09-100857 Meeianial
City of Federal Way
4° .E •
Community Development Services 011Permit #: 09-100857-00-ME
P.O.Box 9718
Federal-260,WA 98063-9718835-
Ph:(253)835-2607 Fax (253)835-2609 x,' Ins ection Request Line: (253) 835-3050
p
Project Name: KAPICA
Project Address: 29806 5TH AVE SW Parcel Number: 233700 0090
Project Description: Replace 80K btu gas furnace
Owner Applicant Contractor
JOHN S KAPICA NAIDA KHAN WASHINGTON ENERGY SERVICES CO
16872 LYNN ST UNIT F NORTHWEST PERMIT INC (GENERAL)
HUNTINGTON BEACH CA 92649-3959 1345 GULF RD WASHIES971OB(9/2/09)
POINT ROBERTS WA 98281 2800 THORNDYKE AVE W
SEATTLE WA 98199
rmI
;VA. xs�;;.�:'�a'a' e..�.. �k�_..., �'� ..baa'?s,,.,..� � ,����.. .� ,.,,,,.,.�...�/�., z�,av'9,6_ u.....,* // :IP <.�'�•"':���,.d� �„ ohli,,<i;s�,��..
Mechanical Valuation 3878.26 Is this an Online or O.T.C.application? Yes
a .. ..,t 5, € 6 4, 'E,:.,Fws5. . ,,. f, =3§.`X:�,z sA s , .:u �3 .X: � .. , , ,r .„N,r,
Furnaces.. 1
PERMIT EXPIRES Wednesday, September 2, 2009
Permit Issued on Friday, March 6, 2009
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and a City of Federal Way. 420
Owner or agent: OM LI Mk Date:
+ f�
PINAt1h
THIS CARD IS T MAIN ON-SITE ,
CITY Federal Waykkli 4110Construction I ection Record
INSPECTION REQUE TS: (253)835-3050
PERMIT#: 09-100857-00-ME Address: 29806 5TH AVE SW
Owner: JOHN S KAPICA FEDERAL WAY, WA 98023-3516
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0 Mechanical Rough-in(4165) 0 Gas Piping(4125) 0 Final-Mechanical(4065)
Approved Approved to release test Approved
By Date By Date By G cc......3Date Z•22-
t to
.
El Rough Electrical1:1 Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date