16-104726 ` E et trtcal
City of Fen.Dev.&Econ. Services Permit#: 16-104726-00-EL
33325 8th Ave S
Federal Way,WA 98003 Inspection Request Line: (253)835-3056
Ph:(253)835-2607 Fax:(253)835-2609 p a
Project Name: BARCELO HOMES LOT 4
Project Address: 3811 S 326TH ST Parcel Number: 152104 9022
Project Description: Rough in of 3300sq ft house with Ufer Ground
Owner Applicant Contractor
BARCELO HOMES INC. GENNADIY ROMANENKO NW-ELECTRICAL LLC
PO BOX 1733 NW ELECTRICAL LLC NWELEEL886NP(8/26/18)
AUBURN WA 98071-1733 8507 SW LUZADER LN 8507 LUZADER LN SW
LAKEWOOD WA 98499-2029 LAKEWOOD WA 98499
Additional Permit Information
Electrical Work Valuation? 10000 Is this an Online or O.T.C.application? Yes
Is Use Educational or Institutional? No
Electrical Fixtures
New Service:Residential 3,30C Thermostat. 1
PERMIT EXPIRES Thursday, September 21, 2017
Permit Issued on Wednesday, September 21, 2016
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: Date:
,THIS CARD IS TO REMAIN ON-SITE , ,
CITY Or Construction Inspection Record
Federal Way INSPECTION REQUESTS:(253)835-3050
PERMIT#: 16-104726-00-EL Address: 3811 S 326TH ST
Project: BARCELO HOMES INC. FEDERAL WAY, WA
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
El UFER Ground (4295) El Ditch cover(4030) 0 Slab/Concrete Floor(4255)
Approved Approved Approved to place concrete
By Rr.� Date 912 ///¢ `By Date,\ ,..., � `� By Date
El Pool Bonding(4195)) 0 Temporary Power(4275) El Service(4235)
Approved Approved Approved
By Date By Date By A Date t o..'1A,t1
O Feeders/Sub-panels(4045) ❑ Rough Electrical(4225) El Ceiling Cover(4020)
Approved Approved Approved
By Date `By Date �yI$-\ ,) By Date
V\A")) .
O Final-Electrical(4055)
Approved
By L,(4t..1._., Date Q, -3,, l ve
•
El Rough ElectricalEl Final Electrical El Right of Way
Approved Approved Approved
By Date By Date By Date