Loading...
17-105307 Mechanical City of Federal Way Community DevelopmentDept . Permit #:17-105307-00-ME 333258th Ave S F 1 L E Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax(253)835-2609 Project Name: ARIZ Project Address: 28900 11TH PL S Parcel Number:720570 0120 Project Description: Replace existing air handler and heat pump Owner Applicant Contractor DAVID ARIZ JAIMIE HOWBRENNAN HEATING&A/C BRENNAN HEATING&A/C LLC 28900 11TH PL S 4601 S 134TH PL (GENERAL 01) FEDERAL WAY WA SEATTLE WA 98168 BRENNHA971R9(12/29/17) 98003 4601 S 134TH PL TUKWILA WA 98168 Additional Permit information Mechanical Work Valuation? 8350 Is this an Online or O.T.C.application? Yes Air Handling Units 1 Compressors/Heat Pumps 1 PERMIT EXPIRES Wednesday,2 May,2018 Permit Issued on Friday,November 3,2017 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws,rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: ® N L I r E Date: 11\1 THIS CARD IS TO REMAIN ON-SITE Ferwa Way Construction Inspection Record INSPECTION REQUESTS:(253)835-3050 PERMIT#: 17 105307 00 Address: 2890011TH PL S Project: DAVID ARIZ FEDERAL WAY WA 98003-3706 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 Mechanical Rough-in(4165) 0 Gas Piping(4125) I❑ Final-Mechanical(4065) ApproVed ` Approved to release test Approved •By Date i�By Date �,By V Date %t 11 1(r) Rough Electrical 0 Final Electrical Right of Way Approved Approved Approved By Date By Date By Date