11-103497 3
Electrical
City of Federal Way •
,/,.�
Community Development Services Permit #: 11 -103497-00-E L
P.O.Box 9718
Federal Way,WA 98063-9718
Ph:(253)835-2607 Fax:(253)835-2609 r I Inspection Request Line: (2
53)835-3050
Project Name: NINTH AVE CENTER $it*/
Project Address: 34016 9TH AVE S Unit D-5 Parcel Number: 96480 0110
Project Description: Adding/altering(3)circuits for lighting retrofit
Owner Applicant Contractor
CAMPUS BUSINESS PARK ROBERT SEMINGSEN ILLUMINATE CONTRACTING LLC
1019 PACIFIC AVE#1119 ILLUMINATE CONTRACTING LLC ILLUMCL900B2(1/26/12)
TACOMA WA 34664 10TH PL SW 34664 10TH PL SW
98402-4468 FEDERAL WAY WA 98023 FEDERAL WAY WA 98023
Is Use Educational or Institutional? No Service greater than 999 Amps? No
' � _ �.. _ � It'%A,
A •
tC➢ .'> �
Circuits-Commercial 3
PERMIT EXPIRES Tuesday, August 28, 2012
Permit Issued on Monday, August 29, 2011.
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
ON an tze Ci f Federal Way.
Owner or agent: JI# Date: -c/eq41
THIS CARD IS TO EMAIN ON-SITE .
CITY OF Construction I ection Record
Federal Way INSPECTION REQUE TS: (253) 835-3050
PERMIT#: 11-103497-00-EL Address: 34016 9TH AVE S Unit D-5
Project: CAMPUS BUSINESS PARK FEDERAL WAY, WA 98003
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
O UFER Ground (4295) 0 Ditch cover(4030) 0 Slab/Concrete Floor(4255)
Approved Approved Approved to place concrete
By Date By Date By Date
El Pool Bonding(4195) El Temporary Power(4275) ❑ Service(4235)
Approved Approved Approved
By Date By Date By Date
o Feeders/Sub-panels(4045) El Rough Electrical(4225) ❑ Ceiling Cover(4020)
Approved Approved Approved
By Date By Date By Date
El Final-Electrical (4055)
Approved
Date ` (// '
0 Rough Electrical Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date