Loading...
17-105254 rlt _ w Mechanical City FederalDevelopment F ' LE Permit #:17-105254-00-ME Community Development Dept. 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax(253)835-2609 Project Name: PATIN Project Address: 118 SW 312TH PL Parcel Number:555780 0190 Project Description: Replace Gas Furnace&Install Heat Pump • Owner Applicant Contractor DIRK P PATIN CYNDAL MILLHOLLINNORTHWEST PACIFIC AIR SYSTEMS(GENERAL) 118 SW 312TH PL PERMIT PACIFAS093KA(9/8/19) FEDERAL WAY WA 1345 W GULF RD 98023 POINT ROBERTS WA 98281 12811 PACIFIC HWY SW LAKEWOOD WA 98499 Additional Permit Information Mechanical Work Valuation? 14891.00. Is this an Online or O.T.C.application Yes Compressors/Heat Pumps 1 Furnaces I PERMIT EXPIRES Sunday,29 April,2018 Permit Issued on Tuesday,October 31,2017 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: ONI... INE Date: 4.14 THIS CARD IS TO REMAIN ON-SITE Federal 1Na Construction Inspection Record INSPECTION REQUESTS:(253)835-3050 PERMIT#: 17 105254 00 Address: 118 SW 312TH PL Project: DIRK P PATIN FEDERAL WAY WA 98023-4639 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. ❑ Mechanical Rough-in(4165) Gas Piping(4125) Q Final-Mechanical(4065) Approved Approved to release test Approved ,By Date ).BY Date .'_By C _,� Date t l .t..._, Rough Electrical 0 Final ElectricalElRight of Way ` Approved Approved Approved By Date By Date By Date