Loading...
11-102526 • Electrical City of Federal Way • Community Development Services FILE Permit #: 11-102526-00-EL P.O.Box 9718 Federal Way,WA 98063-9718 Inspection Request Ph:(253)835-2607 Fax:(253)835-2609 Line: (253)835-3050 Project Name: FEDERAL WAY PUBLIC ACADEMY 8->3(e Project Address: 34620 9TH AVE S Parcel Number: 926480 0050 Project Description: Adding/altering(1)circuit for wiring for AC rooftop unit • Owner Applicant Contractor , EQUILON ENTERPRISES LLC MICHELLE TOTH HERMANSON COMPANY LLP(GENERAL) P O BOX 4369 PK ELECTRIC HERMACLOO5BJ(8/25/12) HOUSTON TX 77210 7834 SE 32ND ST AVE 1221 2ND AVE N MERCER ISLAND WA 98040 KENT WA 98032 Is Use Educational or Institutional? Yes Service greater than 999 Amps? No 3 a •� �� ,, A•,, to , ;.,6'.,.."54,:, a ,a. „ nz,?„+,'a i ,n i , 'z..,.,..,x.,.. .. '.�C Circuits-Commercial 1 PERMIT EXPIRES Tuesday, June 26, 2012 Permit Issued on Monday,June 27, 2011 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington arid the Ci of Federal Way. �' Owner or agent: Date: �'' ‘ (Sili.E°..° f‘t. . 1. 7 4. « THIS CARD IS T MAIN ON-SITE CITY°F Construction I ection Record ' ' w Federal Way INSPECTION REQUE TS: (253)835-3050 PERMIT#: 11-102526-00-EL Address: 34620 9TH AVE S Project: EQUILON ENTERPRISES LLC FEDERAL WAY, WA 98003-6731 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. El UFER Ground (4295) 0 Ditch cover(4030) El Slab/Concrete Floor(4255) Approved Approved Approved to place concrete By Date By Date By Date El Pool Bonding(4195) D Temporary Power(4275) 0 Service(4235) Approved Approved Approved By Date By Date By Date ❑ Feeders/Sub-panels(4045) ❑ Rough Electrical(4225) El Ceiling Cover(4020) Approved Approved Approved By Date By Date By Date 0 Final-Electrical(4055) • Approved B6(-7 Date? —/ 4- ( I . ALE 0 Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date