Loading...
17-103486 Mechanical City of Federal way L E Permit #:17-103486-00-ME Community Development Dept. F ' 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 Project Name: DILLEY Project Address: 31326 13TH AVE.S Parcel Number:787520 0030 Project Description: Install Ductless Heat Pump Owner Applicant Contractor MARY DILLEY SUSAN DUNHAMBLACK HILLS INC BLACK HILLS INC(GENERAL) 31326 13TH AVE S 1003 85TH AVE SE UNIT A BLACKHI066JL(7/19/19) FEDERAL WAY WA OLYMPIA WA 98501 98003 1003 85TH AVE SE UNIT A OLYMPIA WA 98501-5706 Additional Permit Information Mechanical Work Valuation? 4617 Is this an Online or O.T.C.application? Yes Compressors/Heat Pumps 1 PERMIT EXPIRES Tuesday, 16 January,2018 Permit Issued on Thursday,July 20,2017 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the Ci of Federal Way. Owner or agent: 111- Date: THIS CARD IS TO REMAIN ON-SITE CRY Of Construction Inspection Record Federal Way INSPECTION REQUESTS:(253)835-3050 PERMIT#: 17 103486 00 Address: 3132613TH AVE S Project: MARY DILLEY FEDERAL WAY WA 98003-5313 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 Mechanical Rough-in(4165) ® Gas Piping(4125) 0 Final-Mechanical(4065) Approved Approved to release test Approved •By Date ,4 By Date . By Wu* Date 114%111 11 • 0 Rough Electrical 0 Final Electrical 0 Right of Way Approved Approved Approved By Date By Date By Date