16-100231 •
•
Mechanical
City of Federal Way .({,�,�
Community&Econ.Dev.Services Permit #: 16-1 00231-00-M E
33325 8th Ave S
Federal Way,WA 98003 Inspection Ph:(253)835-2607 Fax:(253)835-2609 FILE nS Request p q est Line: (253)835-3050
Project Name: HAINER
Project Address: 29146 23RD PL S Parcel Number: 422292 0010
Project Description: Install llkw standby generator with 10' gas piping
Owner Applicant Contractor
MARK R HAINER NORTHWEST PERMIT/WESCO WASHINGTON ENERGY SERVICES CO
GLINDA J HAINER 1345 W GULF RD (GENERAL)
29146 23RD PLS POINT ROBERTS WA 98281 WASHIES851NS(9/7/17)
FEDERAL WAY WA 98003-7946 3909 196TH ST SW
LYNNWOOD WA 98036
Additional Permit Information
Mechanical Work Valuation? 6469.89 Is this an.Online or O.T.C.application Yes
Mechanical Fixtures
Gas Piping 1
CONDITIONS:
A permanently installed generator is not allowed to be placed within required yards(setbacks). See Bulletin
#150 for placement details.
PERMIT EXPIRES Wednesday, July 13, 2016
Permit Issued on Friday, January 15, 2016
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agentN L I E Date:
THIS CARD IS TO MAIN ON-SITE
CITY OF
• Construction In ection Record
Federal Way INSPECTION REQUE TS: (253)835-3050
PERMIT#: 16-100231-00-ME Address: 29146 23RD PL S
Project: MARK R HAINER FEDERAL WAY, WA 98003-7946
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0 Mechanical Rough-in(4165) 0 Gas Piping(4125) El Final-Mechanical(4065)
Approved Approved to release test Approved
'By Date B Date /(, —/6 fry....... .. Date e)...- ,
/2
....r2=....
❑ Rough Electrical Final Electrical El Right of Way
Approved Approved Approved
By Date By Date By Date