Loading...
16-101091 • . a : Plumbing Community City &Econ.Devof Federalv..S rvices Permit #: 16-101091-00-PL 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: Ph:(253)835-2607 Fax:(253)835-2609 P (253)835-3050 FILE . Project Name: PINA Project Address: 2723 SW 322ND PL Parcel Number: 873190 0370 Project Description: Conversion of bathtub to roll in shower • Owner Applicant Contractor JAMES HUBATKA NICHOLAS SARY BATH PLUS INC TERI ET PINA BATH PLUS INC BATHPPI908Q4(11/24/16) 2723 SW 322ND PL 1427 NE 130TH AVE 1427 130TH AVE NE FEDERAL WAY WA 98023 BELLEVUE WA 98005 BELLEVUE WA 98005 Plumbing Fixtures' Showers 1 PERMIT EXPIRES Monday, August 29, 2016 Permit Issued on Wednesday, March 2, 2016 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: 0 NJ I. I N E Date: 1110i 11%1 ‘,...e° F ` • THIS CARD IS Tt MAIN ON-SITE - CITY OF Construction Inspection Record Federal Way INSPECTION REQUESTS: (253)835-3050 PERMIT#: 16-101091-00-PL Address: 2723 SW 322ND PL Project: JAMES HUBATKA FEDERAL WAY, WA 98023-2257 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 Plumbing Groundwork(4190) ❑ Rough Plumbing(4230) - El Gas Piping(4125) Approved to cover Approved Approved to release test By Date By p» Date 3)4/`CPBy Date ❑ Final-Plumbing(4075) Approved By %i Date 5115(1 to 0 Rough ElectricalEl Final Electrical El Right of Way Approved Approved Approved By Date By Date By Date