Loading...
13-101533 • Ouiltling -. Single Family City of Federal Way il G 777--'11 Community&Econ.Dev.Services Permit #: 13-101533-00-SF 33325 8th Ave SL 9 Federal Way,WA 98003 Inspection Request Line: (253) 835-3050 Ph:(253)835-2607 Fax (253)835-2609 p Q Project Name: NAYLOR Project Address: 28023 22ND AVE S Parcel Number: 422230 0200 Project Description: REP-Remove and replace composition shingles like for like , Owner Applicant Contractor Lender THOMAS J NAYLOR NORTHWEST ROOF SERVICE INC NORTHWEST ROOF SERVICE INC OWNER IS LENDER JUDITH A NAYLOR 801 CENTRAL AVE N NORTHRS088DW(10/15/13) 28023 22ND AVE S KENT WA 98032 801 CENTRAL AVE N FEDERAL WAY WA KENT WA 98032 98003 Census Category: 555 -Non-structural roofing permits Includes: #1 #2 #3 #4 Occupancy Class: Construction Type: Occupancy Load Floor Area(sq.ft.) 0 0 0 0 Additional Permit Information Mechanical to be Included? No Number of Stories. 2 Permit for Building Shell Only9 No Plumbing to be Included? No No Fixtures Associated With This Permit !! PERMIT EXPIRES Wednesday, October 2, 2013 Permit Issued on Friday, April 5, 2013 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the Use will be in acc rdance with the la s, rules and regulations of the State of Washington / an he City of F-deral Way. Owner or agent: ,(:)/� ��' Date: 4-6 i(? . - THIS CARD IS TO MAIN ON-SITE , .. CITY OF '�'" • Construction In ection Record Federal Way INSPECTION REQUE TS: (253) 835-3050 PERMIT#: 13-101533-00-SF Address: 28023 22ND AVE S Project: THOMAS J NAYLOR FEDERAL WAY, WA 98003-9278 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. El SWM Precon Site Mtg(4400) ❑ Initial Erosion Control(4365) ❑ Footings/Setback(4110) Approved To be done prior to breaking ground Approved to place concrete By Date By Date By Date o Foundation Wall(4115) ❑ Drainage/Downspout(4040) El Re-steel(4215) Approved to place concrete Approved to backfill Approved to place concrete or grout By Date By Date By Date El Plumbing Groundwork(4190) El Slab/Concrete Floor(4255) •❑ Underfloor Framing(4285) Approved to cover Approved to place concrete Approved to sheath floor By Date By Date By Date 0 Floor Sheathing(4105) ❑ Shear Walls(4245) El Roof Sheathing(4220) Approved to install flooring Approved to install siding Approved to install roofing By Date By Date By /i.‘gi Date El Rough Plumbing(4230) El Mechanical Rough-in (4165) ❑ Gas Piping(4125) Approved Approved Approved to release test By Date By Date By Date El Fire/Draft Stops(4095) El Interim Erosion Control(4370) prior to scheduling arami Fng inspection; Approved Approved Electrical,Plumbing&Mechanical Rough-in and I Fire/Draft Stop inspections must be signed-off and By Date By Date approved. IBC 109.3.4 d • El Framing(4120) El Insulation (4150) 0 Gypsum Wallboard Nailing(4130) Approved to insulate Approved to install wallboard Approved to install mud&tape By Date By Date By Date • • 0 Suspended Ceiling Grid (4265) El Final-Fire Department(4060) El Final-Planning(4070) Approved to drop tile Approved Approved By Date By Date By Date El Final-Public Works(4080) El Final Erosion Control(4375) El Final-Mechanical(4065) Approved Approved Approved By Date By Date By Date El Final-Plumbing(4075) El Final-Building(4050) Approved Approved B Date Y By Date (_18 - ,3 El Rough Electrical Final Electrical111 Right of Way Approved Approved Approved By Date By Date By Date �,ry� PERMI PPLICATION Federal Way DECEIVED PERMIT NUMBER I /.. _ ( 0I 5 - C JF APR 0 5 2013 — — TARGET DATE CITY OF F//^^E��DtRAL WAY SITE ADDRESS SUITE/UNIICPS . -3 . - Kr.)