09-104638 . ~
•
• Electrical
, City of Federal Way �101 Q
Community Development Services c l Permit #: 09-104638-00-E L
P.O.Box 9718 O"
Federal Way,WA 98063-6719 ILE inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax (253)835-2609 r
Project Name: GILLIAM
Project Address: 648 SW 305TH ST Parcel Number: 178880 0140
Project Description: Install 200 amp service
Owner Applicant Contractor
BONNIE GILLIAM STEVE KEITHLY KEITHLY ELECTRIC
648 SW 305TH ST 827 S DIRECTOR ST KEITHEC101B7 (1/11/10)
FEDERAL WAY WA 98023-3953 SEATTLE WA 98108 827 S DIRECTOR ST
SEATTLE WA 98108
ot°'.r„ .., t ?v jai
Is Use Educational or Institutional? No
Alt. Serv./Feeder:0 to 200 amps(F 1
PERMIT EXPIRES Wednesday, November 24, 2010
Permit Issued on Tuesday November 24, 2009
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: ,�E�L_ Date: /k 66'`/ D
P/A
L
(io
THIS CARD ISTMAIN ON-SITE
-CITY OF • Construction Ipection Record
Federal Way INSPECTION REQUESTS: (253) 835-3050
PERMIT#: 09-104638-00-EL Address: 648 SW 305TH ST
Owner: BONNIE GILLIAM FEDERAL WAY, WA 98023-3953
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
❑ UFER Ground (4295) El Ditch cover(4030) 0 Slab/Concrete Floor(4255)
Approved Approved Approved to place concrete
By Date By Date By Date
El Pool Bonding(4195) �0 Temporary Power(4275) El Service(4235)
Approved Approved Approved
By Date By Date By Date
,
O Feeders/Sub-panels(4045) El Rough Electrical(4225) El Ceiling Cover(4020)
Approved Approved Approved
By Date By Date By Date
El Final-Electrical(4055)
Approved
B Date/�7 :G /62
FILE
Rough Electrical Final Electrical Right of Way
I=1Approved CIRough
❑ Approved
By Date By Date By Date