Loading...
17-102858 Building - Commercial City of Federal Way Permit #:17-102858-00-CO Community Development Dept. 33325Ave S FederallWay,WA 98003 P G Inspection Request Line: (253) 835-3050 Ph:(253)835-2607 Fax (253)835-2609 Project Name: DECATUR SENIOR HIGH SCHOOL Project Address: 2800 SW 320TH ST Parcel Number: 122103 9034 Project Description: TI-Tenant improvement to include cutting and patching,interior wall framing,doors, suspended ceilings,finishes and casework.Plumbing and Mechanical included. , Owner Applicant Contractor Lender FEDERAL WAY PUBLIC SCHOOLS TODD KANYERFEDERAL WAY RELIANT GROUP INC OWNER IS LENDER 33330 8TH AVE S PUBLIC SCHOOLS 360 MIDLAND DR FEDERAL WAY WA 98003-5433 33330 8TH AVE S TUKWILA WA 98188 FEDERAL WAY WA 98003 Census Category: 437 - Commercial alt/add/conversion Includes: #1 #2 #3 #4 Occupancy Class: E Construction Type: Type II-A Occupancy Load: 74.00 Floor Area(sq.ft.) _ 1,613.00 Additional Permit Information Occupancy#1-Area(Sq.Feet) 1613 Occupancy#1-Construction Type Type II-A Mechanical to be Included? Yes Plumbing Work Valuation? 15000 Mechanical Work Valuation? 45000 Number of Stories I Is this an Online or O.T.C.application? No Permit for Building Shell Only? No Plumbing to be Included? Yes Occupancy#1-Use Elementary/JR/SR Schools Comprehensive Plan Designation SF-High-Density Zoning Designation RS 7.2 Residential Total Valuation: 126,000.00 * ;;33 *. �3' gar Mechanical Fixtures Air Handling Units 2 4. 1„, I* _' ... Plumbing Fixtures ,)e y. Sinks 3 PERMIT EXPIRES Sunday,4 February,2018 Permit Issued on Tuesday,August 8,2017 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: �,/ice Date: ‘g- 2 20 7 ip Vot4",C Pti/7C-19 • ` THIS CARD IS TO REMAIN ON-SITE CITY OF ' Construction Inspection Record Federal Way INSPECTION REQUESTS: (253)835-3050 PERMIT#: 17 102858 00 Address: 2800 SW 320TH ST Project: FEDERAL WAY PUBLIC SCHOOLS FEDERAL WAY WA 98023-2207 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. r 0 Initial Erosion Control(4365) ® Footings/Setback(4110) 0 Re-steel(4215) To be done PRIOR to breaking ground Approved to place concrete Approved to place concrete or grout By Date By Date By Date Q Plumbing Groundwork(4190) 0 Slab/Concrete Floor(4255) 0 Underfloor Framing(4285) Approved to cover Approved to place concrete Approved to sheath floor By C..\j k) Date %_% .s.%`-7 , By Date By Date ,Li Floor Sheathing(4105) r® Rough Plumbing(4230) ® Mechanical Rough-in(4165) Approved to install flooring Approved Approved By Date _By }t Date 1 P l i"� - Date GT_ ( _ I r Ea Gas Piping(4125) El Fire/Draft Stops(4095) ILI Interim Erosion Control(4370) Approved to release test Approved Approved By Date By Date By Date Prior to scheduling a Framing inspection; 0 Framing(4120) 14 Insulation(4150) Electrical,Plumbing&Mechanical Rough-in Approved to insulate Approved to install wallboard and Fire/Draft Stop inspections must be signed- off and approved. IBC 109.3.4 By Ari} Date `r 1 iii 1 By Date II Gypsum Wallboard Nailing(4130) 6 Suspgnded Ceiling Grid(4265) 17 Final-S KF&R(4060) Approved to install mud&tape Approved to drop tile Approved By Date 14241( ) By Date By Date • r r Final-Planning Final Erosion Control(4375) 0 III Final-Mechanical(4065) Approved Approved Approved By Date By Date By Date 1 Final-Plumbing(4075) rL Final-Building(4050) Approved Approved By CLi h;,,.. Date %-.....41,—E. El s By *-3" S Date 1 H i `7 r 111 Rough Electrical D Final Electrical111Right of Way Approved Approved