14-103638 E Mechanical
City Federal Way
Communiy&Econ.DevServices Permit #: 14-103638-00-ME
33325 8th Ave S
Federal Way,WA 98003 Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax:(253)835-2609 p q
Project Name: HEATHER132
#17-1714-
Project Address: 29315 11TH PLS F Parcel Number: 515230 0030
Project Description: Replace gas furnace
Owner Applicant Contractor
GARY HEATHER SARAH TURNER GLENDALE HEATING&A/C
29315 11TH PL S GLENDALE HEATING&A/C GLENDHA053Q2(11/2/15)
FEDERAL WAY WA 98003-3739 12462 DES MOINES WAY S 12462 DES MOINES WAY S
SEATTLE WA 98168-2266 SEATTLE WA 98168-2266
Additional Permit information
Is this an Online or O.T.C.application? Yes
Mechanical Fixtures
Furnaces 1
PERMIT EXPIRES Sunday, January 18, 2015
Permit Issued on Tuesday, July 22, 2014
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordancewith the laws, rules and regulations of the State of Washington
a
d the City of Federal Way.
Owner or agent: 0 LINE Date:
F - 1 kip
THIS CARD IS TO MAIN ON-SITE
F a
CITY OF Construction In ection Record _
Federal Way IliNSPECTION REQ TS: (253)835-3050
PERMIT#: 14-103638-00-ME Address: 29315 11TH PL S
Project: GARY HEATHER FEDERAL WAY, WA 98003-3739
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0 Mechanical Rough-in(4165) Ei Gas Piping(4125) ❑ Final-Mechanical(4065)
Approved Approved to release test Approved
By Date By Date By Y‘ItPj Date 43- 1
-ii 1.1 1.1.--" -r
El Rough ElectricalEl Final Electrical Cl Right of Way
Approved Approved Approved
By Date By Date By Date