Loading...
12-104973 • City of FederalWay •Bulding - Community Econ.& D • Commercial Dev.Services Permit #: 1 2-104973-00-CO 33325 8th Ave S Federal Way,WA 96003 Inspection Request Line: (253)835-3050 Ph (253)835-2607 Fax:(253)835-2609 Project Name: TIME OUT ALE HOUSE Project Address: 34525 16TH AVE S Parcel Number: 889700 0060 Project Description: ADD-Construction of a new 222 sqft kitchen addition and non-bearing interior partions. Plumbing included • Owner Applicant Contractor Lender RMMLG PROPERTIES L L C WOODMAN CONSTRUCTION INC WOODMAN CONSTRUCTION INC RMMLG PROPERTIES L L C 34525 16TH AVE S 3 LAKE BELLEVUE DR SUITE 201 WOODMCI167O6(1/5/13) 34525 16TH AVE S FEDERAL WAY,WA 98003 BELLEVUE WA 98005 3 LAKE BELLEVUE DR SUITE 201 FEDERAL WAY,WA 98003 BELLEVUE WA 98005 Census Category: 437 -Commercial alt/add/conversion Includes: #1 #2 #3 #4 Occupancy Class: A-2 Construction Type: Type V-B Occupancy Load Floor Area(sq.ft.) 548 0 0 0 Additional Permit Information New/Additional Sq.Feet-1st Floor 0 Existing Sprinkler System in Building? No Mechanical to be Included? No Number of Stories. 2 Permit for Building Shell Only? No Plumbing to be Included Yes New/Additional Sq.Feet-Total 0 Occupancy#1-Use Tavem/Bar Sensitive Areas?(Wetlands/Slopes,etc) No Zoning Designation. CE i.- S^rte Plumbing Fixtures Dishwashers 1 Sinks 3 PERMIT EXPIRES Wednesday, June 26, 2013 Permit Issued on Friday, December 28, 2012 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and City of Federal Way. 1 f Owner or agent: Date: 1 r�/ City of Federal Way IP Certificate of Occupancy This Certificate issued pursuant to the requirements of Section 110.2 of the International Building Code certifying that at the time of issuance, this structure was in compliance with the various ordinances of the City regulating building construction or use. This certificate is valid ONLY when endorsed by City staff. Tenant Name: TIME OUT ALE HOUSE Permit#: 12-104973-00-CO Address: 34525 16TH AVE S Includes: #1 #2 #3 #4 Occupancy Class: A-2 Construction Type: Type V-B Occupancy Load: Floor Area(sq.ft.) 548 0 0 0 Owner Name: RMMLG PROPERTIES L L C Owner Address: 34525 16TH AVE S FEDERAL WAY,WA 98003 Building Official Date The priority focus in the review and inspection made by the City prior to issuance of this Certificate was on those matters which experience has shown most Beverly affect the health and safety of the general public. Although the City has made as complete a review and inspection as is reasonably possible(within budgetary time and personnel limitations), the City neither guarantees nor warrants to the owner/occupant or to any other person that this Certificate evidences strict compliance with each and every ordinance or regulation of the City or the State of Washington affecting the construction or use of said structure or the land upon which it is situated. Such compliance is the responsibility of the owner and/or occupant of the premises. J 4 iiiffi 9 I f ' " 1 `� • DATE INSPECTOI. AREA AND TYPE C ANSPECTION /. ,CSki Au �-r,4 6xr wear circ 4vo,-471 3-/� PCC_ f /,v6 MMo ^Y/4/44Cogr--, snot 4 A-T 4.44724 G/.C. J Z> .l�i ,410 50U7yY mF w4yu 44ve /4 -ok - ' CS,_,, v- cwt W V.7 f ! THIS CARD IS TO MAIN ON-SITE ' "TM OF Construction In ection Record Federal Way INSPECTION REQUE TS: (253)835-3050 PERMIT#: 12-104973-00-CO Address: 34525 16TH AVE S Project: RMMLG PROPERTIES L L C FEDERAL WAY, WA 98003-6802 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 SWM Precon Site Mtg(4400) 0 Initial Erosion Control(4365) E Footings/Setback(4110) Approved To be done prior to breaking ground Approved to place concrete By Date By Date By Date 2—/5 /'.-1( O Foundation Wall(4115) 0 Drainage/Downspout(4040) El Re-steel(4215) Approved to place concrete Approved to backfill Approved to place concrete or grout ByFt"; Date 2-/- ----/q.5By Date By Date O Plumbing Groundwork(4190) 0 Slab/Concrete Floor(4255) 0 Underfloor Framing(4285) Approved to cover Approved to place concrete Approved to sheath floor By 3---6DateZ_a)—(3 By Date -1/-13By Date o Floor Sheathing(4105) CI Shear Walls(4245) 0 Roof Sheathing(4220) Approved to install flooring Approved to install siding Approved to install roofing By Date By �A.,....- Date `i By ----- / f Date 3-c _13 O Rough Plumbing(4230) El Fire/Draft Stops(4095) ❑ Interim Erosion Control(4370) Approved Approved Approved By Date Byos1/43~ DatemL4,,t,p, By Date . Framing(4120) ❑ Insulation(4150) Prior to scheduling a Framing inspection; Approved to insulate Approved to install wallboard Electrical,Plumbing&Mechanical Rough-in and Fire/Draft Stop inspections must be signed-off and approved IBC 109.3.4 By Date _ « By ��� , �f Date 'Ac;, , o Gypsum Wallboard Nailing(4130) 0 Suspended Ceiling Grid (4265) 0 Final-Fire Department(4060) Approved to install mud&tape Approved to drop tile Approved By Date `. By nki `j..-- Date i ' •-a s-( ,3 By Date El Final-Planning El Final-Public Works(4080) 0 Final Erosion Control(4375) Approved Approved Approved By Date By Date By Date O Final-Plumbing(4075) El Final-Building(4050) Approved Approved By t _ Date -o --IA-("- By (k.)Vok Date C,' .20 ,, ,`,, , i /.._r El Rough ElectricalEl Final Electrical El Rig t of Way Approved Approved Approved By Date By Date By Date • • f i B & T DESIGN & ENGINEERING, INC . If i I T P.O. Box 595 • Issaquah.WA 98027 • Phones:425-557-0779• Fax: 425-557-0705 y.: ENGINEERING Woodman Construction, Inc. February 19,2013 3 Lake Bellevue Drive, Suite#201 Bellevue,Washington 98005 Attention: Joe McLaughlin,Project Manager Steve Tarp, Project Superintendent Re: TIME OUT ALE HOUSE AND GRILL South Addition. [City of Federal Way,WA Project# I. 34525 16th Avenue South,Federal Way,Washington 98003 Dear Mr. McLaughlin, This letter is to verify that we have performed the required"Structural Observation" on February 19,2013 and have found the structural foundation and slab depths,widths,and reinforcing placement to be in conformance with the"B&T Design and Engineering,Inc."structural SK drawings SKO1, SK02, SK03, SKO4, SK05, SK06,and SK07 dated 02/18/13. Please call if you have any questions regarding this"Structural Observation"approval letter. Sincerely, ----- ....t ..ter Jim Trueblood, Principal szjy .- gravy4Ne 14/2 ,..4. 1~ , t a4, a i.lo 2391q t4,J•_ FEBRUARY 19,2013 18&T JOB NO. 12044.11