14-105138 110 •
Electrical
City of Federal Way FILE
Community&Econ.Dev.Services Permit #: 14-105138-00-EL
33325 8th Ave S
Federal Way,WA 98003
Ph:(253)835-2607 Fax(253)835-2609 Inspection Request Line: (253)835-3050
Project Name: FEDERAL WAY HIGH SCHOOL
Project Address: 30611 16TH AVE S Parcel Number: 082104 9001
Project Description: 2 hour load bank test on emergency standby generator
Owner Applicant Contractor
FEDERAL WAY PUBLIC SCHOOLS AMANDA NOKES PACIFIC POWER GROUP LLC DBA PACIFIC
33330 8TH AVE S PACIFIC POWER GROUP LLC DBA PACIFIC POWER GENERATION
FEDERAL WAY WA 98003 POWER GENERATION PACIFPG867D7(3/27/15)
5808 S 196TH ST 600 S 56TH PL
KENT WA 98032 RIDGEFIELD WA 98642
Additional Permit Information
Is this an Online or O.T.C.application Yes Is Use Educational or Institutional No
Service greater than 999 Amps9 No
Electrical Fixtures
Alt.Srvc/Feeder 0 to 200 amps(C 1
PERMIT EXPIRES Wednesday, April 1, 2015
Permit Issued on Friday, October 3, 2014
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: ONLINE Date:
SS)
• `iHIS CARD IS TO MAIN ON-SITE
CITY OF Construction In ction Record
Federal Way INSPECTION REQU TS: (253)835-3050
PERMIT#: 14-105138-00-EL Address: 30611 16TH AVE S
Project: FEDERAL WAY PUBLIC SCHOOLS FEDERAL WAY, WA 98003-4903
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
El UFER Ground(4295) ❑ Ditch cover(4030) El Slab/Concrete Floor(4255)
Approved Approved Approved to place concrete
By Date By Date By Date
.
.❑ Pool Bonding(4195) .0 Temporary Power(4275) ' ❑ Service(4235)
Approved Approved Approved
By Date By Date By Date
.
elD Feeders/Sub-panels(4045) 'El RoughElectrical(4225) Ceiling Cover(4020)
Approved Approved Approved
By Date By Date By Date
. . . .
#El Final-Electrical(4055)
Approved
By Date It; g 141-
.
El Rough Electrical ElFinal Electrical El Right of Way
Approved Approved Approved
By Date By Date By Date