17-104837 — -- . . 4
Mechanical
City of Federal way Permit #:17-104837-00-ME
Community Development Dept.
33325 8th Ave S
Federal Way,WA 98003F11..E Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax:(253)835-2609
Project Name: TRUJILLO/PEREZ
Project Address: 33313 28TH PL SW Parcel Number:010060 0750
Project Description: Replacing 80%gas furnace with a 90%gas furnace
Owner Applicant Contractor
IRIANY TRUJILLO A A A HEATING&AIR CONDITIONING A A A HEATING&A/C(GENERAL)
33313 28TH PL SW 22641 83RD AVE S AAAHEHA874QM(11/14/17)
FEDERAL WAY WA 98023 KENT WA 98032
22641 83RD AVE S
KENT WA 98032
Additional Permit Information
Mechanical Work Valuation? 5000.00 Is this an Online or O.T.C.application? Yes
Furnaces 1
PERMIT EXPIRES Saturday,7 April,2018
Permit Issued on Monday,October 9,2017
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws,rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: 0 NI I. N E Date:
STA' THIS CARD IS TO REMAIN ON-SITE
Federal Way Construction Inspection Record
INSPECTION REQUESTS:(253)835-3050
PERMIT#: 17 104837 00 Address: 33313 28TH PL SW
Project: MARIO SAUCED()PEREZ FEDERAL WAY WA 98023-2743
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
Q Mechanical Rough-in(4165) [3 Gas Piping(4125) El Final-Mechanical(4065)
Approved Approved to release test Approved
•By Date �:•By Date By eAkoti Date'l1D--21. .Tj .
0Rough Electrical .❑ Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date