Approved By Date By Date By Date Adll 4j4 NOY C. AABC SERVICES DECATUR HIGH SCHOOL FUNCTIONAL CORE PROGRAM IMPROVEMENTS 2$00 SW 320TH STREET FEDERAL WAY, WA FINAL TAB REPORT ARCHITECT: GREENE GASAWAY ARCHITECTS PO BOX 4158-FEDERAL WAY,WA 98063 MECHANICAL ENGINEER: BURMAN DESIGN 31620 23RD AVENUE SOUTH,SUITE 104-FEDERAL WAY,98003 MECHANICAL CONTRACTOR: NARROWS HEATING & AIR CONDITIONING, INC. 5121 BURLINGTON WAY-TACOMA,WA 98409 ervices PROJECT NO: 17-147 n'}aB�~ °cW TAC SERVICES,LLC M 1404 RIVERSIDE DR,SUITE L DATE: 9/15/2017 ; MOUNT VERNON,WA 98273 pe[4,oa-p2°��� PH: (360)255-5306 TECHNICIAN: CARLOS LUNA �4erf R.Coo`` FAX: (360)464-9973 ADMIN@TESTANDCX.COM 09/15/2017 Page 1 of 12 tae -- ;: 7 ,$ II. .. , ni, 5 5 �4 .. II,.II _ .[I.. _, ...„ _ II . ..ILL 17 IL, _:11„ii _-11..II 11.J11 fl 11,.11 .,,11„ _-11 11..II -. 11,.111 1 , ,,,r''''''::: AABC, .. .. ... National . ... . _ , H�� ,,,,,„.„. ' j .,::::::1.,,:.:',3 ,_:::;,,,::,,,,.;,,',,, . _ er ormance uarantPursuant to the agreement between ti ova TAC Services, LLC ;_.,„:„..„....1,,,,,7,.... , - AABC Certified Testing& Balancing Agency and Narrows Heating & Air Conditioning, Inc. Client 1hrJ All systems shall be tested and balanced in accordance with the project plans and specifications ,�fi and to the optimum performance capabilities of the equipment.Testing and balancing shall be done ...., ...„ K..„, in accordance with the standards published by the Associated Air Balance Council. _., ,..„ If the Agency listed above fails to comply with the specifications for any reason other than ::::...!1.<4*.;,, K.,..---,. termination of business by the AABC agency or equipment malfunction or inadequacy which prevents proper balancing of the systems, AABC will investigate and, if warranted, will provide (K,,;,-::__- supervisory personnel to assist the member Agency to perform work in accordance with AABC -- Standards.This supervision will be provided at no additional cost to the building owner. This Guaranty is valid for one year from the date of submission of a test and balance report, K provided the Agency is a current member of AABC,and may only be invoked in writing by the building owner, architect, or engineer of record. The Guaranty is limited to the terms and conditions as stated herein. .h. Decatur High School - Functional Core Program Improvements : ,,, Project Name xx `,� -' Address 2800 SW 320th Street ; ,�•°r r; Federal Way, WA by. '� Name of Engineer 4 Linda Burman ,' Burman Design Engineering Firm - Email Address linda@burman.design ': . Address 31620 23rd Avenue South, Suite 104 ''= Federal Way, WA 98003 W . 9/15/2017 AABC f ,,; Date Associated Air ' 'fi ` TBE# 08-02-04 Balance Council r. 1518 K Street,N.W. 1 Robert R. Coallier Washington,D.C.20005 f By 202-737-0202•Fax 202-638-4833 AABC Certified TBE info@aabc.com•www.aabc.com 1 11 11"11 1I it II 11II U II 11J II I1I ,11 n II f11 11 711 . Ir lII I! 11 11 11 II 111 (1 11 .,11 11� 11:11 11 111 I r i a. y '*8(0'.. ^ %r ; 4' �� l J/ ai fi �?W' a 'h �` a 4 L� 'vaf Ir '^1'�1 I +S .... rr 1 A ( e r 1 r, ti Ya a'>f' �,<„ yxt' ^ x f' ,� , ? xr '� t r ``{ G � 1 ''``;5‹ '`L ��'�+:. ..(r ‘r;:8,'''�i4`f'.,' fij�.