Loading...
13-101540 's c Plumbing City of Federal Way Community&Econ.Dev.Services 33325 8th Ave S FILE Permit #: 13-101540-00-PL Federal Way,WA 98003 Ph:(253)835-2607 Fax:(253)835-2609 Inspection Request Line: (253)835-30550 Project Name: REDONDO VISTA CONDOMINIUMS Project Address: 28606 16TH AVE S Unit 201 Parcel Number: 720581 0210 Project Description: REMOVE AND REPLACE ELECTRIC WATER HEATER Owner Applicant Contractor DANIEL P MITCHELL JESSICA VARON FAST WATER HEATER CO(GENERAL) 28606 16TH AVE S#201 FAST WATER HEATER COMPANY FASTWWH948BC(1/4/14) FEDERAL WAY,WA 98003 12601 132ND AVE NE 12601 132ND AVE NE KIRKLAND WA 98034 KIRKLAND WA 98034 • PlumbingIFtxtures Water Heaters 1 PERMIT EXPIRES Saturday, October 5, 2013 Permit Issued on Monday,April 8, 2013 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the Ci of Federal Way. Owner or agent: 0111..I E Date: „ ?//i/9 THIS CARD IS TO ON-SITE '�� • CITY of Construction In ection Record Federal Way INSPECTION REQ TS:(253)835-3050 PERMIT#: 13-101540-00-PL Address: 28606 16TH AVE S Unit 201 Project: DANIEL P MITCHELL FEDERAL WAY, WA 98003-6114 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. ❑ Plumbing Groundwork(4190) 0 Rough Plumbing(4230) 0 Gas Piping(4125) Approved to cover Approved Approved to release test By Date By Date By Date ❑ Final-Plumbing(4075) Approved By Qs , Date -1I,,_v?, El Rough Electrical Final Electrical El Right of Way Approved Approved Approved By Date By Date By Date