12-104813 • Mechanical
City of Federal Way
Community&Econ.Dev.Services Permit #: 12-104813-00-ME
33325 8th Ave S
Federal Way,WA 98003 Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax:(253)835-2609 p q
Project Name: GUNNETTE
Project Address: 32512 30TH AVE SW Parcel Number: 873190 2190
Project Description: Gas pipe to generator
Owner Applicant Contractor
IRENE GUNNE 1IL CHRISTIANA FLAJOLE BOB'S HEATING&A/C INC(GENERAL)
32512 30TH AVE SW BOB'S HEATING&A/C INC BOBSHHA9790B(9/2/13)
FEDERAL WAY WA 98023-2562 13633 NE 126TH PL SUITE 350 13615 126TH PL NE SUITE 400
FEDERAL WAY WA 98034 KIRKLAND WA 98034
Additional Permit Information
Mechanical Valuation 876.00 Is this an Online or O.T.C.application? Yes
Mechanical Fixtures
Gas Pipe Outlets 1
CONDITIONS:
A permanently installed generator is not allowed to be placed within required yards(setbacks). See Bulletin
#150 for placement details.
PERMIT EXPIRES Saturday, April 20, 2013
Permit Issued on Monday, October 22, 2012
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: 0 I' E Date:
Pt/41ALWD i%% f(2
• THIS CARD IS TO MAIN ON-SITE
CITYoF
Construction In ection Record
Federal Way INSPECTION REQUE TS: (253)835-3050
PERMIT#: 12-104813-00-ME Address: 32512 30TH AVE SW
Project: IRENE GUNNETTE FEDERAL WAY, WA 98023-2562
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0 Mechanical Rough-in(4165) ❑ Gas Piping(4125) 0 Final-Mechanical(4065)
Approved Approved to release test ,i3 pv Approved
By Date By PeC Date ,/2i By /..,'"41- Date /4.7-2G 12.
0 Rough Electrical El Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date •