�i; ti., , uJ' '�% 1 ' f 09/15/2017 Page 2 of 12 F£' e A Cot AABC S£R V ICES DESCRIPTION PAGE COVER PAGE 1 AABC NATIONAL PERFORMANCE GUARANTY 2 TABLE OF CONTENTS - 3 TEST INSTRUMENT CALIBRATION DATES 4 PROJECT SUMMARY 5 LEGEND SHEET 6-8 VAV-4 9 VAV-5 10 VAV-6 10 EF-1 TABLE OF CONTENTS 11 SCHEMATIC DIAGRAMS 12 09/15/2017 Page 3 of 12 4 11 YE <INERVICES AABC TEST INSTRUMENT CALIBRATION DATES INSTRUMENT MANUFACTURER MODEL NO. SERIAL NO. CALIBRATION DATE DIGITAL FLOW CAPTURE HOOD ALNOR EBT 731 EBT731726025 6/29/2017 DIGITAL THERMOMETER(AIR) ALNOR EBT 731 EBT731726025 6/29/2017 DIGITAL VEL GRID ALNOR EBT 731 EBT731726025 6/29/2017 DIGITAL MANOMETER(AIR) VANE ANEMOMETER ALNOR EBT 731 EBT731726025 6/29/2017 ALNOR RVA 801 A04085 2/02/2017 (NEW) AMMETER AC VOLT METER FLUKE 323 350060611WS 4/10/2017 (NEW) FLUKE 323 350060611WS 4/10/2017 (NEW) DC VOLT METER OHM METER FLUKE 323 350060611WS 4/10/2017(NEW) FLUKE 323 350060611WS 4/10/2017 (NEW) PHOTO TACHOMETER EXTECH RPM40 H346547 4/7/2017(NEW) CONTACT TACHOMETER EXTECH RPM40 H346547 4/7/2017(NEW) SOUND LEVEL CALIBRATOR PIPE CLAMP THERMOMETER REED SC 05 161126139 4/11/2017 (NEW) 1VJV1111 FLUKE 80PK 11 �c��n�o�/ 7/5/2017(NEW) VELOCICALC AIR VELOCITY METER ASI 9535 795351507019 6/21/2017 HYDRONIC MANOMETER ALNOR HM 670 70619712 6/20/2017 DIGITAL LOGGING THERMOMETER UEI DT304 151002442 7/5/2017(NEW) 09/15/2017 Page 4 of 12 • Nair aE: Nr,nNn C. AABC SERVICES PROJECT SUMMARY 1.0 THE ENVIRONMENTAL SYSTEMS WERE TESTED AND THE RESULTS ARE AS TABULATED ON THE ATTACHED DATA SHEETS 2.0 COMMENTS ON SPECIFIC EQUIPMENT IS INCLUDED UNDER REMARKS SECTION ON INDIVIDUAL DATA FORMS CONTAINED HEREIN. 3.0 VAV-4: •IDENTIFIER IS AN ASSUMPTION, SCHOOL DISTRICT NOT ABLE TO LOCATE VAV ON THEIR GRAPHICS. •SUPPLY REGISTER 1 FED FROM EXISTING VAV(NIC). TERMINAL UNIT CONFIRMED TO BE 100% OPEN; BALANCING DAMPER TO THIS BRANCH IS ALSO 100%OPEN AT TIME OF VERIFICATION. 4.0 VAV-5&6: *TERMINAL UNITS OBSERVED TO BE VVT TYPE(NO MEANS OF CALIBRATING AIRFLOW SENSORS).ALL TERMINAL UNITS FOUND TO BE PROGRAMED TO MODULATE BETWEEN 10%&100%BASED OFF OF LOAD DEMAND.PRIMARY AIR DAMPERS CONFIRMED TO BE 100%OPEN AT TIME OF VERIFICATION.ASSISTANCE FROM THE SCHOOL DISTRICT WAS PROVIDED;UNABLE TO LOCATE THE VAV'S ON THE GRAPHICS. 09/15/2017 Page 5 of 12 • VIE NG AMR Cx AABC SERVICES LEGEND SHEET AHU AIR HANDLING UNIT AC OR ACU ACCO AIR CONDITIONER UNIT AIR COOLED CONDENSING UNIT AD)P.D. AMP ADJUSTED PITCH DIAMETER AMPERE AVG AVERAGE B.H.P. C.D. CFM C.E. BRAKE HORSEPOWER CEILING DIFFUSER CUBIC FEET PER MINUTE CEILING EXHAUST CH CHWR CHILLER CHILLED WATER RETURN CHW OR CHWS CHILLED WATER SUPPLY C.R. CT CEILING RETURN COOLING TOWER CWR CONDENSER WATER RETURN CW OR CWS DB D.D. D.P. DIA DISP D.N.A. CONDENSER WATER SUPPLY DRY BULB DIRECT DRIVE DIFFERENCE,NET DECREASE OR INCREASE DIAMETER DISPLACEMENT DATA NOT AVAILABLE D.N.L EAT EDC EDH EF DATA NOT LISTED ENTERING AIR TEMPERATURE ELECTRIC DUCT COIL ELECTRIC DUCT HEALER EXHAUST FAN EMCS EWT FCU ENERGY MANAGEMENT CONTROL SYSTEM(5) ENTERING WATER TEMPERATURE FAN COIL UNIT FH FUME HOOD FG FLOOR GRILLE 09/15/2017 Page 6 of 12 41111111111 4 A Now TESTING Arm C..... AA BC SERVICES F.E. FLOOR EXHAUST OR RETURN F.L.A FULL LOAD AMPERAGE FPB FAN POWERED BOX FPM FEET PER MINUTE F.S. FLOOR SUPPLY F.S.R FLOOR SUPPLY REGISTER FT.HD FEET OF HEAD FTU FAN TERMINAL UNIT GPMGALLONS PER MINUTE GFH GAS FIRED HEATER HC HEATING COIL HEATER O.L. THERMAL OVERLOAD PROTECTION FOR MOTORS LOCATED AT THE MOTOR STARTER HEPA HIGH EFFICIENCY PARTICULATE AIR H.F. HEPA FILTER HOA HAND/OFF/AUTO SWITCH H.P. HORSEPOWER HPS HIGH PRESSURE STEAM HRC HEAT RECOVERY COIL OR HEAT RECLAIM COIL HVAC HEATING,VENTILATION AND AIR CONDITIONING HWR HOT WATER RETURN OR HEATING WATER RETURN HWS HOT WATER SUPPLY OR HEATING WATER SUPPLY HX HEAT EXCHANGER I.D. INSIDE DIAMETER LAT LEAVING AIR TEMPERATURE L.D. LINEAR SUPPLY DIFFUSER LPS LOW PRESSURE STEAM L.T. LIGHT TROFFER LWG LOW WALL GRILLE LWR LOW WALL RETURN LWT LEAVING WATER TEMPERATURE MAU/MUA MAKE UP AIR UNIT MBH 1,000 BTU'S PER HOUR N.A. NOT ACCESSIBLE N.I. NOT INSTALLED N.T. NOT TAKEN N.V.L NO VALID LOCATION N.Z. NOZZLE O.D. OUTSIDE DIAMETER OPEN NO TERMINAL DEVICE INSTALLED O.S.A.MIN OUTSIDE AIR MINIMUM OAT OUTSIDE AIR TEMPERATURE 09/15/2017 Page 7 of 12 . A _....... .....