Identification, requires an owner to perform a good faith inspection to determine whether materials to be worked on or removed contain asbestos. LIMITATIONS In accordance with your request, F.S. & GS. Services, Inc., has conducted an A.H.E.R.A. type survey. F.S. & GS. warrants that the survey was performed with the usual thoroughness and competence of this profession, and within the limits of accessibility to materials. The survey was conducted within the guidance provided by 40 CFR Part 763, Subpart E, Appendix C. F.S. & GS. Services is not responsible for materials, hidden from sight, that cannot be found with reasonable diligence, such as materials in foundations or slab floors. We are providing this information for the express use of Puget Sound Commercial and we make no warranty of sufficiency of data to any other parties. This survey and demo permit will need to be submitted to the Puget Sound Clean Air Agency prior to renovation or demolition activity. Charles Jobe AHERA INSPECTION EXPIRES CERTIFICATION NUMBER #1066812 5/19/2011 0 CHAIN OF. CUSTODY 0 r�L F.S. & GS. SERVICES INC. 16214 -57TH Ave. East Suite A PUYALLUP WA 98375 ASBESTOS SAMPLE LOG AND SAMPLE NOTES BUILDING NAME: Single Family Residence ADDRESS: 1406 South 348th St. Federal Way, WA 98003 TEL# 253-548-1011 FAX# 253-536-8488 DATE: 09-07-2010 PROJECT# 10164 CLIENT NAME: Puget Sound Commercial ADDRESS: 33919 9th Ave South # 105 Federal Way, WA 98003 SAMPLE# FLOOR PHOTO# AREA TYPE OF MATERIAL 001 MAIN 1 MUDD ROOM BROWN SQUARE PATTERN SHEET VINYL 6702 MAIN 2 MUDD ROOM GREY FLOOR TILE 003 MAIN 3 DINING ROOM ORANGE PEEL TEXTURE & DRY WALL CJ04 MAIN 4 LIVING ROOM ORANGE PEEL TEXTURE & DRY WALL 005 MAIN 5 HALLWAY ORANGE PEEL TEXTURE & DRY WALL CJ06 MAIN 6 LIVING ROOM GOLD PEBBLE PATTERN SHEET VINYL 007 MAIN 7 BEDROOM TAN MARBLE PATTERN SHEET VINYL C308 EXTERIOR 8 ROOF BLACK 3 -TAB ROOFING RECEIVED BY: DATE/TIME:' INSPECTORS' SIGNATURE: FOR LAB USE ONLY _x_ Same Day 0 t LAB RESULTS • SCH IDER LABORATORIES INCORPORATED 2512 W. Cary Street • Richmond, Virginia • 23220-5117 804-353-6778 • 800 -785 -LABS (5227) • (FAX) 804-359-1475 Excellence in Service and Technology AIHA/ELLAP 100527, NVLAP 101150-0, NYELAP/NELAC 11413, CAELAP 2078, NC 593, SC 93003 LABORATORY ANALYSIS REPORT Asbestos Identification by EPA Method' 600/M4/82/020 Using SLI A6 ACCOUNT #: 2269-10-3488 CLIENT: F.S. & G.S. SERVICES INCi DATE COLLECTED: 9/7/2010 DATE RECEIVED: 9/8/2010 ADDRESS: 16214 57TH AVE EAST STE A DATE ANALYZED: 9/8/2010 PUYALLUP, WA 98375 DATE REPORTED: 9/9/2010 PROJECT NAME: Single Fam Residence JOB LOCATION: 1406 South 348th St PROJECT NO.: 10164 PO NO.: SampleType: BULK Client SLI Sample Sample Sample/ Identification/ No. Layer ID Layer Name PLM Analysis Results Asbestos Fibers Other Materials CJ01 30722569 Mudd Rm Sheet Vinyl Layer 1: Sheet Flooring None Detected 10% MINERAL/GLASS WOOL Brown, Organically Bound 90% NON FIBROUS MATERIAL CJ02 30722570 Mudd Rm FL Tile Layer 1: Floor Tile None Detected 5% CELLULOSE FIBER Gray, Organically Bound 95% NON FIBROUS MATERIAL Layer 2: Mastic None Detectedo Yellow, Soft 100 /o NON FIBROUS MATERIAL CJ03 30722571 Dining Rm Drywall Layer 1: Drywall None Detected 10% MINERAUGLASS WOOL Off White, Powdery 80% NON FIBROUS MATERIAL Layer 2: Textured Material 10°% CELLULOSE FIBER White, Granular None Detected 100°% NON FIBROUS MATERIAL CJ04 30722572 Living Rm Drywall Layer 1: Drywall System <1% CHRYSOTILE Off White/Beige/White, Powdery/Granular 5�% CELLULOSE FIBER 95 /o NON FIBROUS MATERIAL otal Number of Pages in Report: 2 results relate only to samples as received by the laboratory. (mended Report 09/09/2010 14:54 Visit www.slabinc.com for current certifications. ample #4 needs to be composited .amples analyzed by the EPA Test Method are subject to the limitations of light microscopy including matrix interference. Gravimetric eduction and correlative analyses are recommended for all non organically bound materials. This method has a reporting limit of or greater. Visual estimation contains an inherent range of uncertainty. This report must not be reproduced except in full with the :)proval of the lab, and must not be used to claim NVLAP or other govt agency endorsement. 4ccount - Workorder 2269-10-3488 Layer 1: (Continue# Page 2 (Continued) Ilient SLI Sample 80% NON FIBROUS MATERIAL Sample Sample/ Identification/ PLM Analysis Results Vo. Layer ID Layer Name Asbestos Fibers Other Materials ,J05 30722573 Hallway Drywall None Detected 20% CELLULOSE FIBER Layer 1: Drywall None Detected 10% CELLULOSE FIBER Off White, Powdery 10% MINERAUGLASS WOOL ,J08 30722576 Roof 3 -Tab Roofing 80% NON FIBROUS MATERIAL Layer 2: Textured Material None Detected 100% NON FIBROUS MATERIAL Beige, Granular 80% NON FIBROUS MATERIAL 'J06 30722574 Living Rm Sheet Vinyl Layer 1: Sheet Vinyl/Mastic None Detected 20% CELLULOSE FIBER Gold/Brown, Org.Bound/Soft 80% NON FIBROUS MATERIAL Unable to separate individual layers. ;J07 30722575 Bedroom Sheet Vinyl Layer 1: Sheet Vinyl/Mastic None Detected 20% CELLULOSE FIBER Tan/Brown, Org.Bound/Soft 80% NON FIBROUS MATERIAL Unable to separate individual layers. ,J08 30722576 Roof 3 -Tab Roofing Layer 1: Roofing None Detected 20% MINERAL/GLASS WOOL Gray/Black, Granular/Bituminous 80% NON FIBROUS MATERIAL ialyst: SUSAN CHILDRESS Reviewed By: Hind Eldanaf, Asbestos Area Supervisor ital Number of Pages in Report: 2 )sults relate only to samples as received by the laboratory. Visit www.slabinc.com for current certifications 'nenaea rteport 0910912010 14:54 i'mple #4 needs to be composited tmples analyzed by the EPA Test Method are subject to the limitations of light microscopy including matrix interference. Gravimetric Duction and correlative analyses are recommended for all non -friable, organically bound materials. This method has a reporting limit of or greater. Visual estimation contains an inherent range of uncertainty. This report must not be reproduced except in full with the proval of the lab, and must not be used to claim NVLAP or other govt agency endorsement. 0 FLOOR PLAN FLOORPLAN JOB # 10164