( ii_v_e S -Jera( Wa PROJECT VALUATION ZONING ASSESSOO TAX/PAROL# 2 3 - O O O TYPE OF PERMIT ❑ BUILDING ❑ PLUMBING ❑ MECHANICAL 0 DEMOLITION 0 ENGINEERING 0 FIRE PREVENTION NAME OF PROJECT [/; /4 (tr /:. PROJECT DESCRIPTION Detailed description of work to J% C(V (.='r re voe-t' be included on this permit only NAME / PRIMARY PHONE PROPERTY OWNER n i V a. .Iza :--45-3- 39-2(i g MAILING ADDRESS 1' ,f' E-MAIL r) j�3 L4 3 st a (Lit-- 7Soo NAME ©V1 I W`i Yr 1" b."", t" YIW /.SA. `c- . PHONE-72C>7)--a3?--C $0..3 MAILING ADDRES3C,� !^ l O 41/•P rC �/ q/� ��J� CONTRACTOR iJ �� �t ^) ((S lu'1 w`C ��/�/ CITY Pc lit- STATFf ZI91030 3, WA ST E QONTRAcTows LICEN # EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE# NAME ` ( c,C� ./J '...��ior/ _ PRIMARY PHONE APPLICANT MAILING ADDRESS 3 q,�9© , ' (1\k (/' CITY d Ear Sa 6 12 mita/40 1,,, r l l,,I ,0 , '(,( �"STATE ZIP FAX NAME PRIMARY PHONE PROJECT CONTACT "Its G1 t t k( k(7 (The individual to receive and MAILING ADDRESS ��yy E-MAIL respond to all correspondence �t X14 ' l concerning this application) CITY �S 1, LLnirt v ZIP FAX PROJECT FINANCING NAME i 0 OWNER-FINANCED Required value of$5,000 or more ING--A�1DDRE �, T/, ATE,Z � iI ;ifG '`� %� / (RCW 19.27.095) PI,r ' A % 640 �J t/0/ V'v 3 /� -794 G, I certify under penalty of perjury that I am the property owner or authorized agent'df the property owner.I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct.I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with Iocal, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim(including costs, expenses, and attorneys'fees incurred in the investigation and defense of such claim), which may be made by any person,including the undersigned,and filed against the city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information supplied,to the city as`a part oft is application. SIGNATURE: i/ DATE if (s ' 3 - illi0")PRINT NAME: (t'5c-j d / Ü&o( Bulletin#100—January 1,2013 Page 1 of 3 k:\I-1andouts\Permit Application • • VALUE OF MECHANICAL WORK MECHANICAL PERMIT Indicate how many of each type of fixture to be installed or relocated as part of this project. Do not include existing fixtures to remain. AIR HANDLING UNITS FANS GAS PIPE OUTLETS OTHER(Describe) AIR CONDITIONER FIREPLACE INSERTS HOODS(commercial) BOILERS FURNACES HOT WATER TANKS(cas) COMPRESSORS GAS LOG SETS REFRIGERATION SYST DUCTING GAS PIPING WOODSTOVES VALUE OF PLUMBING WORK PLUMBING PERMIT $ Indicate how many of each type of fixture to be installed or relocated as part of this project. Do not include existing fixtures to remain. BATHTUBS(or Tub/Shower Combo) LAVS(Hand Sinks) TOILETS WATER PIPING DISHWASHERS RAINWATER SYSTEMS URINALS OTHER(Describe) DRAINS SHOWERS VACUUM BREAKERS DRINKING FOUNTAINS SINKS(kitchen/utaity) WATER HEATERS(Electric) HOSE BIBBS SUMPS WASHING MACHINES TOTAL FIXTURES GENERAL INFORMATION CRITICAL AREAS ON PROPERTY? WATER PURVEYOR SEWER PURVEYOR VALUE OF EXISTING IMPROVEMENTS EXISTING/PREVIOUS USE LOT SIZE(In Square Feet) EXISTING FIRE SPRINKLER SYSTEM? PROPOSED FIRE SUPPRESSION SYSTEM? ❑Yes ❑ No ❑Yes 0 No RESIDENTIAL - NEW OR ADDITION AREA DESCRIPTION(in square feet) EXISTING PROPOSED TOTAL FOR OFFICE USE BASEMENT FIRST FLOOR(or Mobile Home) SECOND FLOOR COVERED ENTRY DECK GARAGE 0 CARPORT 0 OTHER(describe} EXISTING PROPOSED TOTAL Area Totals **l l/ir ONLY** ESTIMATED SELLING PRICE$ #OF BEDROOMS COMMERCIAL-NEW/ADDITION AREA DESCRIPTION Area Occupancy Group(s) Construction #of Additional Information in Square Feet Type Stories NEW BUILDING ADDITION COMMERCIAL-REMODEL/TENANT IMPROVEMENTS AREA DESCRIPTION Area Occupancy Group(s) Construction #of Additional Information in Square FeetType Stories TOTAL BUILDING TENANT AREA ONLY PROJECT AREA ONLY Bulletin#100—January 1,2013 Page 2 of 3 k:\Handouts\Permit Application