- INC am u. AABC SEf2WCC8 PF POWER FACTOR PHC PREHEAT COIL PHC PHASE(S) PMP CIRCULATING PUMP P.P PERFORATED PLATE PSI POUNDS PER SQUARE INCH P.T. PITOT TRAVERSE RA RETURN AIR RF RETURN AIR FAN R.G. RETURN GRILLE RHC REHEAT COIL RPM REVOLUTIONS PER MINUTE SA SUPPLY AIR SAT SUPPLY AIR TEMPERATURE S.D. SUPPLY DIFFUSER SEF SMOKE EXHAUST FAN SF(AIR) SUPPLY FAN S.F.(ELECT) SERVICE FACTORS SHC STEAM HEATING COIL S.P."W.C." STATIC PRESSURE RESISTANCE, MEASURED IN INCHES OF WATER COLUMN S.W.E. SIDEWALL EXHAUST S.W.R. SIDEWALL RETURN S.W.S. SIDEWALL SUPPLY TAB TESTING,ADJUSTING,AND BALANCING TSP TOTAL STATIC PRESSURE UH UNIT HEATER V VOLTS VAV VARIABLE AIR VOLUME VD VOLUME DAMPER VFD VARIABLE FREQUENCY DRIVE VP VELOCITY PRESSURE W WATTS WB WET BULB W.G. WATER GAUGE °F DEGREES FAHRENHEIT DP DIFFERENTIAL(DELTA)PRESSURE OR PRESSURE DROP DT DIFFERENTIAL(DELTA)TEMPERATURE, NET TEMPERATURE DECREASE OR INCREASE PSI POUNDS PER SQUARE INCH 09/15/2017 Page 8 of 12 • 414%1C-. IE STINT;ANTI CR AABC St.HVICI.S PROJECT: DECATUR HIGH SCHOOL LOCATION: FEDERAL WAY PROJECT NO: 17-147 CONTACT: CARLOS LUNA SYSTEM: EXISTING AHU NW AREA SERVED: VAV-4(PARTIAL SYSTEM) AREA SERVED NO. CODE SIZE AK DESIGN INWIAL 0/0 OF FINAL %OF FPM CFM FPM CFM DESIGN FPM CFM DESIGN EXISTING OFFICE 1 A 8" F.H. 190 104 55% 104 55% VAV-4 190 REMARKS: 104 55% 104 55% SUPPLY REGISTER 1 FED FROM EXISTING VAV(NIC).TERMINAL UNIT CONFIRMED TO BE 100%OPEN;BALANCING DAMPER TO THIS BRANCH IS ALSO 100%OPEN AT TIME OF VERIFICATION. VAV-4 IDENTIFIER IS AN ASSUMPTION,SCHOOL DISTRICT NOT ABLE TO LOCATE VAV ON THEIR GRAPHICS. FORM ID:LOW VELOCITY TEST SHEET 09/15/2017 Page 9 of 12 41111111. r Nior II STING. Atm t:.... AABC SLUVICLS PROJECT: DECATUR HIGH SCHOOL LOCATION: FEDERAL WAY PROJECT NO: 17-147 CONTACT: CARLOS LUNA SYSTEM: EXISTING AHU AREA SERVED: VAV-5/VAV-6 TERMINAL UNIT DATA TERMINAL UNIT ID: EXISTING VAV-5 AREA SERVED: CONF RM, KITCHEN MANUFACTURER: ENVIRO-TEC MODEL NUMBER: BI-EH SIZE/ K FACTOR: 8" / 0.20 CORRECTION FACTOR: NOT APPLICABLE MAXIMUM CFM DESIGN: 400 MAXIMUM CFM ACTUAL: 327 MINIMUM CFM DESIGN: EXISTING MINIMUM CFM ACTUAL: 10%DDC STROKE POSITION AREA SERVED NO. CODE SIZE AK DESIGN INITIAL %OF FINAL %OF FPM CFM FPM CFM DESIGN FPM CFM DESIGN CONF RM 102 1 A 8" F.H. - 170 - 50 29% - 145 85% KITCHEN 105 2 A 10" F.H. - 230 - 280 122% - 182 79% VAV-5 400 330 83% 327 82% TERMINAL UNIT DATA TERMINAL UNIT ID: EXISTING VAV-6 AREA SERVED: IDF,CLASSROOMS 101, 103 MANUFACTURER: ENVIRO-TEC MODEL NUMBER: BI-EH SIZE/ K FACTOR: 10" / 0.55 CORRECTION FACTOR: NOT APPLICABLE MAXIMUM CFM DESIGN: 1130 MAXIMUM CFM ACTUAL: 816 MINIMUM CFM DESIGN: EXISTING MINIMUM CFM ACTUAL: 10%DDC STROKE POSITION DESIGN INITIAL %OF FINAL %OF AREA SERVED NO. CODE SIZE AK FPM CFM FPM CFM DESIGN FPM CFM DESIGN CLASSROOM 101 1 A 8' F.H. - 190 - 50 26% - 147 77% IDF ROOM 104 2 A 6" F.H. - 100 - 35 35% - 72 72% CLASSROOM 103 3 A 10" F.H. - 230 - 200 87% - 153 67% CLASSROOM 103 4 A 10" F.H. - 230 - 240 104% - 158 69% CLASSROOM 101 5 A 8" F.H. - 190 - 177 93% - 140 74% CLASSROOM 