Loading...
14-101097 c s. y Plumbing City of Federal Way • •�+ Community&Econ.Dev.Services 33325 8th Ave S FILE Permit #: 14-101097-00-PL Federal Way,WA 98003 Request ection Ph:(253)835-2607 Fax (253)835-2609 InS p q est Line: (253)835-3050 Project Name: BOHM Project Address: 4902 SW 330TH ST Parcel Number: 802951 0120 Project Description: Installing new tub,shower,sinks and faucets )414 Owner Applicant Contractor ROBERT D BOHM CARRIE KINKADE RENEWAL CONSTRUCTION INC GEORGIA BOHM RENEWAL CONSTRUCTION INC RENEWCI995NW(8/16/14) 5934 E CALLE DEL NORTE 14110 CANYON RD E 14110 CANYON RD E PHOENIX,AZ 85018 PUYALLUP WA 98373 PUYALLUP WA 98373 Plumbing Fixtures Bathtubs 1 Drains 1 Lavatories 2 Showers 1 Sinks 2 PERMIT EXPIRES Sunday, September 7, 2014 Permit Issued on Tuesday, March 11, 2014 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in aellecalligeOrsaitMive laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent Date: THIS CARD IS TO MAIN ON-SITE , CITY OF Way • Construction In ection Record INSPECTION REQUE TS: (253)835-3050 PERMIT#: 14-101097-00-PL Address: 4902 SW 330TH ST Project: ROBERT D BOHM FEDERAL WAY, WA 98023-3328 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 Plumbing Groundwork(4190) - ❑ Rough Plumbing(4230) E Gas Piping(4125) Approved to cover Approved Approved to release test By Date .B Date � _� •By Date Final-Plumbing(4075) Approved By Date kt, _2 ` k Rough Electrical ❑ El Final Electrical Right of Way Approved Approved Approved By Date By Date By Date