Loading...
12-104813 • Mechanical City of Federal Way Community&Econ.Dev.Services Permit #: 12-104813-00-ME 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 p q Project Name: GUNNETTE Project Address: 32512 30TH AVE SW Parcel Number: 873190 2190 Project Description: Gas pipe to generator Owner Applicant Contractor IRENE GUNNE 1IL CHRISTIANA FLAJOLE BOB'S HEATING&A/C INC(GENERAL) 32512 30TH AVE SW BOB'S HEATING&A/C INC BOBSHHA9790B(9/2/13) FEDERAL WAY WA 98023-2562 13633 NE 126TH PL SUITE 350 13615 126TH PL NE SUITE 400 FEDERAL WAY WA 98034 KIRKLAND WA 98034 Additional Permit Information Mechanical Valuation 876.00 Is this an Online or O.T.C.application? Yes Mechanical Fixtures Gas Pipe Outlets 1 CONDITIONS: A permanently installed generator is not allowed to be placed within required yards(setbacks). See Bulletin #150 for placement details. PERMIT EXPIRES Saturday, April 20, 2013 Permit Issued on Monday, October 22, 2012 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: 0 I' E Date: Pt/41ALWD i%% f(2 • THIS CARD IS TO MAIN ON-SITE CITYoF Construction In ection Record Federal Way INSPECTION REQUE TS: (253)835-3050 PERMIT#: 12-104813-00-ME Address: 32512 30TH AVE SW Project: IRENE GUNNETTE FEDERAL WAY, WA 98023-2562 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 Mechanical Rough-in(4165) ❑ Gas Piping(4125) 0 Final-Mechanical(4065) Approved Approved to release test ,i3 pv Approved By Date By PeC Date ,/2i By /..,'"41- Date /4.7-2G 12. 0 Rough Electrical El Final Electrical Right of Way Approved Approved Approved By Date By Date By Date •