101 6 A 8" F.H. - 190 - 220 116% - 146 77% VAV-6 1130 922 82% 816 72% REMARKS: EXISTING VAV-5&6:TERMINAL UNITS OBSERVED TO BE VVT TYPE(NO MEANS OF CALIBRATING AIRFLOW SENSORS).ALL TERMINAL UNITS FOUND TO BE PROGRAMED TO MODULATE BETWEEN 100/0&100%BASED OFF OF LOAD DEMAND.PRIMARY AIR DAMPERS CONFIRMED TO BE 100%OPEN AT TIME OF VERIFICATION.ASSISTANCE FROM THE SCHOOL DISTRICT WAS PROVIDED; UNABLE TO LOCATE THE VAV'S ON THE GRAPHICS. FORM ID:LOW VELOCITY TEST SHEET 09/15/2017 Page 10 of 12 NG Alai C. AABC rrrvIcL51 PROJECT: DECATUR HIGH SCHOOL LOCATION: FEDERAL WAY PROJECT NO: 17-147 CONTACT: CARLOS LUNA UNIT DATA UNIT ID EF-1 EQUIP.LOCATION ROOF -_ AREA SERVED KITCHEN 105 MANUFACTURER GREENHECK -_ MODEL# G-085-DGEX-QD SERIAL# 15044054 FAN DATA DESIGN CFM 300 ACTUAL CFM 301 T.S.P."W.C. 0.38 DESIGN FAN RPM 1430 -- -_ TESTED FAN RPM MED-HIGH MOTOR DATA MANUFACTURER McMILLAN HORSE POWER 1/20 VOLTS 115 AMPS 1.2 SERVICE FACTOR 1.00 MOTOR RPM 1550 SPEED VARIABLE FRAME NOT LISTED PHASE/ HZ 1/60 HEATER SIZE THERMAL RHEOSTAT SETTING MED-HI DESIGN INITIAL %OF FINAL %OF AREA SERVED NO. CODE SIZE AK FPM CFM FPM CFM DESIGN FPM CFM DESIGN KITCHEN 105 1 EG 22"X22" F.H. - 300 389 130% - 301 100% EF-1 _---- 300 389 130% 301 100% REMARKS: FORM:DIRECT DRIVE TEST DATA 09/15/2017 Page 11 of 12 (�nn114�..// 4�/, �../ \I41 SLN3Wf1000 018 JIVV1� �V/\N �V��p Vd f13rA AvmiVMNG 854 4X8Od a`j W (74‘', Ja'o 101211510 S100HJS OI190d AVM 1Vd3033 Q ...Z 100HOS HOIH 8flld03o lb' Arm>;s>? a�auaaM SIN31N3A021dW1 INb21001d 32100 1VNO110Nfld i W o 2'5 1 16* PR gtN z 9� tia � w gra @p I O¢._ Z . , 0 00000 0 0 --- — N i I -€ ,. . g '1' ; 1711 ., ._,..., P _ b Sp Po O o-it O * 0 o i. .. b� 5b CJ °fig C7 CD 17-1 .igE E E E C..). 51g o W F- U O W a. m J Q W U 1 Q U Q J T Q F— _Q d Q a.CD• 0 09/15/2017 Page 12 of 12 1111111 C...",1 N O " O t D � `� -z wr- c�� N 5,o Pr 9 m C7 Abl - 1 ..'.,—.::.7 1 D I. Vit P.'. d/ a -��; 0 mE A° 14 Agg gm Z s H e'4 1'It r— z O 'rrl .0 �• II I; i N Vt ; �' MINIMINIIIIINIMININIi \y o f a. AIL , . lur ,11R 11 I'' j ) 1 g 1 ;1 cn a 3-, Csl N N .� N) N) �ti z� Z4 5 f -� 0, wD Nz 15 � ° z ix - • •1 /4. TS 2-,,,,,, ile.;, _ _,( -.r, \ .... 3 i r i t I! 1 (t,.. k. ( ----„.<1,I - ,..,,,, ,:. ,..., . Am _ tl )., u., 1.4 3 /2—_� -,(E)ROOF SYSTEM It.AA..on ,,.2` II•A4.ao 4 —SAB EXTEND 4'-0' IN BOTH DIRECTIONS V- A BEYOND WALL BELOW , 7/ 4...s. S b4. :�Et— a I, -,i-u4,I ell WALL TYPE � _�,� PER PLAN ri,(4c' " f : 21—A4.00 I-i i' I WALL TYPE S02 1 - .' ' 1, 1 WALL CT �S �� 2 O SCALE 3/4" =SE" olt\i'l' greenegasawa}T b - i - =rG4-}11'0L GREENE GASAWAY ARCHITECTS PO BOX 4158 FEDERAL WAY, WA. 98063 14,1411,,. Oltikje, ASK- I TEL;253-9414997 FAX.258-941-5122 RECE VE1.., T.rr t PERMIT APPLICATION CITY t3F Federal Way PERMIT CENTER+33325 8th Avenue South+Federal Way,WA 98003-6325 ��� CITY OF FEDERAL WAY 253-835-2607 +FAX 253-835-2609+permitcentedacityoffederalway.com COMMUNITY DEVELOPMENT PERMIT NUMBER l _ S !J _ N 1 / ` TARGET DATE 1 �bE4amJ ti-t t/per Scabyt,. SITE ADDRESS ZCO 4/.0 qtr t D'44-i I.1T+s'f C►er SUITE/UNIT 4 D' 'l PROJECT VALUATION ZONING ASSESSOR'S TAX/PARCEL* $ 06 oe.) W-01 r'2. I '2. S. 1 0 - TYPE OF PERMIT BUILDING VPLumsiNG )(MECHANICAL ❑ DEMOLITION ❑ ENGINEERING ❑ FIRE PREVENTION NAME OF PROJECT FVC td t►�.t. Gbita p�P124760#04.4- #T' �0C J tt,R 1t 1—'EV} 1 Woro, Vor Nat 14)4i reP ')P 7: T. �t9 /' PROJECT DESCRIPTION ,, Detailed description of work to A4.30 PAATGI +�k)IP il►.