Loading...
13-100449 1 ee1ianical Citi Federal Way Permit • 13- 00449-00-M E Communi &Econ.Dev.Services 33325 8th Ave SFILE Federal Way,WA 98003 Inspection equest ine: (253)835-3050 Ph:(253)835-2607 Fax (253)835-2609 Project Name: OWEN Project Address: 3310 SW 332ND ST arcel N ber: 109976 0140 Project Description: Replace existing gas furnace,like for like ��g°1 Owner Applicant Cont acto KYLE J OWEN JAIMIE HOW BRENNAN HEA I G t A/C LLC 3310 332ND PL SW BRENNAN HEATING&A/C (GENE ) FEDERAL WAY WA 98023 4601 S 134TH PL BRENNHA971R9(12/29/13) SEATTLE WA 98168 4601 S 134TH PL TUKWILA WA 98168 • Additional Permit Information Is this an Online or O.T.C.application? Yes Mechanical Fixtures Furnaces 1 PERMIT EXPIRES Sunday, July 28, 2013 Permit Issued on Tuesday, January 29, 2013 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: 0191. 1 N E Date: ` THIS•CARD IS TO MAIN ON-SITE CITY OF • Federal WayConstruction In ection Record ' INSPECTION REQUE TS: (253)835-3050 PERMIT#: 13-100449-00-ME Address: 3310 SW 332ND ST Project: KYLE J OWEN FEDERAL WAY, WA 98023-2724 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 Mechanical Rough-in(4165) CI Gas Piping(4125) 0 Final-Mechanical(4065) Approved Approved to release test Approved 'By Date By Date By v,Ap Date ‘, 11,2_, i tt El Rough Electrical El Final Electrical El Right of Way Approved Approved Approved By Date By Date By Date