17-105521 a
Electrical
City of Federal Way Permit #:17-105521-00-EL
Community Development Dept.
33325 8th Ave S
Federal Way,WA 98003ILE Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax:(253)835-2609
Project Name: DAY-CHAMBERS
Project Address: 32804 42ND AVE SW Parcel Number:873203 0270
Project Description: New circuit to gas furnace
Owner Applicant Contractor
BARBARA DAY-CHAMBERS NANCY BARRADALEMERCURIO'S MERCURIO'S HEATING&A/C
32804 42ND AVE SW HEATING&A/C (ELECTRICAL)
FEDERAL WAY WA 98023 4001 S UNION AVE MERCUHA889K9(5/29/18)
TACOMA WA 98409 4001 S UNION AVE
TACOMA WA 98409
Additional Permit information
Is this an Online or O.T.C.application? Yes
Circuits-Residential 1
PERMIT EXPIRES Wednesday,14 November,2018
Permit Issued on Tuesday,November 14,2017
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the Ci of Federal Way.
Owner or agent: O1\I I N Date:
1
OZ%' THIS CARD IS TO REMAIN ON-SITE
Federal Way Construction Inspection Record
INSPECTION REQUESTS:(253)835-3050
PERMIT#: 17 105521 00 Address: 32804 42ND AVE SW
Project: BARBARA DAY-CHAMBERS FEDERAL WAY WA 98023-2624
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE TRIS CARD. Inspections are listed as close to sequential order as possible
(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
I❑ UFER Ground(4295) ..
El Ditch cover(4030) •.0 Slab/Concrete Floor(4255) '
Approved Approved Approved to place concrete
By Date By Date B• y Date
® Pool Bonding(4195) • El Temporary Power(4275) ® Service(4235)
Approved Approved Approved
By Date By Date ).By Date
❑ Feeders/Sub-panels(4045) • ® Rough Electrical(4225) ® Ceiling Cover(4020)
Approved Approved Approved
By Date ' By Date By Date
El Final-Electrical(4055)
Approved
By Date I,—23–t 2-
Rough Electrical E Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date