>T wl4w PR-�4tilt N`, dOEs�fP4 be included on this permit only ti 0 yP a k oeft, c� uG s, runt. + ol..u, FW froE 3, c.,lal5euwx l-1t4L a&f2- abAr1g-4/�i t TkirC40+a #p a4 NAME T bP P PRIMARYPHONE PROPERTY OWNER FeO �'V w*t po7/Lw bb� s51.14-1. 7 .1*1, 4131 MAILINGE-MAIL ,330 ADDRESS f 7e6r4 +14.9,Puiav Q 4.0104r CITY W LOA A 2IP FE I NAME ,,,'�.�yy��) PHONE MAILING ADDRESS E-MAIL CONTRACTOR CITY STATE ZIP FAX WA STATE CONTRACTOR'S LICENSE tl EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE NAME TPDP -14,4141q6112- PRIMARY PHONE rev P - comm eucr1 tc, oaf 2Sv• 945 510-1 APPLICANT MAILING ADDRESSf f v ,J i /_-.�(!{'1{' 4-E-MAILL CITY 7 a AAUGSTATE ZIP #'.� leirCm 3 .6 1,on X FebE t (4.9f WA' °Itk4 NAME Te'10% WV WW1 PRIMARY( PHONE «� PROJECT CONTACT 60 j Q Gil/ LLJ N4 V0,%41.4'4 1 (The individual to receive and MAILING AD RESS C E-MAIL respond to all correspondence d` �e 1 ✓ 4vityelY't+4$t tvsal10.t concerning this application) CITY STATE ZIP FAX F PRA4- Wittut W A 9$ NAME PROJECT FINANCING X OWNER-FINANCED When value is$5,000 or more MAILING ADDRESS,CITY,STATE,ZIP PHONE (RCW 19.27.095) I certify under penalty of perjury that I am the property owner or authorized agent of the property owner.I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct.I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to arty claim(including costs,expenses,and attorneys'fees incurred in the investigation and defense of such claim), which may be made by any person,including the undersigned,and filed against the city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information supplied to the city as a part of this application. SIGNATURE: DATE . //// //////1> PRINT NAME• / 9' Bulletin#100-January 29,2016 Page 1 of 2 k:AHandouts\Permit Application 11_3 ' ► R - VALUE OF MECHANICAL WORK MECHANICAL PERMIT $ +61000 Indicate how many of each type offacture to be installed or relocated as part of this project.Do not include existing fixtures to remain. 20.. AIR HANDLING UNITS FANS GAS PIPE OUTLETS OTHER(Describe) AIR CONDITIONER FIREPLACE INSERTS HOODS(commercial) BOILERS FURNACES HOT WATER TANKS(Gm) COMPRESSORS GAS LOG SETS REFRIGERATION SYST DUCTING GAS PIPING WOODSTOVES VALUE OF PLUMBING WORK PLUMBING PERMIT I 01504"' Indicate how many of each type of fixture to be installed or relocated as part of this project.Do not include existing fixtures to remain. BATHTUBS or Tub/Shower Combo) LAVS)Hand Sinks) TOILETS WATER PIPING DISHWASHERS RAINWATER SYSTEMS URINALS OTHER(Describe) DRAINS may, SHOWERS VACUUM BREAKERS DRINKING FOUNTAINS 7 SINKS Kitchen/Utility) WATER HEATERS(Elea o) HOSE BIBBS SUMPS WASHING MACHINES TOTAL FIXTURES GENERAL INFORMATION CRITICAL AREAS ON PROPERTY? WATER PURVEYOR SEWER PURVEYOR VALUE OF EXISTING IMPROVEMENTS a�lA 1,6.KattAttef4 I„p.1 ktPtu eg► EXISTING/PREVIOUS USE LOT SIZE(In Square Feet) EXISTING FIRE SPRINKLER SYSTEM? PROPOSED FIRE SUPPRESSION SYSTEM? 1,0e151,0 1,(P 3I 531 5p )(Yes L) No i i Yes No RESIDENTIAL - NEW OR ADDITION AREA DESCRIPTION(in square feet) EXISTING PROPOSED TOTAL FOR OFFICE USE BASEMENT FIRST FLOOR(or Mobile Home) SECOND FLOOR COVERED ENTRY DECK GARAGE 0 CARPORT 0 OTHER(describe) EXISTING PROPOSED TOTAL Area Totals **NEW HOMES ONLY** ESTIMATED SELLING PRICE$ # OF BEDROOMS COMMERCIAL—NEW/ADDITION AREA DESCRIPTION Area in Occupancy Group(s) Construction # of Additional Information Square FeetType Stories NEW BUILDING ADDITION COMMERCIAL—REMODEL/TENANT IMPROVEMENTS AREA DESCRIPTION Area in Occupancy Group(s) Construction # of Additional Information Square F� } e�eType Feet