Loading...
13-104205 City of Federal Way • • Electrical Community&Econ.Dev.Services 33325 8th Ave SFILE Permit #: 13-104205-00-EL Federal Way,WA 98003 Ph:(253)835-2607 Fax:(253)835-2609 Inspection Request Line: (253)835-3050 Project Name: KENNISH Project Address: 34722 4TH PL S Parcel Number: 276230 0010 Project Description: Panel change out Owner Applicant Contractor MICHAEL KENNISH SUSAN DUNHAM BLACK HILLS INC(ELECTRICAL) 34722 4TH PL S BLACK HILLS INC BLACKHI919DL(3/15/15) FEDERAL WAY WA 98003-6730 1002 SE 85TH AVE AVE 1003 85TH AVE SE SUITE A OLYMPIA WA 98501 OLYMPIA WA 98501-5706 Additional Permit Information Is this an Online or O.T.C.application? Yes Is Use Educational or Institutional? No Electrical Fixtures Alt.Serv./Feeder:0 to 200 amps(F 1 Circuits-Residential 1 Thermostat 1 PERMIT EXPIRES Sunday, March 23, 2014 Permit Issued on Tuesday, September 24, 2013 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: tiI1 1 E Date: THIS CARD IS TO IN ON-SITE CITY OF Construction In ection Record Federal Way INSPECTION REQUE TS: (253)835-3050 PERMIT#: 13-104205-00-EL Address: 34722 4TH PL S Project: MICHAEL KENNISH FEDERAL WAY, WA 98003-6730 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 UFER Ground (4295) 0 Ditch cover(4030) 0 Slab/Concrete Floor(4255) Approved Approved Approved to place concrete By Date By Date By Date El Pool Bonding(4195) 'El Temporary Power(4275) 0 Service(4235) Approved Approved Approved By Date By Date By Date ,0 Feeders/Sub-panels(4045) El Rough Electrical(4225) El Ceiling Cover(4020) Approved Approved Approved By Date By Date By Date , 0 Final-Electrical(4055) Approved By �� Date X b_L— 17? El Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date