Loading...
18-100202 R , . . .. r s Mechanical City of Federal Way Permit #:18-100202-00-ME Community Development Dept. 33325 8th Ave S Federal Way,WA 98003 .- Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 a f Project Name: DUONG Project Address: 2973 S 296TH 51-rsw — Parcel Number: 868040 0330 Project Description: Install 3-ton Heat Pump Owner Applicant Contractor MAI TRAM T DUONG JAIMIE HOWBRENNAN HEATING&A/C BRENNAN HEATING&A/C LLC 2973 S 296TH ST 4601 S 134TH PL (GENERAL 01) FEDERAL WAY WA 98003 SEATTLE WA 98168 BRENNHA971R9(12/29/19) 4601 S 134TH PL TUKWILA WA 98168 Additional Permit Information Mechanical Work Valuation? 4655 Is this an Online or O.T.C.application? Yes �a Compressors/Heat Pumps 1 PERMIT EXPIRES Monday,16 July,2018 Permit Issued on Wednesday,January 17,2018 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: ONLINE Date: Tr) y a , .- - i THIS CARD IS TO REMAIN ON-SITE Faders! Construction Ins ection Record INSPECTION REQUESTS:(253)835-3050 PERMIT#: 18 100202 00 Address: 2973 S 296TH PL Project: MAI TRAM T DUONG FEDERAL WAY WA 98003-8035 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 Mechanical Rough-in(4165) I:1 Gas Piping(4125) 0 Final-Mechanical(4065) Approved Approved to release test Approved .By Date 1. By Date ..BY h4 Date 1 74 (g Rough Electrical 0 Final Electrical Right of Way Approved Approved Approved By Date By Date By Date