Stories TOTAL BUILDING 1()i��rYT___ 11{'1 5�S(�(„AT10' 2A1 ^'► TENANT AREA ONLY �- YYYY PROJECT AREA ONLY 1 1 40 I "a5. LA [ a--. Bulletin#100—January 29,2016 Page 2 of 2 k:\Handouts\Permit Application STRUCTURAL CALCULATIONS FOR DECATUR HIGH SCHOOL FUNCTIONAL CORE PROGRAM IMPROVEMENTS EXHAUST FAN INSTALLTION AT KITCHEN ROOF 2800 SW 320TH STREET FEDERAL WAY, WASHINGTON ` I � ��'# or�3ri1 14*-1 - . f kj/ "1,,,l'O p -4=: '4100' tit,,,, 4;.,,,,_ / ,, sioNAL � � /o-oS-Eate JULY, 2017 Ftwc7WAI-z_ -caP& PRoPMf1 projectvfPROU6M&JM m arANR 11101,M greenegasaway Sheet / of / Architecture • Plan ; Management Name 0-6' Date ----/ — 0. - 4D . ,.--, ///- t j 7t9i 2 1 s '-.:41--- A) ce,7•<- WIKI:f . as_ iomor) 4.0* z:w 'VPC- 1'5 'Zi 62,...',P--/.4,,ig,e 1, ---i----/ 4 t ._ -,=-- cgx /1, -.-00----- x_s_,_ e,/9,>- , /g7, - Cbz72---=---- a.) / x"---...J ic f2-0,- i ,,,/ 4. ,, /0, 4 tc„v ror-ff-'244r5-4,-...7- AV '' 'essisamls ' 0-=•-• (1/(1- 5.---wp -i 8e R4 /4.) 241, —5764-----44A- 5 296.9x( 3 901" --,1/ 1- ,,,"„ t/ C2---) a),0,,,,t/.57 . 5K- ,9; P.O. BOX 4158 FEDERAL WAY,WA 98063 Tel 253-941-4937 Fax 253-941-5122 Building Division CITY OF 33325 8th Ave.S. Federal Way SPECIAL INSPECTION & Federal Way, WA 98003 TESTING AGREEMENT Phone: (253)835-2633 Fax: (253)835-2609 • (All references are per the 2015 International Building Code) ' Project Name: 1; fl UNt' btAL, C P-2 Al2.04 MVA ittPrzzuer�EI.-kers h1 DeCJ4T[J/� Lf l 4121.Project Address: 'Z O SW `3�10�.�. sT1UJpy Building Permit Number: 11. 102‘95,6 ''OO© -00 GO Date Issued: BEFORE A PERMIT CAN BE ISSUED:The registered design professional in responsible charge shall fill out the Agreement and include the name of each inspector as well as their appropriate license/certification number as required by the 2015 IBC. Two(2)copies of this form are to be submitted to the City prior to the issuance of a building permit. If changes are made as to who will perform the special inspections a new form shall be submitted and turned into the Building Permits & Inspections Division for approval. STATEMENT OF SPECIAL INSPECTIONS: In addition to this Agreement, a "Statement of Special Inspections" shall be provided per IBC 1704.3. This Statement shall be made as part of the approved plans, and be placed in a conspicuous location,such as the first page of the construction plans or the first page of the structural sheets. SPECIAL INSPECTORS: All special inspectors shall be approved by the Building Department prior to performing any duties. The special inspector shall provide proof of certification as a special inspector for each inspection item and be licensed by the State of Washington State. SPECIAL INPSECTION REPORTS: Special inspection reports are to meet the requirements of IBC 1704.2.4. Copies of each report are to be sent to the address listed in the letterhead noting the Project Address and Permit Number. A final report shall be submitted stating that all special inspection and structural testing items were completed and are in conformance with the approved design drawings and specifications. Items not in conformance, unresolved items, or any discrepancies in inspection coverage (i.e. missing inspections, periodic inspections when continuous was required, etc.) shall be specifically itemized in the final report. GENERAL SPECIAL INSPECTION ITEMS(per IBC Chapter 17) [Only checked items are required] Areas requiring special inspection: Name of Agency: Name of Inspector: License/Cert.No. ❑ Unapproved Fabricators(IBC 