Loading...
15-105673 1110 Electrical City of Federal Way .{{.►►, Community&Econ.Dev.Services Permit #: 15-105673-00-EL 33325 8th Ave S Federal Way,WA 98003 FILE Inspection Request Line: 2 Ph:(253)835-2607 Fax (253)835-2609 p q ( 53)835-3050 Project Name: LAKE EASTER ESTATES CONDOMINIUM BLDG 7 UNIT 26 Project Address: 30805 13TH PL S Unit 26 Parcel Number: 401540 0260 Project Description: Change out Receptacles and switches in 44 condo units.Job 1159194. Owner Applicant Contractor EUGENIUSZ ZYDEK JEREMY STEEB PRIME ELECTRIC INC DANUTA ZYDEK PRIME ELECTRIC INC PRIMEEI134BT(1/30/17) 30805 14TH AVE S UNIT 26 13301 SE 26TH ST 13301 SE 26TH ST FEDERAL WAY WA 98003-4700 BELLEVUE WA 98005 BELLEVUE WA 98005 Additional Permit Information Is this an Online or O.T.C.application Yes Is Use Educational or Institutional? No Electrical Fixtures Circuits-Residential 12 PERMIT EXPIRES Wednesday, May 11, 2016 Permit Issued on Friday, November 13, 2015 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and th- 'ty .f ---ral Way. Owner or agent: ,16. Date: THIS CARD IS TO 'MAIN ON-SITE ' CITY OF Ctnstiruction In ection Record Federal Way INSPECTION REQUE TS: (253)835-3050 PERMIT#: 15-105673-00-EL Address: 30805 13TH PL S Unit 26 Project: EUGENIUSZ ZYDEK FEDERAL WAY, WA 98003-4700 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. El UFER Ground (4295) El Ditch cover(4030) '0 Slab/Concrete Floor(4255) Approved Approved Approved to place concrete By Date By Date By Date o Pool Bonding(4195) ❑ Temporary Power(4275) El Service(4235) Approved Approved Approved By Date By Date By Date O Feeders/Sub-panels(4045) ❑ Rough Electrical(4225) 0 Ceiling Cover(4020) Approved Approved Approved By Date By Date By Date • o Final-Electrical(4055) Approved By Date t 2--'3�-‘S El Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date k, . . -