17-105254 rlt _ w
Mechanical
City FederalDevelopment
F ' LE Permit #:17-105254-00-ME
Community Development Dept.
33325 8th Ave S
Federal Way,WA 98003 Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax(253)835-2609
Project Name: PATIN
Project Address: 118 SW 312TH PL Parcel Number:555780 0190
Project Description: Replace Gas Furnace&Install Heat Pump
•
Owner Applicant Contractor
DIRK P PATIN CYNDAL MILLHOLLINNORTHWEST PACIFIC AIR SYSTEMS(GENERAL)
118 SW 312TH PL PERMIT PACIFAS093KA(9/8/19)
FEDERAL WAY WA 1345 W GULF RD
98023 POINT ROBERTS WA 98281 12811 PACIFIC HWY SW
LAKEWOOD WA 98499
Additional Permit Information
Mechanical Work Valuation? 14891.00. Is this an Online or O.T.C.application Yes
Compressors/Heat Pumps 1 Furnaces I
PERMIT EXPIRES Sunday,29 April,2018
Permit Issued on Tuesday,October 31,2017
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: ONI... INE Date:
4.14 THIS CARD IS TO REMAIN ON-SITE
Federal 1Na Construction Inspection Record
INSPECTION REQUESTS:(253)835-3050
PERMIT#: 17 105254 00 Address: 118 SW 312TH PL
Project: DIRK P PATIN FEDERAL WAY WA 98023-4639
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
❑ Mechanical Rough-in(4165) Gas Piping(4125) Q Final-Mechanical(4065)
Approved Approved to release test Approved
,By Date ).BY Date .'_By C _,� Date t l .t..._,
Rough Electrical 0 Final ElectricalElRight of Way `
Approved Approved Approved
By Date By Date By Date