11-100636 - Electrical
City of Federal Way
Community Development Services Permit #: 11-100636-00-EL
P.O.Box 9718
Federal Way,WA 98063-9718
Ph:(253)835-2607 Fax (253)835-2609F
' E Inspection Request Line: (253)835-3050
Project Name: JR IMPORT AND EXPORT
Project Address: 34012 9TH AVE S Unit C13 Parcel Number: 926480 0110
Project Description: REPLACE EXISTING WITH NEW BURGLAR ALARM AND ADD ON.
•
Owner Applicant Contractor
CAMPUS BUSINESS PARK ADT SECURITY SERVICES A D T SECURITY SERVICES INC
1019 PACIFIC AVE#1119 NORTHWEST PERMIT INC ADTSESI032O5(9/25/11)
TACOMA WA 11824 N CREEK PKWY SUITE 105 11824 NORTH CREEK PKWY N SUITE 105
98402-4468 BOTHELL WA 98011 BOTHELL WA 98011
Is Use Educational or Institutional? No Service greater than 999 Amps? No
Low Voltage-Burglar Alarm(Cor 1
PERMIT EXPIRES Tuesday, February 14, 2012
Permit Issued on Monday, February 14,2011
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: 0,ej,Q Date: ��(
THIS CARD IS TO REMAIN ON-SITE
CITY OF Construction Inspection Record
Federal Way INSPECTION REQUESTS: (253)835-3050
PERMIT#: 11-100636-00-EL Address: 34012 9TH AVE S Unit C13
Project: CAMPUS BUSINESS PARK FEDERAL WAY, WA 98003
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0 Service(4235) 0 Feeders/Sub-panels(4045) 0 Rough Electrical(4225)
Approved Approved Approved
By Date By Date By Date
E Ceiling Cover(4020) 0 Final-Electrical(4055)
Approved Approved
By Date By Date
•
0 Rough Electrical Final ElectricalEl Right of Way
Approved Approved Approved
By Date By Date By Date •