Loading...
10-100026 • 41 Mechanical L'ity of Federal Way • - + Community Development Services Permit #: 10-100026-00-ME P.O.Box 9718 Federal Way,WA 98063-9718 „ Inspection Re uest Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609rI L-L. p Q Project Name: JOHNSON Project Address: 2623 SW 332ND ST Parcel Number: 894430 0800 Project Description: Replace gas furnace&water heater Owner Applicant Contractor MARVIN JOHNSON RUSS TRUSSELL ABLE AIR LLC 2623 SW 332ND ST ABLE AIR LLC ABLEAAL946MC(7/3/10) FEDERAL WAY WA 32505 N 2ND(PO BOX 521)AVE PO BOX 521 98023-2836 BLACK DIAMOND WA 98010 BLACK DIAMOND WA 98010 ,. .•x;, ' • Mechanical Valuation 5708.00 Is this an Online or O.T.C.application? Yes 4�z .Y�" �taw;, .. ���, .a�.Z��� '� '�,,..�\� v <ti: 'oti„iitt,r,.:. :MA,44 _'tt wa Furnaces. 1 Hot Water Tanks 1 PERMIT EXPIRES Monday, July 5, 2010 Permit Issued on Wednesday, January 6, 2010 hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws,rules and regulations of the Stat of Was ngton • and the City of Federal Way. Owner or agent: (4m:)1Date: =.91) I ilzito a THIS CARD IS TO MAIN ON-SITE ` CITY OF ��� GGt"� Construction I ection Record Federal Way INSPECTION REQU TS: (253)835-3050 PERMIT#: 10-100026-00-ME Address: 2623 SW 332ND ST Owner: MARVIN JOHNSON FEDERAL WAY, WA 98023-2836 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. El Mechanical Rough-in(4165) El Gas Piping(4125) ❑ Final-Mechanical(4065) Approved Approved to release test Approved By N Date t_1 1__1` By Date By 0...A1 ..0...A1 .. . Date v.....0...... . . El Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date