1704.2.5) Other than Structural Steel (IBC Table 1705.2.2) ❑ Steel floor&roof decks ❑ Welding of reinforcement O Cold-formed steel Structural Steel Welding(Per N5.4 of AISC 360 10) IA J44 eco TeV i'1 J'wl K"Ay LA-A00 Oty, ❑ Details(Per N5.7 of AISC 360-10) EutocN 41 010 ❑ High-strength bolts(Per N5.6 of AISC 360-10) Concrete Construction(per IBC Table 1705.3) A �� J LOAPjO k)O- Reinforcement,embeds,anchors O Formwork E'NeVi06,00 '51 ©10 + ❑ Materials ❑ Shotcrete ❑ Post-tensioned/Pre-stressed Concrete URL: www.cityoffederalway.com Page 1 of 3 Building Division CITY OF 33325 8th Ave.S. Federal Way SPECIAL INSPECTION & Federal Way,WA 98003 TESTING AGREEMENT Phone: (253)835-2633 Fax: (253)835-2609 • ❑ Erection of precast concrete GENERAL SPECIAL INSPECTION ITEMS(per IBC Chapter 17)-continued [Only checked items are required] Areas requiring special inspection: Name of Agency: Name of Inspector: License/Cert.No. Masonry Construction (IBC 1705.4) ❑ Prior to Construction(Article 1.15,TMS-602) ❑ As Construction Begins(Article 1.19.2,TMS-402) ❑ Prior to Grouting(Table 1.19.2,TMS-402) ❑ During Construction(Per TMS-402&TMS-602) Wood Construction ❑ High-Load Diaphragms(IBC 1705.5.1) Cl Wood Trusses>60ft(IBC 1705.5.2) ❑ Soils(IBC Table 1705.6) ❑ Driven Deep Foundations(IBC Table 1705.7) Cl Cast-in-place Deep Foundations(IBC Table 1705.8) ❑ Helical Pile Foundations(IBC 1705.9) ❑ Sprayed Fire-Resistant Materials(IBC 1705.13) ❑ Mastic&Intumescent Coatings(IBC 1705.14) ❑ EIFS(IBC 1705.15) ❑ Fire-Resistant Penetrations(IBC 1705.16) ❑ Smoke Control(IBC 1705.17) ❑ Other (IBC 1705.1.1) ❑ Other (IBC 1705.1.1) SPECIAL INSPECTIONS FOR SEISMIC RESISTANCE(IBC Section 1705.11) [Only checked items are required] Areas requiring special inspection: Name of Agency: Name of Inspector: License/Cert.No. ❑ Structural Steel (IBC 1705.11.1&AISC 341-10) ❑ Structural Wood (IBC 1705.11.2) ❑ Cold-formed Steel (IBC 1705.11.3) ❑ Mechanical&Electrical Components(1705.11.4) ❑ Architectural Components(IBC 1705.11.5) URL: www.cityoffederalway.com Page 2 of 3 ,. t. Building Division 1 ' CITY OF `*•ere" 33325 8'Ave.S. Federal Way SPECIAL INSPECTION & Federal Way,WA 98003 Phone: (253)835-2633 TESTING AGREEMENT Fax: (253)835-2609 • ❑ Storage Racks(IBC 1705.11.7) Declaration by Architect/Engineer I, the design professional in responsible charge for this project, declare that the ,�,�3 above listed special inspection and structural testing items are required for this ' ' r l T���'l projec a Gorda wi BC Chapter 17. A ', r T 772.77i7CA��n�1E4l� e WAY Sig afore Date STRIE OF WF,SNNGTO EAj Declaration by Owner I, the Owner of the project, declare that the above listed firm(s) or individual(s) are hired by me to perform special inspections and structural testing for the project pursuant to IBC 1704.2. __ _.MOW ." 21 Signature Date CONTRACTOR RESPONSIBILITY: Each contractor involved with the construction of wind or seismic force-resisting systems shall comply with the requirements of IBC 1704.4, The contractor is responsible for providing the special inspector access to approved plans and contract documents at the job site. All special inspection records shall be retained at the job site by the contractor and shall be made available to the Building Department upon request. Declaration by General Contractor I, the General Contractor of the project, agree to comply with the "Contractor Responsibility" items noted above. 7- 2-5 17 Signature Date URL: www.cityoffederalway.com Page 3 of 3